9 Allama Iqbal Express 9UP علامہ اقبال ایکسپریس 9 اپ
How late is it, usually?
median per recorded stop arrivalEvery figure here is a median, not an average: why we publish a median, not an average. What counts as on time, and why some figures here are blank, is set out in what on time means here, and every threshold behind it.
25 days of recorded arrivals.
Over 50 recorded arrivals (31 Jul – 18 Nov 2026), Allama Iqbal Express 9UP has typically reached Sialkot Jn around 21:44 the day after it leaves — on the worst one run in ten, past 23:50 the day after it leaves, at Sialkot Jn itself.
The “At Sialkot Jn” tile above is the arrival at the end of the run; “Typical delay, any stop” averages every stop including the earlier ones, so it usually reads smaller. Where the time goes, below, shows every stop we have recorded.
How long does it take?
scheduled vs recordedScheduled 26h 20m — Karachi Cantt to Sialkot Jn. Typically 30h 14m, 3h 54m longer.
Timetable: out 15:30, in at 17:50 the next day — one night on board.
What these figures cover
- Scheduled — the current timetable, Karachi Cantt 15:30 to Sialkot Jn 17:50 the next day
- Typical journey — from the scheduled departure to the recorded arrival at Sialkot Jn; the median of 50 runs
- Bad day — 32h 20m at the 90th percentile: nine runs in ten come in under it
- Keyline — the scheduled time. The solid bar is the typical journey, the faint bar behind it the bad day.
- Recorded arrivals: 31 July to 18 November 2026.
- End to end. For a shorter leg, the stop times are in the timetable below.
Which day is worst?
mean minutes late per recorded arrival, 8-week windowThis is a mean over an 8-week window, not the median (typical) figure above — the two are not directly comparable.
Where the time goes
most of it lost after Karachi CanttLeaves Karachi Cantt 12 min early · reaches Sialkot Jn +3h 54m — +4h 06m lost along the way.
- Karachi Cantt15:30کراچی کينٹ12 min early
- Drigh Road15:52ڈرگ روڈ+58 min
- Landhi Jn.16:12لانڈھی جنکشن+58 min
- Kotri Jn17:58کوٹری جنکشن+1h 56m
- Hyderabad Jn18:20حیدرآباد جنکشن+2h 08m
- Tando Adam19:21ٹنڈو آدَم+2h 17m
- Nawabshah Jn.20:10نوابشاہ جنکشن+2h 35m
- Mehrabpur21:22محراب پور+3h 10m
- Gambat21:52گامبٹ+3h 16m
- Rohri Jn.00:05روہڑی جنکشن+5h 38m
- Ghotki01:12گھوٹکی+3h 06m
- Sadiqabad02:50صادق آباد+2h 45m
- Rahim Yar Khan03:20رحیم یار خان+2h 38m
- Khanpur Jn.04:00خانپور جنکشن+2h 51m
- Dera Nawab Sahib05:00ڈیرہ نواب صاحب+3h 12m
- Bahawalpur05:40بہاولپور+3h 28m
- Lodhran Jn06:02لودهراں جنکشن+3h 27m
- Dunyapur06:28دنیاپور+3h 39m
- Jahania06:52جہانیاں+3h 35m
- Khanewal Jn07:50خانیوال+3h 29m
- Mian Channu08:27مِياں چنُّوں+3h 49m
- Chichawatni09:02چِچہ وطنى+3h 46m
- Sahiwal09:38ساہِيوال+3h 51m
- Okara10:07اوکاڑا+4h 02m
- Pattoki10:42پتّوكى+4h 05m
- Kot Radha Kishan11:06کوٹ رادھا کشن+4h 13m
- Raiwind Jn.11:30راۓوِنڈ جنکشن+4h 04m
- Kot Lakhpat12:02کوٹ لکھپت+4h 12m
- Lahore Jn.13:05لاہور جنکشن+4h 03m
- Shahdara Bagh Jn13:24شاہدرہ باغ جنکشن+4h 32m
- Narang14:26نارنگ+4h 41m
- Baddomalhi14:57بدوملہی+4h 29m
- Narowal Jn15:35نارووال جنکشن+4h 36m
- Qila Sobha Singh16:12قلعہ سوبھا سنگھ+4h 35m
- Pasrur16:38پسرور+4h 30m
- Chawinda17:02چونڈہ+4h 27m
- Sialkot Jn17:50سیالکوٹ جنکشن+3h 54m
Where it stands longest past the timetableshortest to longest recorded
- Lahore Jn.scheduled 35 min4 min–2h 32m
- Khanewal Jnscheduled 25 min22–51 min
- Hyderabad Jnscheduled 5 min8–42 min
- Qila Sobha Singhscheduled 2 min2–14 min
- Narowal Jnscheduled 5 min5–24 min
What the marks mean
- Solid bar — the typical delay at that stop (median of recorded arrivals)
- Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
- No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
- — (no solid bar either) — fewer than 3 recorded runs at that stop
- A negative figure means the train typically ran early at that stop, not late
- Band — the shortest and the longest stand recorded at that stop. The train has left as early as the first figure.
- Keyline — the scheduled stop, arrival to departure on the timetable below.
- Why a train stands is not recorded — a crossing, a loco change and a red signal all look the same on the clock.
- The five stops that stand longest past the timetable, not every stop — most routes have more. A stop qualifies with 7 or more runs timed in and out, and is skipped where the timetable books no stop, books one over an hour, or where any recorded stand ran past three hours.
- Most time is lost between Gambat and Rohri Jn. (+2h 22m)
- Every stop on the current timetable is listed, in order, measured or not.
Timetable
scheduled → actual, 20 November 2026 runThe second time in a cell is what actually happened on the 20 November 2026 run.
| # | Station | Arrival | Departure |
|---|---|---|---|
| 1 | Karachi Cantt | — | 15:30 |
| 2 | Drigh Road | 15:50 → 17:40·PR | 15:52 |
| 3 | Landhi Jn. | 16:10 → 18:04·PR | 16:12 |
| 4 | Kotri Jn | 17:56 → 20:43·PR | 17:58 |
| 5 | Hyderabad Jn | 18:15 → 20:59·PR | 18:20 → 21:13 |
| 6 | Tando Adam | 19:19 → 22:11·PR | 19:21 → 22:16 |
| 7 | Nawabshah Jn. | 20:05 → 23:19·PR | 20:10 → 23:30 |
| 8 | Mehrabpur | 21:20 → 01:10·PR | 21:22 |
| 9 | Gambat | 21:50 → 02:19·PR | 21:52 |
| 10 | Rohri Jn. | 23:40 → 03:20·PR | 00:05 → 04:05 |
| 11 | Ghotki | 01:10 +1d → 05:06·PR | 01:12 +1d |
| 12 | Sadiqabad | 02:48 +1d → 06:20·PR | 02:50 +1d → 06:28 |
| 13 | Rahim Yar Khan | 03:18 +1d → 06:50·PR | 03:20 +1d → 06:53 |
| 14 | Khanpur Jn. | 03:55 +1d → 07:44·PR | 04:00 +1d → 07:51 |
| 15 | Dera Nawab Sahib | 04:58 +1d → 09:03·PR | 05:00 +1d |
| 16 | Bahawalpur | 05:36 +1d → 09:50·PR | 05:40 +1d |
| 17 | Lodhran Jn | 06:00 +1d → 10:11·PR | 06:02 +1d → 10:17 |
| 18 | Dunyapur | 06:26 +1d → 10:47·PR | 06:28 +1d |
| 19 | Jahania | 06:50 +1d → 11:14·PR | 06:52 +1d |
| 20 | Khanewal Jn | 07:25 +1d → 11:50·PR | 07:50 +1d |
| ⋯ 15 stops | |||
| 21 | Mian Channu | 08:25 +1d | 08:27 +1d |
| 22 | Chichawatni | 09:00 +1d | 09:02 +1d |
| 23 | Sahiwal | 09:33 +1d | 09:38 +1d |
| 24 | Okara | 10:05 +1d | 10:07 +1d |
| 25 | Pattoki | 10:40 +1d | 10:42 +1d |
| 26 | Kot Radha Kishan | 11:04 +1d | 11:06 +1d |
| 27 | Raiwind Jn. | 11:25 +1d | 11:30 +1d |
| 28 | Kot Lakhpat | 12:00 +1d | 12:02 +1d |
| 29 | Lahore Jn. | 12:30 +1d | 13:05 +1d |
| 30 | Shahdara Bagh Jn | 13:22 +1d | 13:24 +1d |
| 31 | Narang | 14:24 +1d | 14:26 +1d |
| 32 | Baddomalhi | 14:55 +1d | 14:57 +1d |
| 33 | Narowal Jn | 15:30 +1d | 15:35 +1d |
| 34 | Qila Sobha Singh | 16:10 +1d | 16:12 +1d |
| 35 | Pasrur | 16:36 +1d | 16:38 +1d |
| 36 | Chawinda | 17:00 +1d | 17:02 +1d |
| 37 | Sialkot Jn | 17:50 +1d | — +1d |
What the marks mean
- → 21:28 — actual time on the 20 November 2026 run
- ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
- +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
- Blank — not recorded
A full recorded run: 22 August 2026 →
Station by station, last 5 days
153 arrivals recordedOne mark per day, newest first.
A run’s GPS trail is decoded after the journey completes — recent days may link later.
2Drigh Roadscheduled 15:50+1h495 days
Day Arrived Delay Recorded by Fri 20 Nov 17:40 +1h49 Pakistan Railways Thu 19 Nov 18:19 +2h30 Pakistan Railways Wed 18 Nov 16:19 +27m Pakistan Railways Tue 17 Nov 16:55 +1h03 Pakistan Railways Mon 16 Nov 19:04 +3h13 Pakistan Railways Seen on 5 of 5 days, ranging +27m to +3h13. Every train at Drigh Road →
3Landhi Jn.scheduled 16:10+1h525 days
Day Arrived Delay Recorded by Fri 20 Nov 18:04 +1h52 Pakistan Railways Thu 19 Nov 18:48 +2h36 Pakistan Railways Wed 18 Nov 16:38 +27m Pakistan Railways Tue 17 Nov 17:17 +1h05 Pakistan Railways Mon 16 Nov 19:23 +3h12 Pakistan Railways Seen on 5 of 5 days, ranging +27m to +3h12. Every train at Landhi Jn. →
4Kotri Jnscheduled 17:56+2h435 days
Day Arrived Delay Recorded by Fri 20 Nov 20:43 +2h43 Pakistan Railways Thu 19 Nov 21:16 +3h21 Pakistan Railways Wed 18 Nov arrived, time not recorded +1h45 Pakistan Railways Tue 17 Nov 19:41 +1h43 Pakistan Railways Mon 16 Nov 21:49 +3h58 Pakistan Railways Seen on 5 of 5 days, ranging +1h43 to +3h58. Every train at Kotri Jn →
5Hyderabad Jnscheduled 18:15+2h395 days
Day Arrived Delay Recorded by Fri 20 Nov 20:59 +2h39 Pakistan Railways Thu 19 Nov 21:42 +3h22 Pakistan Railways Wed 18 Nov 19:59 +1h40 Pakistan Railways Tue 17 Nov 20:03 +1h43 Pakistan Railways Mon 16 Nov 22:18 +4h03 Pakistan Railways Seen on 5 of 5 days, ranging +1h40 to +4h03. Every train at Hyderabad Jn →
6Tando Adamscheduled 19:19+2h505 days
Day Arrived Delay Recorded by Fri 20 Nov 22:11 +2h50 Pakistan Railways Thu 19 Nov 22:37 +3h17 Pakistan Railways Wed 18 Nov 21:04 +1h43 Pakistan Railways Tue 17 Nov 21:13 +1h52 Pakistan Railways Mon 16 Nov 23:19 +4h01 Pakistan Railways Seen on 5 of 5 days, ranging +1h43 to +4h01. Every train at Tando Adam →
7Nawabshah Jn.scheduled 20:05+3h155 days
Day Arrived Delay Recorded by Fri 20 Nov 23:19 +3h15 Pakistan Railways Thu 19 Nov 23:33 +3h24 Pakistan Railways Wed 18 Nov 22:08 +1h59 Pakistan Railways Tue 17 Nov 22:18 +2h14 Pakistan Railways Mon 16 Nov 00:33 +4h23 Pakistan Railways Seen on 5 of 5 days, ranging +1h59 to +4h23. Every train at Nawabshah Jn. →
8Mehrabpurscheduled 21:20+3h455 days
Day Arrived Delay Recorded by Fri 20 Nov 01:10 +3h49 Pakistan Railways Thu 19 Nov 01:06 +3h45 Pakistan Railways Wed 18 Nov 23:48 +2h26 Pakistan Railways Tue 17 Nov 00:07 +2h45 Pakistan Railways Mon 16 Nov 02:15 +4h53 Pakistan Railways Seen on 5 of 5 days, ranging +2h26 to +4h53. Every train at Mehrabpur →
9Gambatscheduled 21:50+3h435 days
Day Arrived Delay Recorded by Fri 20 Nov 02:19 +4h28 Pakistan Railways Thu 19 Nov 01:35 +3h43 Pakistan Railways Wed 18 Nov 00:17 +2h25 Pakistan Railways Tue 17 Nov 00:37 +2h45 Pakistan Railways Mon 16 Nov 02:45 +4h53 Pakistan Railways Seen on 5 of 5 days, ranging +2h25 to +4h53. Every train at Gambat →
10Rohri Jn.scheduled 23:40+25h325 days
Day Arrived Delay Recorded by Fri 20 Nov 03:20 +3h40 Pakistan Railways Thu 19 Nov 03:11 +27h04 Pakistan Railways Wed 18 Nov 01:12 +25h Pakistan Railways Tue 17 Nov 01:40 +25h32 Pakistan Railways Mon 16 Nov 03:49 +27h42 Pakistan Railways Seen on 5 of 5 days, ranging +3h40 to +27h42. Every train at Rohri Jn. →
11Ghotkischeduled 01:10+3h545 days
Day Arrived Delay Recorded by Fri 20 Nov 05:06 +3h54 Pakistan Railways Thu 19 Nov 05:37 +4h26 Pakistan Railways Wed 18 Nov 02:46 +1h35 Pakistan Railways Tue 17 Nov 03:06 +1h55 Pakistan Railways Mon 16 Nov 05:25 +4h13 Pakistan Railways Seen on 5 of 5 days, ranging +1h35 to +4h26. Every train at Ghotki →
12Sadiqabadscheduled 02:48+3h325 days
Day Arrived Delay Recorded by Fri 20 Nov 06:20 +3h32 Pakistan Railways Thu 19 Nov 06:49 +4h Pakistan Railways Wed 18 Nov 04:11 +1h21 Pakistan Railways Tue 17 Nov 04:19 +1h32 Pakistan Railways Mon 16 Nov 07:31 +4h41 Pakistan Railways Seen on 5 of 5 days, ranging +1h21 to +4h41. Every train at Sadiqabad →
13Rahim Yar Khanscheduled 03:18+3h305 days
Day Arrived Delay Recorded by Fri 20 Nov 06:50 +3h30 Pakistan Railways Thu 19 Nov 07:17 +3h57 Pakistan Railways Wed 18 Nov 04:36 +1h16 Pakistan Railways Tue 17 Nov 04:47 +1h28 Pakistan Railways Mon 16 Nov 07:54 +4h35 Pakistan Railways Seen on 5 of 5 days, ranging +1h16 to +4h35. Every train at Rahim Yar Khan →
14Khanpur Jn.scheduled 03:55+3h455 days
Day Arrived Delay Recorded by Fri 20 Nov 07:44 +3h45 Pakistan Railways Thu 19 Nov 08:01 +4h01 Pakistan Railways Wed 18 Nov 05:30 +1h31 Pakistan Railways Tue 17 Nov 05:39 +1h40 Pakistan Railways Mon 16 Nov 08:41 +4h41 Pakistan Railways Seen on 5 of 5 days, ranging +1h31 to +4h41. Every train at Khanpur Jn. →
15Dera Nawab Sahibscheduled 04:58+4h035 days
Day Arrived Delay Recorded by Fri 20 Nov 09:03 +4h03 Pakistan Railways Thu 19 Nov 09:11 +4h12 Pakistan Railways Wed 18 Nov 07:00 +2h Pakistan Railways Tue 17 Nov 07:05 +2h05 Pakistan Railways Mon 16 Nov 10:32 +5h32 Pakistan Railways Seen on 5 of 5 days, ranging +2h to +5h32. Every train at Dera Nawab Sahib →
16Bahawalpurscheduled 05:36+4h115 days
Day Arrived Delay Recorded by Fri 20 Nov 09:50 +4h11 Pakistan Railways Thu 19 Nov 10:18 +4h38 Pakistan Railways Wed 18 Nov 07:41 +2h01 Pakistan Railways Tue 17 Nov 07:58 +2h18 Pakistan Railways Mon 16 Nov 11:30 +5h51 Pakistan Railways Seen on 5 of 5 days, ranging +2h01 to +5h51. Every train at Bahawalpur →
17Lodhran Jnscheduled 06:00+4h105 days
Day Arrived Delay Recorded by Fri 20 Nov 10:11 +4h10 Pakistan Railways Thu 19 Nov 10:38 +4h37 Pakistan Railways Wed 18 Nov 08:01 +1h59 Pakistan Railways Tue 17 Nov 08:18 +2h19 Pakistan Railways Mon 16 Nov 11:50 +5h49 Pakistan Railways Seen on 5 of 5 days, ranging +1h59 to +5h49. Every train at Lodhran Jn →
18Dunyapurscheduled 06:26+4h195 days
Day Arrived Delay Recorded by Fri 20 Nov 10:47 +4h19 Pakistan Railways Thu 19 Nov 11:12 +4h44 Pakistan Railways Wed 18 Nov 08:31 +2h03 Pakistan Railways Tue 17 Nov 08:53 +2h24 Pakistan Railways Mon 16 Nov 12:20 +5h54 Pakistan Railways Seen on 5 of 5 days, ranging +2h03 to +5h54. Every train at Dunyapur →
19Jahaniascheduled 06:50+4h235 days
Day Arrived Delay Recorded by Fri 20 Nov 11:14 +4h23 Pakistan Railways Thu 19 Nov 11:40 +4h49 Pakistan Railways Wed 18 Nov 08:56 +2h04 Pakistan Railways Tue 17 Nov 09:17 +2h26 Pakistan Railways Mon 16 Nov 13:11 +6h20 Pakistan Railways Seen on 5 of 5 days, ranging +2h04 to +6h20. Every train at Jahania →
20Khanewal Jnscheduled 07:25+4h015 days
Day Arrived Delay Recorded by Fri 20 Nov 11:50 +4h01 Pakistan Railways Thu 19 Nov 12:43 +4h53 Pakistan Railways Wed 18 Nov arrived, time not recorded +1h45 Pakistan Railways Tue 17 Nov 09:55 +2h06 Pakistan Railways Mon 16 Nov 13:45 +5h55 Pakistan Railways Seen on 5 of 5 days, ranging +1h45 to +5h55. Every train at Khanewal Jn →
21Mian Channuscheduled 08:25+4h054 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 14:07 +5h40 Pakistan Railways Wed 18 Nov 10:40 +2h13 Pakistan Railways Tue 17 Nov 10:57 +2h30 Pakistan Railways Mon 16 Nov 14:44 +6h18 Pakistan Railways Seen on 4 of 5 days, ranging +2h13 to +6h18. Every train at Mian Channu →
22Chichawatnischeduled 09:00+4h4 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 14:35 +5h34 Pakistan Railways Wed 18 Nov 11:04 +2h03 Pakistan Railways Tue 17 Nov 11:27 +2h25 Pakistan Railways Mon 16 Nov 15:11 +6h10 Pakistan Railways Seen on 4 of 5 days, ranging +2h03 to +6h10. Every train at Chichawatni →
23Sahiwalscheduled 09:33+3h594 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 15:11 +5h33 Pakistan Railways Wed 18 Nov 11:39 +2h01 Pakistan Railways Tue 17 Nov 12:02 +2h25 Pakistan Railways Mon 16 Nov 15:47 +6h09 Pakistan Railways Seen on 4 of 5 days, ranging +2h01 to +6h09. Every train at Sahiwal →
24Okarascheduled 10:05+4h064 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 15:45 +5h38 Pakistan Railways Wed 18 Nov arrived, time not recorded +2h09 Pakistan Railways Tue 17 Nov 12:40 +2h34 Pakistan Railways Mon 16 Nov 16:24 +6h17 Pakistan Railways Seen on 4 of 5 days, ranging +2h09 to +6h17. Every train at Okara →
25Pattokischeduled 10:40+4h094 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 16:20 +5h40 Pakistan Railways Wed 18 Nov 12:54 +2h12 Pakistan Railways Tue 17 Nov 13:20 +2h38 Pakistan Railways Mon 16 Nov 16:58 +6h17 Pakistan Railways Seen on 4 of 5 days, ranging +2h12 to +6h17. Every train at Pattoki →
26Kot Radha Kishanscheduled 11:04+4h134 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 16:53 +5h47 Pakistan Railways Wed 18 Nov 13:18 +2h13 Pakistan Railways Tue 17 Nov 13:44 +2h38 Pakistan Railways Mon 16 Nov 17:25 +6h20 Pakistan Railways Seen on 4 of 5 days, ranging +2h13 to +6h20. Every train at Kot Radha Kishan →
27Raiwind Jn.scheduled 11:25+4h074 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 17:11 +5h42 Pakistan Railways Wed 18 Nov 13:38 +2h08 Pakistan Railways Tue 17 Nov 14:01 +2h32 Pakistan Railways Mon 16 Nov 17:44 +6h14 Pakistan Railways Seen on 4 of 5 days, ranging +2h08 to +6h14. Every train at Raiwind Jn. →
28Kot Lakhpatscheduled 12:00+4h094 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 17:49 +5h47 Pakistan Railways Wed 18 Nov 14:08 +2h06 Pakistan Railways Tue 17 Nov 14:31 +2h30 Pakistan Railways Mon 16 Nov 18:12 +6h10 Pakistan Railways Seen on 4 of 5 days, ranging +2h06 to +6h10. Every train at Kot Lakhpat →
29Lahore Jn.scheduled 12:30+4h014 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 18:15 +5h46 Pakistan Railways Wed 18 Nov 14:43 +1h39 Pakistan Railways Tue 17 Nov 14:55 +2h25 Pakistan Railways (journey record) Mon 16 Nov 18:42 +5h37 Pakistan Railways Seen on 4 of 5 days, ranging +1h39 to +5h46. Every train at Lahore Jn. →
30Shahdara Bagh Jnscheduled 13:22+5h543 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 19:17 +5h54 Pakistan Railways Wed 18 Nov 15:25 +2h01 Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 19:37 +6h13 Pakistan Railways Seen on 3 of 5 days, ranging +2h01 to +6h13. Every train at Shahdara Bagh Jn →
31Narangscheduled 14:24+6h123 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 20:37 +6h12 Pakistan Railways Wed 18 Nov 16:24 +1h59 Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 20:50 +6h24 Pakistan Railways Seen on 3 of 5 days, ranging +1h59 to +6h24. Every train at Narang →
32Baddomalhischeduled 14:55+6h103 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 21:06 +6h10 Pakistan Railways Wed 18 Nov 16:50 +1h53 Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 21:19 +6h25 Pakistan Railways Seen on 3 of 5 days, ranging +1h53 to +6h25. Every train at Baddomalhi →
33Narowal Jnscheduled 15:30+6h153 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 21:49 +6h15 Pakistan Railways Wed 18 Nov 17:33 +1h58 Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 22:04 +6h29 Pakistan Railways Seen on 3 of 5 days, ranging +1h58 to +6h29. Every train at Narowal Jn →
34Qila Sobha Singhscheduled 16:10+6h283 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 22:39 +6h28 Pakistan Railways Wed 18 Nov 18:13 +2h01 Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 22:44 +6h32 Pakistan Railways Seen on 3 of 5 days, ranging +2h01 to +6h32. Every train at Qila Sobha Singh →
35Pasrurscheduled 16:36+6h223 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 22:59 +6h22 Pakistan Railways Wed 18 Nov 18:31 +1h53 Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 23:05 +6h27 Pakistan Railways Seen on 3 of 5 days, ranging +1h53 to +6h27. Every train at Pasrur →
36Chawindascheduled 17:00+6h203 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 23:20 +6h20 Pakistan Railways Wed 18 Nov 18:54 +1h53 Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 23:19 +6h20 Pakistan Railways Seen on 3 of 5 days, ranging +1h53 to +6h20. Every train at Chawinda →
37Sialkot Jnscheduled 17:50+1h491 day
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov not recorded — Wed 18 Nov 19:39 +1h49 Train GPS Tue 17 Nov not recorded — Mon 16 Nov not recorded — Seen on 1 of 5 days. Every train at Sialkot Jn →
What the marks mean
- Tap a station — each day’s arrival, delay and recorder
- Green — within 15 minutes of the scheduled time
- Amber — 16 to 45 minutes late
- Red — over 45 minutes late
- Hollow — not recorded that day
- Grey — arrived, no delay figure
- Dash (—) — no delay figure for this stop yet
- Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
- The starting station is not listed — a train does not arrive where it begins.
Common questions
Is Allama Iqbal Express 9UP usually late?
Typically 234 minutes late arriving at Sialkot Jn, measured across 50 recorded arrivals (31 Jul – 18 Nov 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.
How late is Allama Iqbal Express 9UP on a bad day?
On the worst one run in ten, 360 minutes late into Sialkot Jn, against a typical 234 minutes late. Both come from the same 50 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.
What time does Allama Iqbal Express 9UP leave Karachi Cantt?
15:30, on the current published timetable. It is booked into Sialkot Jn at 17:50, the day after it leaves. Those are booked times. The delay figures on this page are what we recorded against them.
How long does Allama Iqbal Express 9UP take from Karachi Cantt to Sialkot Jn?
26h 20m on the timetable. In practice a typical run has taken 30h 14m, measured from recorded arrivals at Sialkot Jn.
How many stops does Allama Iqbal Express 9UP make?
37 on the current published timetable, from Karachi Cantt to Sialkot Jn. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.
Service history (first year, operating eras) is drawn from Wikipedia's List of Pakistan Railways trains, retrieved 15 August 2026, matched on train number. Further reading: the train's own Wikipedia article.