6 scheduled services · fastest about 1h 41m · 116 km
Gujrat se Lahore ki train — timing aur delay record.
6Scheduled services
1h 41mFastest booked
2h 08mSlowest booked
116 kmMeasured along track
0Overnight services
6 of 6With a delay record
GUJRATLAHOREGUJRAT
گُجرات ۔ لاہور جنکشن ۔ گُجرات
Most reliable choice

Subak Raftar 102DN — within 15 minutes of the scheduled time 41% of the time, typically 23 minutes late, over 10 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Gujrat to Lahore Jn. it typically adds 28 min, from 23 recorded runs. At Lahore Jn. it has typically arrived 51 minutes late, from 29 recorded runs.

Every train, compared

6 of 6 with 7+ days

Over this leg is the CHANGE in a train's delay between Gujrat and Lahore Jn. on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Gujrat — no booked arrival at Gujrat to measure from at all. Figures cover runs recorded between 30 July 2026 and 1 October 2026. why a delay figure changes along the route.

TrainDepartsArrivesDurationDistanceTypical delayOn-timeOver this leg
2Khyber Mail 2DN05:04 +1d07:00 +1d1h 56m116 km+2h 09m6%adds 10 min · 14
102Subak Raftar 102DN10:0911:501h 41m116 km+23 min41%adds 28 min · 23
8Tezgam 8DN11:2413:151h 51m116 km+52 min18%adds 7 min · 38
40Jaffar Express 40DN14:1216:101h 58m116 km+50 min25%makes up 5 min · 26
14Awam Express 14DN16:1218:202h 08m116 km+2h 03m8%adds 19 min · 34
104Subak Kharam 104DN19:3821:351h 57m116 km+41 min28%adds 4 min · 23
What the marks mean
  • Departs · Arrives — scheduled local times, published Pakistan Railways timetable
  • +1d — a stop on a later day of the train's own run, not a date
  • Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
  • — — fewer than 7 days of recorded runs for that train
  • Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
  • A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
  • — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.

Every service in detail

Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.

Travelling the other way? Lahore Jn. to Gujrat trains →

Common questions

How many trains run from Gujrat to Lahore Jn.?

6 scheduled services on the current published timetable. That is what is booked to run, not what ran today.

Which is the fastest train from Gujrat to Lahore Jn.?

Subak Raftar 102DN, booked at 1h 41m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.

Which train from Gujrat to Lahore Jn. is most likely to be on time?

Subak Raftar 102DN has the best recorded punctuality of the services we hold enough history for: 41% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 23 min. That is its record across every stop of its full journey, not this leg alone: over just Gujrat to Lahore Jn. it typically adds 28 min, from 23 recorded runs. Measured from recorded runs, not from the timetable. 6 of 6 services on this route currently have enough recorded history to rank at all.

Is there an overnight train from Gujrat to Lahore Jn.?

Not on the current timetable. Every service on this route is booked to arrive on the same day it departs.

Do trains lose time between Gujrat and Lahore Jn.?

Typically yes. Subak Raftar 102DN adds about 28 min to its delay over this leg, measured across 23 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.

How far is it from Gujrat to Lahore Jn. by train?

It is about 116 km along the track. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails.

Are these Gujrat to Lahore Jn. timings the real arrival times?

No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.

Stations on this line

4 stops
GujratWazirabad JnGujranwalaLahore Jn.
direct services only
Gujrat → Karachi Cantt 5 trainsGujrat → Rawalpindi 5 trainsGujrat → Peshawar Cantt 3 trainsLahore Jn. → Karachi Cantt 10 trainsLahore Jn. → Rawalpindi 5 trainsLahore Jn. → Peshawar Cantt 3 trains

Gujrat timetable · Lahore Jn. timetable