Bhiria Road to Mehrabpur
Hazara Express 11UP — within 15 minutes of the scheduled time 24% of the time, typically 53 minutes late, over 8 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Bhiria Road to Mehrabpur it typically makes up 6 min, from 35 recorded runs. At Mehrabpur it has typically arrived 78 minutes late, from 41 recorded runs.
Every train, compared
6 of 7 with 7+ daysOver this leg is the CHANGE in a train's delay between Bhiria Road and Mehrabpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Bhiria Road — no booked arrival at Bhiria Road to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 37Fareed Express 37UP | 01:57 +1d | 02:20 +1d | 23 min | 27 km | +1h 25m | 6% | adds 1 min · 29 |
| 145Sukkur Express 145UP | 05:37 +1d | 06:06 +1d | 29 min | 28 km | — | — | adds 6 min · 32 |
| 11Hazara Express 11UP | 13:04 | 13:35 | 31 min | 27 km | +53 min | 24% | makes up 6 min · 35 |
| 13Awam Express 13UP | 14:30 | 14:55 | 25 min | 27 km | +1h 50m | 5% | adds 3 min · 36 |
| 47Rehman Baba Express 47UP | 17:37 | 18:10 | 33 min | 27 km | +1h 32m | 11% | makes up 5 min · 36 |
| 9Allama Iqbal Express 9UP | 21:01 | 21:20 | 19 min | 27 km | +3h 58m | 4% | no data |
| 17Millat Express 17UP | 22:25 | 22:51 | 26 min | 27 km | +3h 34m | 0% | makes up 2 min · 37 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Fareed Express 37UP37فرید ایکسپریس 37 اپ01:57 +1d→02:20 +1d23 min6% on time · +1h 25madds 1 min over this leg · 29 runs
- Sukkur Express 145UP145سکھر ایکسپریس145اپ05:37 +1d→06:06 +1d29 minno delay figure yetadds 6 min over this leg · 32 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ13:04→13:3531 min24% on time · +53 minmakes up 6 min over this leg · 35 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ14:30→14:5525 min5% on time · +1h 50madds 3 min over this leg · 36 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ17:37→18:1033 min11% on time · +1h 32mmakes up 5 min over this leg · 36 runs
- Allama Iqbal Express 9UP9علامہ اقبال ایکسپریس 9 اپ21:01→21:2019 min4% on time · +3h 58mno data over this leg
- Millat Express 17UP17ملت ایکسپریس 17 اپ22:25→22:5126 min0% on time · +3h 34mmakes up 2 min over this leg · 37 runs
Travelling the other way? Mehrabpur to Bhiria Road trains →
Common questions
How many trains run from Bhiria Road to Mehrabpur?
7 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Bhiria Road to Mehrabpur?
Allama Iqbal Express 9UP, booked at 19 min for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Bhiria Road to Mehrabpur is most likely to be on time?
Hazara Express 11UP has the best recorded punctuality of the services we hold enough history for: 24% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 53 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 6 of 7 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Bhiria Road to Mehrabpur?
Not on the current timetable. Every service on this route is booked to arrive on the same day it departs.
Do trains lose time between Bhiria Road and Mehrabpur?
Typically yes. Sukkur Express 145UP adds about 6 min to its delay over this leg, measured across 32 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Bhiria Road to Mehrabpur by train?
It is between 27 and 28 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails.
Are these Bhiria Road to Mehrabpur timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.