latetrains.pkLate, on record45 live
Trains/Havelian–Karachi/Hazara Express 12DN

12 Hazara Express 12DN ہزارا ایکسپریس 12ڈاؤن

Kitni late hoti hai? Typical delay, on-time record aur station timings.
HAVELIANKARACHIHAVELIAN
Down direction · returnsحویلیاں ۔ سٹی اسٹیشن کراچی ۔ حویلیاں
In service since 2006ExpressLast seen 9 October 202672 days trackedTrack it live →
Live running status — right nowLive · 16 sec · official GPS

Running 44 min late — heading for Gujar Khan, due 18:45 (operator's estimate), 30 km/h. Last crossed Chaklala.

Another Hazara Express 12DN is also on the line right now — a second departure is in flight.

How late is it, usually?

median per recorded stop arrival

Every figure here is a median, not an average: why we publish a median, not an average. What counts as on time, and why some figures here are blank, is set out in what on time means here, and every threshold behind it.

At Karachi City+1h 50mmedian of 18 recorded arrivals · 30 Jul – 5 Oct 2026
Typical delay, any stop+1h 21mat a station this train calls at, not necessarily where you board · last 28 days
On time (within 15 min)10% of recorded stop arrivals
Bad day (90th percentile)+2h 19mworse than nine tenths of recorded stop arrivals

11 days of recorded arrivals.

Over 18 recorded arrivals (30 Jul – 5 Oct 2026), Hazara Express 12DN has typically reached Karachi City around 02:35 two days after it leaves — on the worst one run in ten, past 04:31 two days after it leaves, at Karachi City itself. Today's run: track it live →

The “At Karachi City” tile above is the arrival at the end of the run; “Typical delay, any stop” averages every stop including the earlier ones, so it usually reads smaller. Where the time goes, below, shows every stop we have recorded.

How long does it take?

scheduled vs recorded

Scheduled 34h 45m — Havelian to Karachi City. Typically 36h 35m, 1h 50m longer.

Timetable: out 14:00, in at 00:45 two days later — two nights on board.

What these figures cover
  • Scheduled — the current timetable, Havelian 14:00 to Karachi City 00:45 two days later
  • Typical journey — from the scheduled departure to the recorded arrival at Karachi City; the median of 18 runs
  • Bad day — 38h 31m at the 90th percentile: nine runs in ten come in under it
  • Keyline — the scheduled time. The solid bar is the typical journey, the faint bar behind it the bad day.
  • Recorded arrivals: 30 July to 5 October 2026.
  • End to end. For a shorter leg, the stop times are in the timetable below.

Which day is worst?

mean minutes late per recorded arrival, 8-week window
Mon+1h 19m · 5 runs
Tue+1h 09m · 5 runs
Wed+1h 13m · 5 runs
Thu+58 min · 5 runs
Fri+2h 03m · 5 runs
Sat+44 min · 4 runs
Sun+1h 23m · 5 runs

This is a mean over an 8-week window, not the median (typical) figure above — the two are not directly comparable.

Where the time goes

most of it lost after Baldher

Leaves Baldher on time · reaches Karachi City +1h 50m — +1h 50m lost along the way.

  1. Havelian14:00حویلیاں—
  2. Baldher14:18بالھدرon time
  3. Haripur Hazara14:53ہری پور ہزارہ5 min early
  4. Kot Najib Ullah15:15کوٹ نجیب اللہ4 min early
  5. Taxila Cantt15:56ٹیکسلا کینٹ6 min early
  6. Golra Sharif16:17گولڑہ شریف+13 min
  7. Rawalpindi17:10راولپِنڈى+18 min
  8. Chaklala17:21چکلالہ+22 min
  9. Gujar Khan18:03گُوجر خان+37 min
  10. Jhelum19:37جہلم+29 min
  11. Lala Musa Jn.20:55لالہ مُوسٰی جنکشن+20 min
  12. Dinga21:21ڈنگہ+20 min
  13. Mandi Bahauddin21:50منڈی بہاوّالدین+20 min
  14. Malakwal Jn22:25ملکوال جنکشن+16 min
  15. Phularwan23:00پھلروان+28 min
  16. Bhalwal23:27بھلوال+26 min
  17. Sargodha Jn00:25سرگودھا جنکشن+18 min
  18. Shaheenabad Jn00:50شاہین آباد جنکشن+28 min
  19. Sillanwali01:07سلانوالی+36 min
  20. Jhang Sadar02:30جھنگ صدر+58 min
  21. Shorkot Cantt Jn04:30شورکوٹ کینٹ جنکشن+1h 02m
  22. Abdul Hakim05:07عبد الحكيم+58 min
  23. Khanewal Jn06:00خانیوال+47 min
  24. Multan Cantt07:05ملتان کینٹ+1h 04m
  25. Shujabad07:37شجاع آباد+1h 09m
  26. Gilawala07:58گیلا والا+1h 07m
  27. Lodhran Jn08:20لودهراں جنکشن+1h 13m
  28. Bahawalpur08:45بہاولپور+1h 04m
  29. Samasata Jn09:00سمہ سٹہ جنکشن+1h 10m
  30. Mubarakpur09:18مبارک پور+1h 23m
  31. Dera Nawab Sahib09:35ڈیرہ نواب صاحب+1h 17m
  32. Liaquatpur10:07لیاقت پور+1h 20m
  33. Khanpur Jn.10:55خانپور جنکشن+1h 19m
  34. Rahim Yar Khan11:35رحیم یار خان+1h 25m
  35. Sadiqabad11:57صادق آباد+1h 36m
  36. Daharki12:41ڈہرکی+1h 37m
  37. Mirpur Mathelo13:04میر پور ماتھیلو+1h 35m
  38. Ghotki13:38گھوٹکی+1h 26m
  39. Pano Akil14:11پنو عاقل+1h 19m
  40. Rohri Jn.15:20روہڑی جنکشن+1h 10m
  41. Khairpur15:49خیرپور+1h 23m
  42. Gambat16:14گامبٹ+1h 22m
  43. Mehrabpur16:37محراب پور+1h 26m
  44. Bhiria Road17:00بھریا روڈ+1h 28m
  45. Padidan17:22پڈعیدن+1h 23m
  46. Nawabshah Jn.18:47نوابشاہ جنکشن+1h 10m
  47. Shahdadpur19:40شهدادپور+1h 01m
  48. Tando Adam20:13ٹنڈو آدَم+57 min
  49. Hyderabad Jn21:15حیدرآباد جنکشن+1h 08m
  50. Kotri Jn21:35کوٹری جنکشن+1h 26m
  51. Landhi Jn.23:24لانڈھی جنکشن+1h 38m
  52. Drigh Road00:02ڈرگ روڈ+1h 22m
  53. Karachi Cantt00:35کراچی کينٹ+1h 14m
  54. Karachi City00:45سٹی اسٹیشن کراچی+1h 50m

Where it stands longest past the timetableshortest to longest recorded

  1. Karachi Canttscheduled 5 min1 min–2h 07m
  2. Rohri Jn.scheduled 25 min25–54 min
  3. Malakwal Jnscheduled 5 min8 min–1h 49m
  4. Taxila Canttscheduled 2 min4–23 min
  5. Haripur Hazarascheduled 2 min4–14 min
What the marks mean
  • Solid bar — the typical delay at that stop (median of recorded arrivals)
  • Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
  • No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
  • — (no solid bar either) — fewer than 3 recorded runs at that stop
  • A negative figure means the train typically ran early at that stop, not late
  • Band — the shortest and the longest stand recorded at that stop. The train has left as early as the first figure.
  • Keyline — the scheduled stop, arrival to departure on the timetable below.
  • Why a train stands is not recorded — a crossing, a loco change and a red signal all look the same on the clock.
  • The five stops that stand longest past the timetable, not every stop — most routes have more. A stop qualifies with 7 or more runs timed in and out, and is skipped where the timetable books no stop, books one over an hour, or where any recorded stand ran past three hours.
  • Most time is lost between Karachi Cantt and Karachi City (+36 min)
  • Every stop on the current timetable is listed, in order, measured or not.

Timetable

scheduled → actual, 9 October 2026 run

The second time in a cell is what actually happened on the 9 October 2026 run.

#StationArrivalDeparture
1Havelian—14:00
2Baldher14:1714:18
3Haripur Hazara14:5114:53
⋯ 3 stops
4Kot Najib Ullah15:1315:15
5Taxila Cantt15:5415:56
6Golra Sharif16:1516:17
7Rawalpindi16:4017:10
8Chaklala17:19 → 17:41·PR17:21 → 17:44
⋯ 44 stops
9Gujar Khan18:0118:03
10Jhelum19:3519:37
11Lala Musa Jn.20:3020:55
12Dinga21:1921:21
13Mandi Bahauddin21:4521:50
14Malakwal Jn22:2022:25
15Phularwan22:5823:00
16Bhalwal23:2523:27
17Sargodha Jn00:15 +1d00:25 +1d
18Shaheenabad Jn00:49 +1d00:50 +1d
19Sillanwali01:05 +1d01:07 +1d
20Jhang Sadar02:25 +1d02:30 +1d
21Shorkot Cantt Jn04:25 +1d04:30 +1d
22Abdul Hakim05:05 +1d05:07 +1d
23Khanewal Jn05:55 +1d06:00 +1d
24Multan Cantt06:35 +1d07:05 +1d
25Shujabad07:35 +1d07:37 +1d
26Gilawala07:56 +1d07:58 +1d
27Lodhran Jn08:18 +1d08:20 +1d
28Bahawalpur08:40 +1d08:45 +1d
29Samasata Jn08:58 +1d09:00 +1d
30Mubarakpur09:16 +1d09:18 +1d
31Dera Nawab Sahib09:33 +1d09:35 +1d
32Liaquatpur10:05 +1d10:07 +1d
33Khanpur Jn.10:50 +1d10:55 +1d
34Rahim Yar Khan11:30 +1d11:35 +1d
35Sadiqabad11:55 +1d11:57 +1d
36Daharki12:39 +1d12:41 +1d
37Mirpur Mathelo13:02 +1d13:04 +1d
38Ghotki13:36 +1d13:38 +1d
39Pano Akil14:09 +1d14:11 +1d
40Rohri Jn.14:55 +1d15:20 +1d
41Khairpur15:47 +1d15:49 +1d
42Gambat16:12 +1d16:14 +1d
43Mehrabpur16:35 +1d16:37 +1d
44Bhiria Road16:58 +1d17:00 +1d
45Padidan17:20 +1d17:22 +1d
46Nawabshah Jn.18:45 +1d18:47 +1d
47Shahdadpur19:38 +1d19:40 +1d
48Tando Adam20:11 +1d20:13 +1d
49Hyderabad Jn21:05 +1d21:15 +1d
50Kotri Jn21:33 +1d21:35 +1d
51Landhi Jn.23:22 +1d23:24 +1d
52Drigh Road00:00 +2d00:02 +2d
53Karachi Cantt00:30 +2d00:35 +2d
54Karachi City00:45 +2d—
What the marks mean
  • → 21:28 — actual time on the 9 October 2026 run
  • ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
  • +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
  • Blank — not recorded

A full recorded run: 22 August 2026 →

Station by station, last 5 days

125 arrivals recorded

One mark per day, newest first.

Days shownFri9 OctThu8 OctWed7 OctTue6 OctMon5 Oct

A run’s GPS trail is decoded after the journey completes — recent days may link later.

  • 2Baldherscheduled 14:17+1m1 day
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct14:19+1mPakistan Railways
    Wed 7 Octnot recorded—
    Tue 6 Octnot recorded—
    Mon 5 Octnot recorded—

    Seen on 1 of 5 days. Every train at Baldher →

  • 3Haripur Hazarascheduled 14:515m early1 day
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct14:485m earlyPakistan Railways
    Wed 7 Octnot recorded—
    Tue 6 Octnot recorded—
    Mon 5 Octnot recorded—

    Seen on 1 of 5 days. Every train at Haripur Hazara →

  • 4Kot Najib Ullahscheduled 15:136m early1 day
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct15:086m earlyPakistan Railways
    Wed 7 Octnot recorded—
    Tue 6 Octnot recorded—
    Mon 5 Octnot recorded—

    Seen on 1 of 5 days. Every train at Kot Najib Ullah →

  • 5Taxila Canttscheduled 15:547m early1 day
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct15:487m earlyPakistan Railways
    Wed 7 Octnot recorded—
    Tue 6 Octnot recorded—
    Mon 5 Octnot recorded—

    Seen on 1 of 5 days. Every train at Taxila Cantt →

  • 6Golra Sharifscheduled 16:15+12m1 day
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct16:28+12mPakistan Railways
    Wed 7 Octnot recorded—
    Tue 6 Octnot recorded—
    Mon 5 Octnot recorded—

    Seen on 1 of 5 days. Every train at Golra Sharif →

  • 7Rawalpindischeduled 16:40+23m3 days
    DayArrivedDelayRecorded by
    Fri 9 Octarrived, time not recorded+23mPakistan Railways
    Thu 8 Oct16:5217m earlyPakistan Railways
    Wed 7 Octarrived, time not recorded+57mPakistan Railways
    Tue 6 Octnot recorded—
    Mon 5 Octnot recorded—

    Seen on 3 of 5 days, ranging 17m early to +57m. Every train at Rawalpindi →

  • 8Chaklalascheduled 17:19+52m2 days
    DayArrivedDelayRecorded by
    Fri 9 Oct17:41+21mPakistan Railways
    Thu 8 Octnot recorded—
    Wed 7 Oct18:43+1h23Pakistan Railways
    Tue 6 Octnot recorded—
    Mon 5 Octnot recorded—

    Seen on 2 of 5 days, ranging +21m to +1h23. Every train at Chaklala →

  • 10Jhelumscheduled 19:35+1h401 day
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Octarrived, time not recorded+1h40Pakistan Railways
    Tue 6 Octnot recorded—
    Mon 5 Octnot recorded—

    Seen on 1 of 5 days. Every train at Jhelum →

  • 11Lala Musa Jn.scheduled 20:30+1h411 day
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Oct22:10+1h41Pakistan Railways
    Tue 6 Octnot recorded—
    Mon 5 Octnot recorded—

    Seen on 1 of 5 days. Every train at Lala Musa Jn. →

  • 12Dingascheduled 21:19+1h331 day
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Oct22:53+1h33Pakistan Railways
    Tue 6 Octnot recorded—
    Mon 5 Octnot recorded—

    Seen on 1 of 5 days. Every train at Dinga →

  • 24Multan Canttscheduled 06:35+1h254 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octarrived, time not recorded+1h27Pakistan Railways
    Wed 7 Octarrived, time not recorded+1h23Pakistan Railways
    Tue 6 Octarrived, time not recorded+1h28Pakistan Railways
    Mon 5 Octarrived, time not recorded+1h22Pakistan Railways

    Seen on 4 of 5 days, ranging +1h22 to +1h28. Every train at Multan Cantt →

  • 25Shujabadscheduled 07:35+1h524 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct09:12+1h36Pakistan Railways
    Wed 7 Oct09:23+1h47Pakistan Railways
    Tue 6 Oct09:49+2h13Pakistan Railways
    Mon 5 Oct09:33+1h57Pakistan Railways

    Seen on 4 of 5 days, ranging +1h36 to +2h13. Every train at Shujabad →

  • 26Gilawalascheduled 07:56+1h514 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct09:33+1h35Pakistan Railways
    Wed 7 Oct09:44+1h46Pakistan Railways
    Tue 6 Oct10:09+2h12Pakistan Railways
    Mon 5 Oct09:53+1h55Pakistan Railways

    Seen on 4 of 5 days, ranging +1h35 to +2h12. Every train at Gilawala →

  • 27Lodhran Jnscheduled 08:18+1h564 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct10:00+1h41Pakistan Railways
    Wed 7 Oct10:12+1h53Pakistan Railways
    Tue 6 Oct10:34+2h14Pakistan Railways
    Mon 5 Oct10:15+1h58Pakistan Railways

    Seen on 4 of 5 days, ranging +1h41 to +2h14. Every train at Lodhran Jn →

  • 28Bahawalpurscheduled 08:40+1h464 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct10:14+1h30Pakistan Railways
    Wed 7 Oct10:26+1h42Pakistan Railways
    Tue 6 Oct10:50+2h05Pakistan Railways
    Mon 5 Oct10:34+1h49Pakistan Railways

    Seen on 4 of 5 days, ranging +1h30 to +2h05. Every train at Bahawalpur →

  • 29Samasata Jnscheduled 08:58+1h524 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct10:31+1h32Pakistan Railways
    Wed 7 Oct10:47+1h47Pakistan Railways
    Tue 6 Oct11:11+2h12Pakistan Railways
    Mon 5 Oct10:56+1h57Pakistan Railways

    Seen on 4 of 5 days, ranging +1h32 to +2h12. Every train at Samasata Jn →

  • 30Mubarakpurscheduled 09:16+1h584 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct10:55+1h38Pakistan Railways
    Wed 7 Oct11:11+1h53Pakistan Railways
    Tue 6 Oct11:40+2h22Pakistan Railways
    Mon 5 Oct11:20+2h02Pakistan Railways

    Seen on 4 of 5 days, ranging +1h38 to +2h22. Every train at Mubarakpur →

  • 31Dera Nawab Sahibscheduled 09:33+1h524 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct11:07+1h32Pakistan Railways
    Wed 7 Oct11:19+1h47Pakistan Railways
    Tue 6 Oct11:51+2h17Pakistan Railways
    Mon 5 Oct11:31+1h57Pakistan Railways

    Seen on 4 of 5 days, ranging +1h32 to +2h17. Every train at Dera Nawab Sahib →

  • 32Liaquatpurscheduled 10:05+1h534 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct11:40+1h33Pakistan Railways
    Wed 7 Oct11:56+1h49Pakistan Railways
    Tue 6 Oct12:25+2h19Pakistan Railways
    Mon 5 Oct12:04+1h57Pakistan Railways

    Seen on 4 of 5 days, ranging +1h33 to +2h19. Every train at Liaquatpur →

  • 33Khanpur Jn.scheduled 10:50+1h424 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct12:19+1h30Pakistan Railways
    Wed 7 Oct12:32+1h37Pakistan Railways
    Tue 6 Oct13:10+2h16Pakistan Railways
    Mon 5 Oct12:41+1h46Pakistan Railways

    Seen on 4 of 5 days, ranging +1h30 to +2h16. Every train at Khanpur Jn. →

  • 34Rahim Yar Khanscheduled 11:30+1h544 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct13:10+1h35Pakistan Railways
    Wed 7 Oct13:26+1h51Pakistan Railways
    Tue 6 Oct14:02+2h27Pakistan Railways
    Mon 5 Oct13:32+1h57Pakistan Railways

    Seen on 4 of 5 days, ranging +1h35 to +2h27. Every train at Rahim Yar Khan →

  • 35Sadiqabadscheduled 11:55+2h024 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct13:37+1h40Pakistan Railways
    Wed 7 Oct13:57+2hPakistan Railways
    Tue 6 Oct14:27+2h30Pakistan Railways
    Mon 5 Oct14:00+2h04Pakistan Railways

    Seen on 4 of 5 days, ranging +1h40 to +2h30. Every train at Sadiqabad →

  • 36Daharkischeduled 12:39+2h074 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct14:26+1h45Pakistan Railways
    Wed 7 Oct14:46+2h06Pakistan Railways
    Tue 6 Oct15:19+2h41Pakistan Railways
    Mon 5 Oct14:47+2h07Pakistan Railways

    Seen on 4 of 5 days, ranging +1h45 to +2h41. Every train at Daharki →

  • 37Mirpur Matheloscheduled 13:02+2h054 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct14:44+1h40Pakistan Railways
    Wed 7 Oct15:06+2h03Pakistan Railways
    Tue 6 Oct15:41+2h38Pakistan Railways
    Mon 5 Oct15:10+2h07Pakistan Railways

    Seen on 4 of 5 days, ranging +1h40 to +2h38. Every train at Mirpur Mathelo →

  • 38Ghotkischeduled 13:36+1h564 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct15:09+1h32Pakistan Railways
    Wed 7 Oct15:30+1h53Pakistan Railways
    Tue 6 Oct16:03+2h25Pakistan Railways
    Mon 5 Oct15:36+1h58Pakistan Railways

    Seen on 4 of 5 days, ranging +1h32 to +2h25. Every train at Ghotki →

  • 39Pano Akilscheduled 14:09+1h484 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct15:36+1h26Pakistan Railways
    Wed 7 Oct15:55+1h45Pakistan Railways
    Tue 6 Oct16:27+2h16Pakistan Railways
    Mon 5 Oct16:02+1h51Pakistan Railways

    Seen on 4 of 5 days, ranging +1h26 to +2h16. Every train at Pano Akil →

  • 40Rohri Jn.scheduled 14:55+1h224 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct16:12+1h18Pakistan Railways
    Wed 7 Oct16:37+1h17Pakistan Railways
    Tue 6 Oct17:10+1h51Pakistan Railways
    Mon 5 Oct16:45+1h25Pakistan Railways

    Seen on 4 of 5 days, ranging +1h17 to +1h51. Every train at Rohri Jn. →

  • 41Khairpurscheduled 15:47+1h444 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct17:19+1h33Pakistan Railways
    Wed 7 Oct17:30+1h41Pakistan Railways
    Tue 6 Oct18:00+2h12Pakistan Railways
    Mon 5 Oct17:35+1h46Pakistan Railways

    Seen on 4 of 5 days, ranging +1h33 to +2h12. Every train at Khairpur →

  • 42Gambatscheduled 16:12+1h504 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct17:52+1h39Pakistan Railways
    Wed 7 Oct18:08+1h54Pakistan Railways
    Tue 6 Oct18:28+2h14Pakistan Railways
    Mon 5 Oct17:59+1h45Pakistan Railways

    Seen on 4 of 5 days, ranging +1h39 to +2h14. Every train at Gambat →

  • 43Mehrabpurscheduled 16:35+1h504 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct18:18+1h41Pakistan Railways
    Wed 7 Oct18:30+1h54Pakistan Railways
    Tue 6 Oct18:50+2h14Pakistan Railways
    Mon 5 Oct18:20+1h45Pakistan Railways

    Seen on 4 of 5 days, ranging +1h41 to +2h14. Every train at Mehrabpur →

  • 44Bhiria Roadscheduled 16:58+1h514 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Oct18:42+1h43Pakistan Railways
    Wed 7 Oct18:55+1h56Pakistan Railways
    Tue 6 Oct19:16+2h16Pakistan Railways
    Mon 5 Oct18:44+1h45Pakistan Railways

    Seen on 4 of 5 days, ranging +1h43 to +2h16. Every train at Bhiria Road →

  • 45Padidanscheduled 17:20+1h513 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Oct19:12+1h51Pakistan Railways
    Tue 6 Oct19:32+2h10Pakistan Railways
    Mon 5 Oct19:01+1h39Pakistan Railways

    Seen on 3 of 5 days, ranging +1h39 to +2h10. Every train at Padidan →

  • 46Nawabshah Jn.scheduled 18:45+1h403 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Oct20:26+1h40Pakistan Railways
    Tue 6 Oct20:41+1h54Pakistan Railways
    Mon 5 Oct20:05+1h18Pakistan Railways

    Seen on 3 of 5 days, ranging +1h18 to +1h54. Every train at Nawabshah Jn. →

  • 47Shahdadpurscheduled 19:38+1h313 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Oct21:10+1h31Pakistan Railways
    Tue 6 Oct21:17+1h37Pakistan Railways
    Mon 5 Oct20:43+1h03Pakistan Railways

    Seen on 3 of 5 days, ranging +1h03 to +1h37. Every train at Shahdadpur →

  • 48Tando Adamscheduled 20:11+1h333 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Oct21:48+1h36Pakistan Railways
    Tue 6 Oct21:46+1h33Pakistan Railways
    Mon 5 Oct21:07+57mPakistan Railways

    Seen on 3 of 5 days, ranging +57m to +1h36. Every train at Tando Adam →

  • 49Hyderabad Jnscheduled 21:05+1h373 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Oct23:02+1h47Pakistan Railways
    Tue 6 Oct22:51+1h37Pakistan Railways
    Mon 5 Oct22:30+1h16Pakistan Railways

    Seen on 3 of 5 days, ranging +1h16 to +1h47. Every train at Hyderabad Jn →

  • 50Kotri Jnscheduled 21:33+1h453 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Oct23:42+2h07Pakistan Railways
    Tue 6 Oct23:18+1h45Pakistan Railways
    Mon 5 Oct23:04+1h29Pakistan Railways

    Seen on 3 of 5 days, ranging +1h29 to +2h07. Every train at Kotri Jn →

  • 51Landhi Jn.scheduled 23:22+1h593 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Oct01:42+2h19Pakistan Railways
    Tue 6 Oct01:23+1h59Pakistan Railways
    Mon 5 Oct01:05+1h42Pakistan Railways

    Seen on 3 of 5 days, ranging +1h42 to +2h19. Every train at Landhi Jn. →

  • 52Drigh Roadscheduled 00:00+1h403 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Oct02:04+2h03Pakistan Railways
    Tue 6 Oct01:41+1h40Pakistan Railways
    Mon 5 Oct01:25+1h24Pakistan Railways

    Seen on 3 of 5 days, ranging +1h24 to +2h03. Every train at Drigh Road →

  • 53Karachi Canttscheduled 00:30+1h263 days
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Oct02:34+1h59Pakistan Railways
    Tue 6 Oct01:55+1h26Train GPS
    Mon 5 Oct01:49+1h14Pakistan Railways

    Seen on 3 of 5 days, ranging +1h14 to +1h59. Every train at Karachi Cantt →

  • 54Karachi Cityscheduled 00:45+1h261 day
    DayArrivedDelayRecorded by
    Fri 9 Octnot recorded—
    Thu 8 Octnot recorded—
    Wed 7 Octnot recorded—
    Tue 6 Octnot recorded—
    Mon 5 Oct02:10+1h26Train GPS

    Seen on 1 of 5 days. Every train at Karachi City →

What the marks mean
  • Tap a station — each day’s arrival, delay and recorder
  • Green — within 15 minutes of the scheduled time
  • Amber — 16 to 45 minutes late
  • Red — over 45 minutes late
  • Hollow — not recorded that day
  • Grey — arrived, no delay figure
  • Dash (—) — no delay figure for this stop yet
  • Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
  • The starting station is not listed — a train does not arrive where it begins.
  • 12 further stops on this route with nothing recorded yet — not listed.

Common questions

Is Hazara Express 12DN usually late?

Typically 110 minutes late arriving at Karachi City, measured across 18 recorded arrivals (30 Jul – 5 Oct 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.

How late is Hazara Express 12DN on a bad day?

On the worst one run in ten, 226 minutes late into Karachi City, against a typical 110 minutes late. Both come from the same 18 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.

What time does Hazara Express 12DN leave Havelian?

14:00, on the current published timetable. It is booked into Karachi City at 00:45, two days after it leaves. Those are booked times. The delay figures on this page are what we recorded against them.

How long does Hazara Express 12DN take from Havelian to Karachi City?

34h 45m on the timetable. In practice a typical run has taken 36h 35m, measured from recorded arrivals at Karachi City.

How many stops does Hazara Express 12DN make?

54 on the current published timetable, from Havelian to Karachi City. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.

Where is Hazara Express 12DN right now?

The live tracker for this train shows its last reported position and how late it was running at its most recent recorded stop. Position comes from the operator's own feed. When a train is not reporting we say so rather than estimating where it might be.

Service history (first year, operating eras) is drawn from Wikipedia's List of Pakistan Railways trains, retrieved 15 August 2026, matched on train number. Further reading: the train's own Wikipedia article.