12 Hazara Express 12DN ہزارا ایکسپریس 12ڈاؤن
Running 44 min late — heading for Gujar Khan, due 18:45 (operator's estimate), 30 km/h. Last crossed Chaklala.
Another Hazara Express 12DN is also on the line right now — a second departure is in flight.
How late is it, usually?
median per recorded stop arrivalEvery figure here is a median, not an average: why we publish a median, not an average. What counts as on time, and why some figures here are blank, is set out in what on time means here, and every threshold behind it.
11 days of recorded arrivals.
Over 18 recorded arrivals (30 Jul – 5 Oct 2026), Hazara Express 12DN has typically reached Karachi City around 02:35 two days after it leaves — on the worst one run in ten, past 04:31 two days after it leaves, at Karachi City itself. Today's run: track it live →
The “At Karachi City” tile above is the arrival at the end of the run; “Typical delay, any stop” averages every stop including the earlier ones, so it usually reads smaller. Where the time goes, below, shows every stop we have recorded.
How long does it take?
scheduled vs recordedScheduled 34h 45m — Havelian to Karachi City. Typically 36h 35m, 1h 50m longer.
Timetable: out 14:00, in at 00:45 two days later — two nights on board.
What these figures cover
- Scheduled — the current timetable, Havelian 14:00 to Karachi City 00:45 two days later
- Typical journey — from the scheduled departure to the recorded arrival at Karachi City; the median of 18 runs
- Bad day — 38h 31m at the 90th percentile: nine runs in ten come in under it
- Keyline — the scheduled time. The solid bar is the typical journey, the faint bar behind it the bad day.
- Recorded arrivals: 30 July to 5 October 2026.
- End to end. For a shorter leg, the stop times are in the timetable below.
Which day is worst?
mean minutes late per recorded arrival, 8-week windowThis is a mean over an 8-week window, not the median (typical) figure above — the two are not directly comparable.
Where the time goes
most of it lost after BaldherLeaves Baldher on time · reaches Karachi City +1h 50m — +1h 50m lost along the way.
- Havelian14:00حویلیاں—
- Baldher14:18بالھدرon time
- Haripur Hazara14:53ہری پور ہزارہ5 min early
- Kot Najib Ullah15:15کوٹ نجیب اللہ4 min early
- Taxila Cantt15:56ٹیکسلا کینٹ6 min early
- Golra Sharif16:17گولڑہ شریف+13 min
- Rawalpindi17:10راولپِنڈى+18 min
- Chaklala17:21چکلالہ+22 min
- Gujar Khan18:03گُوجر خان+37 min
- Jhelum19:37جہلم+29 min
- Lala Musa Jn.20:55لالہ مُوسٰی جنکشن+20 min
- Dinga21:21ڈنگہ+20 min
- Mandi Bahauddin21:50منڈی بہاوّالدین+20 min
- Malakwal Jn22:25ملکوال جنکشن+16 min
- Phularwan23:00پھلروان+28 min
- Bhalwal23:27بھلوال+26 min
- Sargodha Jn00:25سرگودھا جنکشن+18 min
- Shaheenabad Jn00:50شاہین آباد جنکشن+28 min
- Sillanwali01:07سلانوالی+36 min
- Jhang Sadar02:30جھنگ صدر+58 min
- Shorkot Cantt Jn04:30شورکوٹ کینٹ جنکشن+1h 02m
- Abdul Hakim05:07عبد الحكيم+58 min
- Khanewal Jn06:00خانیوال+47 min
- Multan Cantt07:05ملتان کینٹ+1h 04m
- Shujabad07:37شجاع آباد+1h 09m
- Gilawala07:58گیلا والا+1h 07m
- Lodhran Jn08:20لودهراں جنکشن+1h 13m
- Bahawalpur08:45بہاولپور+1h 04m
- Samasata Jn09:00سمہ سٹہ جنکشن+1h 10m
- Mubarakpur09:18مبارک پور+1h 23m
- Dera Nawab Sahib09:35ڈیرہ نواب صاحب+1h 17m
- Liaquatpur10:07لیاقت پور+1h 20m
- Khanpur Jn.10:55خانپور جنکشن+1h 19m
- Rahim Yar Khan11:35رحیم یار خان+1h 25m
- Sadiqabad11:57صادق آباد+1h 36m
- Daharki12:41ڈہرکی+1h 37m
- Mirpur Mathelo13:04میر پور ماتھیلو+1h 35m
- Ghotki13:38گھوٹکی+1h 26m
- Pano Akil14:11پنو عاقل+1h 19m
- Rohri Jn.15:20روہڑی جنکشن+1h 10m
- Khairpur15:49خیرپور+1h 23m
- Gambat16:14گامبٹ+1h 22m
- Mehrabpur16:37محراب پور+1h 26m
- Bhiria Road17:00بھریا روڈ+1h 28m
- Padidan17:22پڈعیدن+1h 23m
- Nawabshah Jn.18:47نوابشاہ جنکشن+1h 10m
- Shahdadpur19:40شهدادپور+1h 01m
- Tando Adam20:13ٹنڈو آدَم+57 min
- Hyderabad Jn21:15حیدرآباد جنکشن+1h 08m
- Kotri Jn21:35کوٹری جنکشن+1h 26m
- Landhi Jn.23:24لانڈھی جنکشن+1h 38m
- Drigh Road00:02ڈرگ روڈ+1h 22m
- Karachi Cantt00:35کراچی کينٹ+1h 14m
- Karachi City00:45سٹی اسٹیشن کراچی+1h 50m
Where it stands longest past the timetableshortest to longest recorded
- Karachi Canttscheduled 5 min1 min–2h 07m
- Rohri Jn.scheduled 25 min25–54 min
- Malakwal Jnscheduled 5 min8 min–1h 49m
- Taxila Canttscheduled 2 min4–23 min
- Haripur Hazarascheduled 2 min4–14 min
What the marks mean
- Solid bar — the typical delay at that stop (median of recorded arrivals)
- Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
- No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
- — (no solid bar either) — fewer than 3 recorded runs at that stop
- A negative figure means the train typically ran early at that stop, not late
- Band — the shortest and the longest stand recorded at that stop. The train has left as early as the first figure.
- Keyline — the scheduled stop, arrival to departure on the timetable below.
- Why a train stands is not recorded — a crossing, a loco change and a red signal all look the same on the clock.
- The five stops that stand longest past the timetable, not every stop — most routes have more. A stop qualifies with 7 or more runs timed in and out, and is skipped where the timetable books no stop, books one over an hour, or where any recorded stand ran past three hours.
- Most time is lost between Karachi Cantt and Karachi City (+36 min)
- Every stop on the current timetable is listed, in order, measured or not.
Timetable
scheduled → actual, 9 October 2026 runThe second time in a cell is what actually happened on the 9 October 2026 run.
| # | Station | Arrival | Departure |
|---|---|---|---|
| 1 | Havelian | — | 14:00 |
| 2 | Baldher | 14:17 | 14:18 |
| 3 | Haripur Hazara | 14:51 | 14:53 |
| ⋯ 3 stops | |||
| 4 | Kot Najib Ullah | 15:13 | 15:15 |
| 5 | Taxila Cantt | 15:54 | 15:56 |
| 6 | Golra Sharif | 16:15 | 16:17 |
| 7 | Rawalpindi | 16:40 | 17:10 |
| 8 | Chaklala | 17:19 → 17:41·PR | 17:21 → 17:44 |
| ⋯ 44 stops | |||
| 9 | Gujar Khan | 18:01 | 18:03 |
| 10 | Jhelum | 19:35 | 19:37 |
| 11 | Lala Musa Jn. | 20:30 | 20:55 |
| 12 | Dinga | 21:19 | 21:21 |
| 13 | Mandi Bahauddin | 21:45 | 21:50 |
| 14 | Malakwal Jn | 22:20 | 22:25 |
| 15 | Phularwan | 22:58 | 23:00 |
| 16 | Bhalwal | 23:25 | 23:27 |
| 17 | Sargodha Jn | 00:15 +1d | 00:25 +1d |
| 18 | Shaheenabad Jn | 00:49 +1d | 00:50 +1d |
| 19 | Sillanwali | 01:05 +1d | 01:07 +1d |
| 20 | Jhang Sadar | 02:25 +1d | 02:30 +1d |
| 21 | Shorkot Cantt Jn | 04:25 +1d | 04:30 +1d |
| 22 | Abdul Hakim | 05:05 +1d | 05:07 +1d |
| 23 | Khanewal Jn | 05:55 +1d | 06:00 +1d |
| 24 | Multan Cantt | 06:35 +1d | 07:05 +1d |
| 25 | Shujabad | 07:35 +1d | 07:37 +1d |
| 26 | Gilawala | 07:56 +1d | 07:58 +1d |
| 27 | Lodhran Jn | 08:18 +1d | 08:20 +1d |
| 28 | Bahawalpur | 08:40 +1d | 08:45 +1d |
| 29 | Samasata Jn | 08:58 +1d | 09:00 +1d |
| 30 | Mubarakpur | 09:16 +1d | 09:18 +1d |
| 31 | Dera Nawab Sahib | 09:33 +1d | 09:35 +1d |
| 32 | Liaquatpur | 10:05 +1d | 10:07 +1d |
| 33 | Khanpur Jn. | 10:50 +1d | 10:55 +1d |
| 34 | Rahim Yar Khan | 11:30 +1d | 11:35 +1d |
| 35 | Sadiqabad | 11:55 +1d | 11:57 +1d |
| 36 | Daharki | 12:39 +1d | 12:41 +1d |
| 37 | Mirpur Mathelo | 13:02 +1d | 13:04 +1d |
| 38 | Ghotki | 13:36 +1d | 13:38 +1d |
| 39 | Pano Akil | 14:09 +1d | 14:11 +1d |
| 40 | Rohri Jn. | 14:55 +1d | 15:20 +1d |
| 41 | Khairpur | 15:47 +1d | 15:49 +1d |
| 42 | Gambat | 16:12 +1d | 16:14 +1d |
| 43 | Mehrabpur | 16:35 +1d | 16:37 +1d |
| 44 | Bhiria Road | 16:58 +1d | 17:00 +1d |
| 45 | Padidan | 17:20 +1d | 17:22 +1d |
| 46 | Nawabshah Jn. | 18:45 +1d | 18:47 +1d |
| 47 | Shahdadpur | 19:38 +1d | 19:40 +1d |
| 48 | Tando Adam | 20:11 +1d | 20:13 +1d |
| 49 | Hyderabad Jn | 21:05 +1d | 21:15 +1d |
| 50 | Kotri Jn | 21:33 +1d | 21:35 +1d |
| 51 | Landhi Jn. | 23:22 +1d | 23:24 +1d |
| 52 | Drigh Road | 00:00 +2d | 00:02 +2d |
| 53 | Karachi Cantt | 00:30 +2d | 00:35 +2d |
| 54 | Karachi City | 00:45 +2d | — |
What the marks mean
- → 21:28 — actual time on the 9 October 2026 run
- ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
- +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
- Blank — not recorded
A full recorded run: 22 August 2026 →
Station by station, last 5 days
125 arrivals recordedOne mark per day, newest first.
A run’s GPS trail is decoded after the journey completes — recent days may link later.
2Baldherscheduled 14:17+1m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 14:19 +1m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Mon 5 Oct not recorded — Seen on 1 of 5 days. Every train at Baldher →
3Haripur Hazarascheduled 14:515m early1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 14:48 5m early Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Mon 5 Oct not recorded — Seen on 1 of 5 days. Every train at Haripur Hazara →
4Kot Najib Ullahscheduled 15:136m early1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 15:08 6m early Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Mon 5 Oct not recorded — Seen on 1 of 5 days. Every train at Kot Najib Ullah →
5Taxila Canttscheduled 15:547m early1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 15:48 7m early Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Mon 5 Oct not recorded — Seen on 1 of 5 days. Every train at Taxila Cantt →
6Golra Sharifscheduled 16:15+12m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 16:28 +12m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Mon 5 Oct not recorded — Seen on 1 of 5 days. Every train at Golra Sharif →
7Rawalpindischeduled 16:40+23m3 days
Day Arrived Delay Recorded by Fri 9 Oct arrived, time not recorded +23m Pakistan Railways Thu 8 Oct 16:52 17m early Pakistan Railways Wed 7 Oct arrived, time not recorded +57m Pakistan Railways Tue 6 Oct not recorded — Mon 5 Oct not recorded — Seen on 3 of 5 days, ranging 17m early to +57m. Every train at Rawalpindi →
8Chaklalascheduled 17:19+52m2 days
Day Arrived Delay Recorded by Fri 9 Oct 17:41 +21m Pakistan Railways Thu 8 Oct not recorded — Wed 7 Oct 18:43 +1h23 Pakistan Railways Tue 6 Oct not recorded — Mon 5 Oct not recorded — Seen on 2 of 5 days, ranging +21m to +1h23. Every train at Chaklala →
10Jhelumscheduled 19:35+1h401 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct arrived, time not recorded +1h40 Pakistan Railways Tue 6 Oct not recorded — Mon 5 Oct not recorded — Seen on 1 of 5 days. Every train at Jhelum →
11Lala Musa Jn.scheduled 20:30+1h411 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct 22:10 +1h41 Pakistan Railways Tue 6 Oct not recorded — Mon 5 Oct not recorded — Seen on 1 of 5 days. Every train at Lala Musa Jn. →
12Dingascheduled 21:19+1h331 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct 22:53 +1h33 Pakistan Railways Tue 6 Oct not recorded — Mon 5 Oct not recorded — Seen on 1 of 5 days. Every train at Dinga →
24Multan Canttscheduled 06:35+1h254 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct arrived, time not recorded +1h27 Pakistan Railways Wed 7 Oct arrived, time not recorded +1h23 Pakistan Railways Tue 6 Oct arrived, time not recorded +1h28 Pakistan Railways Mon 5 Oct arrived, time not recorded +1h22 Pakistan Railways Seen on 4 of 5 days, ranging +1h22 to +1h28. Every train at Multan Cantt →
25Shujabadscheduled 07:35+1h524 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 09:12 +1h36 Pakistan Railways Wed 7 Oct 09:23 +1h47 Pakistan Railways Tue 6 Oct 09:49 +2h13 Pakistan Railways Mon 5 Oct 09:33 +1h57 Pakistan Railways Seen on 4 of 5 days, ranging +1h36 to +2h13. Every train at Shujabad →
26Gilawalascheduled 07:56+1h514 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 09:33 +1h35 Pakistan Railways Wed 7 Oct 09:44 +1h46 Pakistan Railways Tue 6 Oct 10:09 +2h12 Pakistan Railways Mon 5 Oct 09:53 +1h55 Pakistan Railways Seen on 4 of 5 days, ranging +1h35 to +2h12. Every train at Gilawala →
27Lodhran Jnscheduled 08:18+1h564 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 10:00 +1h41 Pakistan Railways Wed 7 Oct 10:12 +1h53 Pakistan Railways Tue 6 Oct 10:34 +2h14 Pakistan Railways Mon 5 Oct 10:15 +1h58 Pakistan Railways Seen on 4 of 5 days, ranging +1h41 to +2h14. Every train at Lodhran Jn →
28Bahawalpurscheduled 08:40+1h464 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 10:14 +1h30 Pakistan Railways Wed 7 Oct 10:26 +1h42 Pakistan Railways Tue 6 Oct 10:50 +2h05 Pakistan Railways Mon 5 Oct 10:34 +1h49 Pakistan Railways Seen on 4 of 5 days, ranging +1h30 to +2h05. Every train at Bahawalpur →
29Samasata Jnscheduled 08:58+1h524 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 10:31 +1h32 Pakistan Railways Wed 7 Oct 10:47 +1h47 Pakistan Railways Tue 6 Oct 11:11 +2h12 Pakistan Railways Mon 5 Oct 10:56 +1h57 Pakistan Railways Seen on 4 of 5 days, ranging +1h32 to +2h12. Every train at Samasata Jn →
30Mubarakpurscheduled 09:16+1h584 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 10:55 +1h38 Pakistan Railways Wed 7 Oct 11:11 +1h53 Pakistan Railways Tue 6 Oct 11:40 +2h22 Pakistan Railways Mon 5 Oct 11:20 +2h02 Pakistan Railways Seen on 4 of 5 days, ranging +1h38 to +2h22. Every train at Mubarakpur →
31Dera Nawab Sahibscheduled 09:33+1h524 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 11:07 +1h32 Pakistan Railways Wed 7 Oct 11:19 +1h47 Pakistan Railways Tue 6 Oct 11:51 +2h17 Pakistan Railways Mon 5 Oct 11:31 +1h57 Pakistan Railways Seen on 4 of 5 days, ranging +1h32 to +2h17. Every train at Dera Nawab Sahib →
32Liaquatpurscheduled 10:05+1h534 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 11:40 +1h33 Pakistan Railways Wed 7 Oct 11:56 +1h49 Pakistan Railways Tue 6 Oct 12:25 +2h19 Pakistan Railways Mon 5 Oct 12:04 +1h57 Pakistan Railways Seen on 4 of 5 days, ranging +1h33 to +2h19. Every train at Liaquatpur →
33Khanpur Jn.scheduled 10:50+1h424 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 12:19 +1h30 Pakistan Railways Wed 7 Oct 12:32 +1h37 Pakistan Railways Tue 6 Oct 13:10 +2h16 Pakistan Railways Mon 5 Oct 12:41 +1h46 Pakistan Railways Seen on 4 of 5 days, ranging +1h30 to +2h16. Every train at Khanpur Jn. →
34Rahim Yar Khanscheduled 11:30+1h544 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 13:10 +1h35 Pakistan Railways Wed 7 Oct 13:26 +1h51 Pakistan Railways Tue 6 Oct 14:02 +2h27 Pakistan Railways Mon 5 Oct 13:32 +1h57 Pakistan Railways Seen on 4 of 5 days, ranging +1h35 to +2h27. Every train at Rahim Yar Khan →
35Sadiqabadscheduled 11:55+2h024 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 13:37 +1h40 Pakistan Railways Wed 7 Oct 13:57 +2h Pakistan Railways Tue 6 Oct 14:27 +2h30 Pakistan Railways Mon 5 Oct 14:00 +2h04 Pakistan Railways Seen on 4 of 5 days, ranging +1h40 to +2h30. Every train at Sadiqabad →
36Daharkischeduled 12:39+2h074 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 14:26 +1h45 Pakistan Railways Wed 7 Oct 14:46 +2h06 Pakistan Railways Tue 6 Oct 15:19 +2h41 Pakistan Railways Mon 5 Oct 14:47 +2h07 Pakistan Railways Seen on 4 of 5 days, ranging +1h45 to +2h41. Every train at Daharki →
37Mirpur Matheloscheduled 13:02+2h054 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 14:44 +1h40 Pakistan Railways Wed 7 Oct 15:06 +2h03 Pakistan Railways Tue 6 Oct 15:41 +2h38 Pakistan Railways Mon 5 Oct 15:10 +2h07 Pakistan Railways Seen on 4 of 5 days, ranging +1h40 to +2h38. Every train at Mirpur Mathelo →
38Ghotkischeduled 13:36+1h564 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 15:09 +1h32 Pakistan Railways Wed 7 Oct 15:30 +1h53 Pakistan Railways Tue 6 Oct 16:03 +2h25 Pakistan Railways Mon 5 Oct 15:36 +1h58 Pakistan Railways Seen on 4 of 5 days, ranging +1h32 to +2h25. Every train at Ghotki →
39Pano Akilscheduled 14:09+1h484 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 15:36 +1h26 Pakistan Railways Wed 7 Oct 15:55 +1h45 Pakistan Railways Tue 6 Oct 16:27 +2h16 Pakistan Railways Mon 5 Oct 16:02 +1h51 Pakistan Railways Seen on 4 of 5 days, ranging +1h26 to +2h16. Every train at Pano Akil →
40Rohri Jn.scheduled 14:55+1h224 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 16:12 +1h18 Pakistan Railways Wed 7 Oct 16:37 +1h17 Pakistan Railways Tue 6 Oct 17:10 +1h51 Pakistan Railways Mon 5 Oct 16:45 +1h25 Pakistan Railways Seen on 4 of 5 days, ranging +1h17 to +1h51. Every train at Rohri Jn. →
41Khairpurscheduled 15:47+1h444 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 17:19 +1h33 Pakistan Railways Wed 7 Oct 17:30 +1h41 Pakistan Railways Tue 6 Oct 18:00 +2h12 Pakistan Railways Mon 5 Oct 17:35 +1h46 Pakistan Railways Seen on 4 of 5 days, ranging +1h33 to +2h12. Every train at Khairpur →
42Gambatscheduled 16:12+1h504 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 17:52 +1h39 Pakistan Railways Wed 7 Oct 18:08 +1h54 Pakistan Railways Tue 6 Oct 18:28 +2h14 Pakistan Railways Mon 5 Oct 17:59 +1h45 Pakistan Railways Seen on 4 of 5 days, ranging +1h39 to +2h14. Every train at Gambat →
43Mehrabpurscheduled 16:35+1h504 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 18:18 +1h41 Pakistan Railways Wed 7 Oct 18:30 +1h54 Pakistan Railways Tue 6 Oct 18:50 +2h14 Pakistan Railways Mon 5 Oct 18:20 +1h45 Pakistan Railways Seen on 4 of 5 days, ranging +1h41 to +2h14. Every train at Mehrabpur →
44Bhiria Roadscheduled 16:58+1h514 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 18:42 +1h43 Pakistan Railways Wed 7 Oct 18:55 +1h56 Pakistan Railways Tue 6 Oct 19:16 +2h16 Pakistan Railways Mon 5 Oct 18:44 +1h45 Pakistan Railways Seen on 4 of 5 days, ranging +1h43 to +2h16. Every train at Bhiria Road →
45Padidanscheduled 17:20+1h513 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct 19:12 +1h51 Pakistan Railways Tue 6 Oct 19:32 +2h10 Pakistan Railways Mon 5 Oct 19:01 +1h39 Pakistan Railways Seen on 3 of 5 days, ranging +1h39 to +2h10. Every train at Padidan →
46Nawabshah Jn.scheduled 18:45+1h403 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct 20:26 +1h40 Pakistan Railways Tue 6 Oct 20:41 +1h54 Pakistan Railways Mon 5 Oct 20:05 +1h18 Pakistan Railways Seen on 3 of 5 days, ranging +1h18 to +1h54. Every train at Nawabshah Jn. →
47Shahdadpurscheduled 19:38+1h313 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct 21:10 +1h31 Pakistan Railways Tue 6 Oct 21:17 +1h37 Pakistan Railways Mon 5 Oct 20:43 +1h03 Pakistan Railways Seen on 3 of 5 days, ranging +1h03 to +1h37. Every train at Shahdadpur →
48Tando Adamscheduled 20:11+1h333 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct 21:48 +1h36 Pakistan Railways Tue 6 Oct 21:46 +1h33 Pakistan Railways Mon 5 Oct 21:07 +57m Pakistan Railways Seen on 3 of 5 days, ranging +57m to +1h36. Every train at Tando Adam →
49Hyderabad Jnscheduled 21:05+1h373 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct 23:02 +1h47 Pakistan Railways Tue 6 Oct 22:51 +1h37 Pakistan Railways Mon 5 Oct 22:30 +1h16 Pakistan Railways Seen on 3 of 5 days, ranging +1h16 to +1h47. Every train at Hyderabad Jn →
50Kotri Jnscheduled 21:33+1h453 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct 23:42 +2h07 Pakistan Railways Tue 6 Oct 23:18 +1h45 Pakistan Railways Mon 5 Oct 23:04 +1h29 Pakistan Railways Seen on 3 of 5 days, ranging +1h29 to +2h07. Every train at Kotri Jn →
51Landhi Jn.scheduled 23:22+1h593 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct 01:42 +2h19 Pakistan Railways Tue 6 Oct 01:23 +1h59 Pakistan Railways Mon 5 Oct 01:05 +1h42 Pakistan Railways Seen on 3 of 5 days, ranging +1h42 to +2h19. Every train at Landhi Jn. →
52Drigh Roadscheduled 00:00+1h403 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct 02:04 +2h03 Pakistan Railways Tue 6 Oct 01:41 +1h40 Pakistan Railways Mon 5 Oct 01:25 +1h24 Pakistan Railways Seen on 3 of 5 days, ranging +1h24 to +2h03. Every train at Drigh Road →
53Karachi Canttscheduled 00:30+1h263 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct 02:34 +1h59 Pakistan Railways Tue 6 Oct 01:55 +1h26 Train GPS Mon 5 Oct 01:49 +1h14 Pakistan Railways Seen on 3 of 5 days, ranging +1h14 to +1h59. Every train at Karachi Cantt →
54Karachi Cityscheduled 00:45+1h261 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Wed 7 Oct not recorded — Tue 6 Oct not recorded — Mon 5 Oct 02:10 +1h26 Train GPS Seen on 1 of 5 days. Every train at Karachi City →
What the marks mean
- Tap a station — each day’s arrival, delay and recorder
- Green — within 15 minutes of the scheduled time
- Amber — 16 to 45 minutes late
- Red — over 45 minutes late
- Hollow — not recorded that day
- Grey — arrived, no delay figure
- Dash (—) — no delay figure for this stop yet
- Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
- The starting station is not listed — a train does not arrive where it begins.
- 12 further stops on this route with nothing recorded yet — not listed.
Common questions
Is Hazara Express 12DN usually late?
Typically 110 minutes late arriving at Karachi City, measured across 18 recorded arrivals (30 Jul – 5 Oct 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.
How late is Hazara Express 12DN on a bad day?
On the worst one run in ten, 226 minutes late into Karachi City, against a typical 110 minutes late. Both come from the same 18 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.
What time does Hazara Express 12DN leave Havelian?
14:00, on the current published timetable. It is booked into Karachi City at 00:45, two days after it leaves. Those are booked times. The delay figures on this page are what we recorded against them.
How long does Hazara Express 12DN take from Havelian to Karachi City?
34h 45m on the timetable. In practice a typical run has taken 36h 35m, measured from recorded arrivals at Karachi City.
How many stops does Hazara Express 12DN make?
54 on the current published timetable, from Havelian to Karachi City. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.
Where is Hazara Express 12DN right now?
The live tracker for this train shows its last reported position and how late it was running at its most recent recorded stop. Position comes from the operator's own feed. When a train is not reporting we say so rather than estimating where it might be.
Service history (first year, operating eras) is drawn from Wikipedia's List of Pakistan Railways trains, retrieved 15 August 2026, matched on train number. Further reading: the train's own Wikipedia article.