Subak Raftar 102DN — within 15 minutes of the scheduled time 26% of the time, typically 29 minutes late, over 24 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Wazirabad Jn to Gujranwala it typically adds 5 min, from 48 recorded runs. At Gujranwala it has typically arrived 43 minutes late, from 75 recorded runs.
Every train, compared
7 of 7 with 7+ daysOver this leg is the CHANGE in a train's delay between Wazirabad Jn and Gujranwala on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Wazirabad Jn — no booked arrival at Wazirabad Jn to measure from at all. Figures cover runs recorded between 30 July 2026 and 20 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 2Khyber Mail 2DN | 05:33 +1d | 06:00 +1d | 27 min | not measured yet | +1h 58m | 8% | adds 2 min · 28 |
| 206Babu passenger 206 dn | 05:58 | 06:37 | 39 min | not measured yet | +1h 14m | 0% | makes up 1 min · 14 |
| 102Subak Raftar 102DN | 10:27 | 10:52 | 25 min | 31 km | +29 min | 26% | adds 5 min · 48 |
| 8Tezgam 8DN | 11:42 | 12:10 | 28 min | not measured yet | +1h 08m | 17% | no change · 60 |
| 40Jaffar Express 40DN | 13:27 | 13:55 | 28 min | not measured yet | +52 min | 20% | adds 2 min · 47 |
| 14Awam Express 14DN | 16:34 | 17:00 | 26 min | not measured yet | +1h 22m | 15% | adds 7 min · 54 |
| 104Subak Kharam 104DN | 20:00 | 20:25 | 25 min | 31 km | +44 min | 19% | adds 4 min · 48 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Khyber Mail 2DN2خیبر میل 2 ڈائون05:33 +1d→06:00 +1d27 min8% on time · +1h 58madds 2 min over this leg · 28 runs
- Babu passenger 206 dn206بابو پسنجرز 206 ڈاؤن05:58→06:3739 min0% on time · +1h 14mmakes up 1 min over this leg · 14 runs
- Subak Raftar 102DN102سبک رفتار102 ڈاؤن10:27→10:5225 min26% on time · +29 minadds 5 min over this leg · 48 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن11:42→12:1028 min17% on time · +1h 08mno change over this leg · 60 runs
- Jaffar Express 40DN40جعفر ایکسپریس 40 ڈائون13:27→13:5528 min20% on time · +52 minadds 2 min over this leg · 47 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون16:34→17:0026 min15% on time · +1h 22madds 7 min over this leg · 54 runs
- Subak Kharam 104DN104سبک خرام 104 ڈاؤن20:00→20:2525 min19% on time · +44 minadds 4 min over this leg · 48 runs
Travelling the other way? Gujranwala to Wazirabad Jn trains →
Common questions
How many trains run from Wazirabad Jn to Gujranwala?
7 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Wazirabad Jn to Gujranwala?
Subak Raftar 102DN, booked at 25 min for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Wazirabad Jn to Gujranwala is most likely to be on time?
Subak Raftar 102DN has the best recorded punctuality of the services we hold enough history for: 26% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 29 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 7 of 7 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Wazirabad Jn to Gujranwala?
Not on the current timetable. Every service on this route is booked to arrive on the same day it departs.
Do trains lose time between Wazirabad Jn and Gujranwala?
Typically yes. Awam Express 14DN adds about 7 min to its delay over this leg, measured across 54 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Wazirabad Jn to Gujranwala by train?
It is about 31 km along the track. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 2 of the 7 services; the rest of the track on this route has not been traced yet.
Are these Wazirabad Jn to Gujranwala timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.