Rahim Yar Khan to Ghotki
Shalimar Express 28DN — within 15 minutes of the scheduled time 39% of the time, typically 27 minutes late, over 25 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rahim Yar Khan to Ghotki it typically adds 22 min, from 49 recorded runs. At Ghotki it has typically arrived 46 minutes late, from 77 recorded runs.
Every train, compared
11 of 11 with 7+ daysOver this leg is the CHANGE in a train's delay between Rahim Yar Khan and Ghotki on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rahim Yar Khan — no booked arrival at Rahim Yar Khan to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 40Jaffar Express 40DN | 00:44 +1d | 02:13 +1d | 1h 29m | +52 min | 20% | adds 21 min · 46 |
| 48Rehman Baba Express 48DN | 04:51 +1d | 06:24 +1d | 1h 33m | +2h 21m | 10% | adds 20 min · 47 |
| 14Awam Express 14DN | 05:34 +1d | 07:30 +1d | 1h 56m | +1h 22m | 15% | adds 7 min · 60 |
| 12Hazara Express 12DN | 11:35 +1d | 13:36 +1d | 2h 01m | +1h 32m | 15% | makes up 1 min · 59 |
| 28Shalimar Express 28DN | 16:32 | 17:50 | 1h 18m | +27 min | 39% | adds 22 min · 49 |
| 2Khyber Mail 2DN | 18:14 +1d | 20:10 +1d | 1h 56m | +1h 58m | 8% | adds 18 min · 30 |
| 38Fareed Express 38DN | 19:29 | 21:22 | 1h 53m | +1h 05m | 16% | no change · 52 |
| 26Bahauddin Zikria Express 26DN | 20:39 | 22:21 | 1h 42m | +1h 33m | 10% | adds 13 min · 44 |
| 46Pakistan Express 46DN | 21:14 | 22:54 | 1h 40m | +2h 26m | 4% | adds 16 min · 60 |
| 10Allama Iqbal Express 10DN | 21:34 | 23:15 | 1h 41m | +44 min | 28% | adds 12 min · 58 |
| 8Tezgam 8DN | 22:49 | 00:23 +1d | 1h 34m | +1h 08m | 17% | adds 21 min · 58 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Jaffar Express 40DN40جعفر ایکسپریس 40 ڈائون00:44 +1d→02:13 +1d1h 29m20% on time · +52 minadds 21 min over this leg · 46 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن04:51 +1d→06:24 +1d1h 33m10% on time · +2h 21madds 20 min over this leg · 47 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون05:34 +1d→07:30 +1d1h 56m15% on time · +1h 22madds 7 min over this leg · 60 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن11:35 +1d→13:36 +1d2h 01m15% on time · +1h 32mmakes up 1 min over this leg · 59 runs
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون16:32→17:501h 18m39% on time · +27 minadds 22 min over this leg · 49 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون18:14 +1d→20:10 +1d1h 56m8% on time · +1h 58madds 18 min over this leg · 30 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون19:29→21:221h 53m16% on time · +1h 05mno change over this leg · 52 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون20:39→22:211h 42m10% on time · +1h 33madds 13 min over this leg · 44 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون21:14→22:541h 40m4% on time · +2h 26madds 16 min over this leg · 60 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون21:34→23:151h 41m28% on time · +44 minadds 12 min over this leg · 58 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن22:49→00:23 +1d1h 34m17% on time · +1h 08madds 21 min over this leg · 58 runs
Travelling the other way? Ghotki to Rahim Yar Khan trains →
Common questions
How many trains run from Rahim Yar Khan to Ghotki?
11 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rahim Yar Khan to Ghotki?
Shalimar Express 28DN, booked at 1h 18m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rahim Yar Khan to Ghotki is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 39% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 27 min. That is its record across every stop of its full journey, not this leg alone: over just Rahim Yar Khan to Ghotki it typically adds 22 min, from 49 recorded runs. Measured from recorded runs, not from the timetable. 11 of 11 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rahim Yar Khan to Ghotki?
Yes. 1 of the 11 scheduled services is booked to arrive on a later day than it departs: Tezgam 8DN.
Do trains lose time between Rahim Yar Khan and Ghotki?
Typically yes. Shalimar Express 28DN adds about 22 min to its delay over this leg, measured across 49 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Rahim Yar Khan to Ghotki timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.