latetrains.pkLate, on recordTrain delays · independent
Trains/Multan–Dera Ghazi Khan/Dgk Shuttle 228DN

228 Dgk Shuttle 228DN ڈیرہ غازی خان شٹل 227 ڈاؤن

Kitni late hoti hai? Typical delay, on-time record aur station timings.
MULTANDERA GHAZI KHANMULTAN
Down direction · returnsملتان کینٹ ۔ ڈیرہ غازی خان ۔ ملتان کینٹ
In service since 2025ShuttleLast seen 21 November 2026114 days tracked

How late is it, usually?

median per recorded stop arrival

Every figure here is a median, not an average: why we publish a median, not an average. What counts as on time, and why some figures here are blank, is set out in what on time means here, and every threshold behind it.

At Dera Ghazi Khan+57 minmedian of 12 recorded arrivals · 2 Aug – 18 Nov 2026
Typical delay, any stop+1h 07mat a station this train calls at, not necessarily where you board · last 28 days
On time (within 15 min)2% of recorded stop arrivals
Bad day (90th percentile)+1h 47mworse than nine tenths of recorded stop arrivals

21 days of recorded arrivals.

Over 12 recorded arrivals (2 Aug – 18 Nov 2026), Dgk Shuttle 228DN has typically reached Dera Ghazi Khan around 10:27 the day it leaves — on the worst one run in ten, past 10:35 the day it leaves, at Dera Ghazi Khan itself.

The “At Dera Ghazi Khan” tile above is the arrival at the end of the run; “Typical delay, any stop” averages every stop including the earlier ones, so it usually reads smaller. Where the time goes, below, shows every stop we have recorded.

How long does it take?

scheduled vs recorded

Scheduled 4h — Multan Cantt to Dera Ghazi Khan. Typically 4h 57m, 57 min longer.

What these figures cover
  • Scheduled — the current timetable, Multan Cantt 05:30 to Dera Ghazi Khan 09:30
  • Typical journey — from the scheduled departure to the recorded arrival at Dera Ghazi Khan; the median of 12 runs
  • Bad day — 5h 05m at the 90th percentile: nine runs in ten come in under it
  • Keyline — the scheduled time. The solid bar is the typical journey, the faint bar behind it the bad day.
  • Recorded arrivals: 2 August to 18 November 2026.
  • End to end. For a shorter leg, the stop times are in the timetable below.

Which day is worst?

mean minutes late per recorded arrival, 8-week window
Mon+55 min · 4 runs
Tue+1h 15m · 4 runs
Wedno data
Thu+1h 22m · 3 runs
Fri+1h 15m · 3 runs
Sat+1h 15m · 3 runs
Sun+1h 05m · 3 runs

This is a mean over an 8-week window, not the median (typical) figure above — the two are not directly comparable.

Where the time goes

late at Sher Shah Jn, and later after

Leaves Sher Shah Jn +34 min · reaches Dera Ghazi Khan +57 min — +23 min lost along the way.

  1. Multan Cantt05:30ملتان کینٹ—
  2. Sher Shah Jn05:52شیرشاہ جنکشن+34 min
  3. Muzaffargarh06:10مظفر گڑھ+42 min
  4. Kot Addu07:20کوٹ ادو+47 min
  5. Shadan Lund08:10شادن لنڈ+55 min
  6. Dera Ghazi Khan09:30ڈیرہ غازی خان+57 min

Where it stands longest past the timetableshortest to longest recorded

  1. Kot Adduscheduled 5 min1–13 min
  2. Shadan Lundscheduled 2 min1–8 min
  3. Sher Shah Jnscheduled 2 min1–16 min
  4. Muzaffargarhscheduled 2 min1–9 min
What the marks mean
  • Solid bar — the typical delay at that stop (median of recorded arrivals)
  • Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
  • No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
  • — (no solid bar either) — fewer than 3 recorded runs at that stop
  • A negative figure means the train typically ran early at that stop, not late
  • Band — the shortest and the longest stand recorded at that stop. The train has left as early as the first figure.
  • Keyline — the scheduled stop, arrival to departure on the timetable below.
  • Why a train stands is not recorded — a crossing, a loco change and a red signal all look the same on the clock.
  • The five stops that stand longest past the timetable, not every stop — most routes have more. A stop qualifies with 7 or more runs timed in and out, and is skipped where the timetable books no stop, books one over an hour, or where any recorded stand ran past three hours.
  • Most time is lost between Sher Shah Jn and Muzaffargarh (+8 min)
  • Every stop on the current timetable is listed, in order, measured or not.

Timetable

scheduled → actual, 19 November 2026 run

The second time in a cell is what actually happened on the 19 November 2026 run. See the whole run →

#StationArrivalDeparture
1Multan Cantt—05:30
2Sher Shah Jn05:50 → 07:4905:52 → 07:51
3Muzaffargarh06:08 → 08:1306:10 → 08:22
4Kot Addu07:1507:20
5Shadan Lund08:08 → 10:2608:10 → 10:28
6Dera Ghazi Khan09:3009:30
What the marks mean
  • → 21:28 — actual time on the 19 November 2026 run
  • ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
  • +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
  • Blank — not recorded

A full recorded run: 10 August 2026 →

Station by station, last 5 days

17 arrivals recorded

One mark per day, newest first.

A run’s GPS trail is decoded after the journey completes — recent days may link later.

  • 2Sher Shah Jnscheduled 05:50+1h283 days
    DayArrivedDelayRecorded by
    Thu 19 Nov07:49+2hPakistan Railways (journey record)
    Wed 18 Novnot recorded—
    Tue 17 Nov07:17+1h28Pakistan Railways (journey record)
    Mon 16 Nov06:25+36mPakistan Railways (journey record)
    Sun 15 Novnot recorded—

    Seen on 3 of 5 days, ranging +36m to +2h. Every train at Sher Shah Jn →

  • 3Muzaffargarhscheduled 06:08+44m5 days
    DayArrivedDelayRecorded by
    Thu 19 Nov08:13+2h06Pakistan Railways (journey record)
    Wed 18 Nov06:41+33mPakistan Railways (journey record)
    Tue 17 Nov07:55+1h47Pakistan Railways (journey record)
    Mon 16 Nov06:52+44mPakistan Railways (journey record)
    Sun 15 Nov06:35+28mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +28m to +2h06. Every train at Muzaffargarh →

  • 4Kot Adduscheduled 07:15+52m2 days
    DayArrivedDelayRecorded by
    Thu 19 Novnot recorded—
    Wed 18 Nov08:06+52mPakistan Railways (journey record)
    Tue 17 Novnot recorded—
    Mon 16 Novnot recorded—
    Sun 15 Nov08:07+52mPakistan Railways (journey record)

    Seen on 2 of 5 days. Every train at Kot Addu →

  • 5Shadan Lundscheduled 08:08+1h045 days
    DayArrivedDelayRecorded by
    Thu 19 Nov10:26+2h19Pakistan Railways (journey record)
    Wed 18 Nov08:48+40mPakistan Railways (journey record)
    Tue 17 Nov10:05+1h57Pakistan Railways (journey record)
    Mon 16 Nov09:11+1h04Pakistan Railways (journey record)
    Sun 15 Nov08:57+49mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +40m to +2h19. Every train at Shadan Lund →

  • 6Dera Ghazi Khanscheduled 09:30+1h2 days
    DayArrivedDelayRecorded by
    Thu 19 Novnot recorded—
    Wed 18 Nov10:27+57mPakistan Railways (journey record)
    Tue 17 Novnot recorded—
    Mon 16 Novnot recorded—
    Sun 15 Nov10:32+1h02Pakistan Railways (journey record)

    Seen on 2 of 5 days, ranging +57m to +1h02. Every train at Dera Ghazi Khan →

What the marks mean
  • Tap a station — each day’s arrival, delay and recorder
  • Green — within 15 minutes of the scheduled time
  • Amber — 16 to 45 minutes late
  • Red — over 45 minutes late
  • Hollow — not recorded that day
  • Grey — arrived, no delay figure
  • Dash (—) — no delay figure for this stop yet
  • Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
  • The starting station is not listed — a train does not arrive where it begins.

Common questions

Is Dgk Shuttle 228DN usually late?

Typically 57 minutes late arriving at Dera Ghazi Khan, measured across 12 recorded arrivals (2 Aug – 18 Nov 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.

How late is Dgk Shuttle 228DN on a bad day?

On the worst one run in ten, 65 minutes late into Dera Ghazi Khan, against a typical 57 minutes late. Both come from the same 12 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.

What time does Dgk Shuttle 228DN leave Multan Cantt?

05:30, on the current published timetable. It is booked into Dera Ghazi Khan at 09:30, the day it leaves. Those are booked times. The delay figures on this page are what we recorded against them.

How long does Dgk Shuttle 228DN take from Multan Cantt to Dera Ghazi Khan?

4h on the timetable. In practice a typical run has taken 4h 57m, measured from recorded arrivals at Dera Ghazi Khan.

How many stops does Dgk Shuttle 228DN make?

6 on the current published timetable, from Multan Cantt to Dera Ghazi Khan. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.

Service history (first year, operating eras) is drawn from Wikipedia's List of Pakistan Railways trains, retrieved 15 August 2026, matched on train number.