Landhi Jn. to Tando Adam
Sukkur Express 145UP — within 15 minutes of the scheduled time 15% of the time, typically 87 minutes late, over 27 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Landhi Jn. to Tando Adam it typically adds 49 min, from 56 recorded runs. At Tando Adam it has typically arrived 62 minutes late, from 82 recorded runs.
Every train, compared
8 of 8 with 7+ daysOver this leg is the CHANGE in a train's delay between Landhi Jn. and Tando Adam on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Landhi Jn. — no booked arrival at Landhi Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 17 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 145Sukkur Express 145UP | 00:03 +1d | 03:35 +1d | 3h 32m | +1h 27m | 15% | adds 49 min · 56 |
| 13Awam Express 13UP | 08:02 | 11:20 | 3h 18m | +1h 41m | 10% | adds 57 min · 52 |
| 11Hazara Express 11UP | 09:02 | 12:22 | 3h 20m | +1h 30m | 12% | adds 38 min · 51 |
| 47Rehman Baba Express 47UP | 12:42 | 15:54 | 3h 12m | +1h 44m | 8% | adds 39 min · 59 |
| 45Pakistan Express 45UP | 14:37 | 17:49 | 3h 12m | +4h 43m | 1% | adds 50 min · 61 |
| 9Allama Iqbal Express 9UP | 16:12 | 19:19 | 3h 07m | +2h 41m | 3% | adds 1h 06m · 55 |
| 25Bahauddin Zikria Express 25UP | 19:18 | 22:47 | 3h 29m | +1h 49m | 6% | adds 1h · 31 |
| 37Fareed Express 37UP | 20:37 | 00:01 +1d | 3h 24m | +1h 45m | 7% | adds 42 min · 43 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Sukkur Express 145UP145سکھر ایکسپریس145اپ00:03 +1d→03:35 +1d3h 32m15% on time · +1h 27madds 49 min over this leg · 56 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ08:02→11:203h 18m10% on time · +1h 41madds 57 min over this leg · 52 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ09:02→12:223h 20m12% on time · +1h 30madds 38 min over this leg · 51 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ12:42→15:543h 12m8% on time · +1h 44madds 39 min over this leg · 59 runs
- Pakistan Express 45UP45پاکستان ایکسپریس 45 اپ14:37→17:493h 12m1% on time · +4h 43madds 50 min over this leg · 61 runs
- Allama Iqbal Express 9UP9علامہ اقبال ایکسپریس 9 اپ16:12→19:193h 07m3% on time · +2h 41madds 1h 06m over this leg · 55 runs
- Bahauddin Zikria Express 25UP25بہائو الدین زکریا ایکسپری25 اپ19:18→22:473h 29m6% on time · +1h 49madds 1h over this leg · 31 runs
- Fareed Express 37UP37فرید ایکسپریس 37 اپ20:37→00:01 +1d3h 24m7% on time · +1h 45madds 42 min over this leg · 43 runs
Travelling the other way? Tando Adam to Landhi Jn. trains →
Common questions
How many trains run from Landhi Jn. to Tando Adam?
8 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Landhi Jn. to Tando Adam?
Allama Iqbal Express 9UP, booked at 3h 07m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Landhi Jn. to Tando Adam is most likely to be on time?
Sukkur Express 145UP has the best recorded punctuality of the services we hold enough history for: 15% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 1h 27m. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 8 of 8 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Landhi Jn. to Tando Adam?
Yes. 1 of the 8 scheduled services is booked to arrive on a later day than it departs: Fareed Express 37UP.
Do trains lose time between Landhi Jn. and Tando Adam?
Typically yes. Allama Iqbal Express 9UP adds about 1h 06m to its delay over this leg, measured across 55 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Landhi Jn. to Tando Adam timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.