Rahim Yar Khan to Sadiqabad
Jaffar Express 40DN — within 15 minutes of the scheduled time 24% of the time, typically 56 minutes late, over 8 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rahim Yar Khan to Sadiqabad it typically adds 8 min, from 23 recorded runs. At Sadiqabad it has typically arrived 66 minutes late, from 31 recorded runs.
Every train, compared
8 of 9 with 7+ daysOver this leg is the CHANGE in a train's delay between Rahim Yar Khan and Sadiqabad on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rahim Yar Khan — no booked arrival at Rahim Yar Khan to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 18Millat Express 18DN | 01:06 +1d | 01:26 +1d | 20 min | 23 km | +2h 36m | 7% | adds 6 min · 38 |
| 40Jaffar Express 40DN | 01:54 +1d | 02:14 +1d | 20 min | 23 km | +56 min | 24% | adds 8 min · 23 |
| 14Awam Express 14DN | 05:34 +1d | 05:54 +1d | 20 min | 23 km | +2h 10m | 8% | adds 8 min · 36 |
| 12Hazara Express 12DN | 11:35 +1d | 11:55 +1d | 20 min | 23 km | +1h | 12% | adds 5 min · 34 |
| 2Khyber Mail 2DN | 18:04 +1d | 18:24 +1d | 20 min | 23 km | +2h 07m | 7% | adds 9 min · 21 |
| 38Fareed Express 38DN | 19:29 | 19:49 | 20 min | not measured yet | +41 min | 18% | adds 7 min · 29 |
| 26Bahauddin Zikria Express 26DN | 20:39 | 21:00 | 21 min | 23 km | — | — | adds 6 min · 23 |
| 46Pakistan Express 46DN | 21:14 | 21:34 | 20 min | 23 km | +1h 02m | 5% | adds 8 min · 37 |
| 10Allama Iqbal Express 10DN | 21:34 | 21:54 | 20 min | 23 km | +1h 05m | 22% | adds 8 min · 35 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون01:06 +1d→01:26 +1d20 min7% on time · +2h 36madds 6 min over this leg · 38 runs
- Jaffar Express 40DN40جعفر ایکسپریس 40 ڈائون01:54 +1d→02:14 +1d20 min24% on time · +56 minadds 8 min over this leg · 23 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون05:34 +1d→05:54 +1d20 min8% on time · +2h 10madds 8 min over this leg · 36 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن11:35 +1d→11:55 +1d20 min12% on time · +1hadds 5 min over this leg · 34 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون18:04 +1d→18:24 +1d20 min7% on time · +2h 07madds 9 min over this leg · 21 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون19:29→19:4920 min18% on time · +41 minadds 7 min over this leg · 29 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون20:39→21:0021 minno delay figure yetadds 6 min over this leg · 23 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون21:14→21:3420 min5% on time · +1h 02madds 8 min over this leg · 37 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون21:34→21:5420 min22% on time · +1h 05madds 8 min over this leg · 35 runs
Travelling the other way? Sadiqabad to Rahim Yar Khan trains →
Common questions
How many trains run from Rahim Yar Khan to Sadiqabad?
9 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rahim Yar Khan to Sadiqabad?
Millat Express 18DN, booked at 20 min for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rahim Yar Khan to Sadiqabad is most likely to be on time?
Jaffar Express 40DN has the best recorded punctuality of the services we hold enough history for: 24% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 56 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 8 of 9 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rahim Yar Khan to Sadiqabad?
Not on the current timetable. Every service on this route is booked to arrive on the same day it departs.
Do trains lose time between Rahim Yar Khan and Sadiqabad?
Typically yes. Khyber Mail 2DN adds about 9 min to its delay over this leg, measured across 21 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Rahim Yar Khan to Sadiqabad by train?
It is about 23 km along the track. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 8 of the 9 services; the rest of the track on this route has not been traced yet.
Are these Rahim Yar Khan to Sadiqabad timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.