Rawalpindi to Gujar Khan
Jaffar Express 40DN — within 15 minutes of the scheduled time 20% of the time, typically 51 minutes late, over 27 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rawalpindi to Gujar Khan it typically adds 10 min, from 63 recorded runs. At Gujar Khan it has typically arrived 44 minutes late, from 86 recorded runs.
Every train, compared
6 of 6 with 7+ daysOver this leg is the CHANGE in a train's delay between Rawalpindi and Gujar Khan on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rawalpindi — no booked arrival at Rawalpindi to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 46Pakistan Express 46DN | 06:00 | 06:48 | 48 min | not measured yet | +2h 31m | 4% | no data |
| 8Tezgam 8DN | 08:00 | 08:52 | 52 min | not measured yet | +1h 09m | 16% | no data |
| 40Jaffar Express 40DN | 09:35 | 10:27 | 52 min | not measured yet | +51 min | 20% | adds 10 min · 63 |
| 14Awam Express 14DN | 12:30 | 13:30 | 1h | not measured yet | +1h 23m | 15% | adds 20 min · 58 |
| 104Subak Kharam 104DN | 16:30 | 17:20 | 50 min | 54 km | +45 min | 20% | no data |
| 12Hazara Express 12DN | 17:10 | 18:01 | 51 min | not measured yet | +1h 38m | 14% | adds 46 min · 38 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون06:00→06:4848 min4% on time · +2h 31mno data over this leg
- Tezgam 8DN8تیزگام 8 ڈاؤن08:00→08:5252 min16% on time · +1h 09mno data over this leg
- Jaffar Express 40DN40جعفر ایکسپریس 40 ڈائون09:35→10:2752 min20% on time · +51 minadds 10 min over this leg · 63 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون12:30→13:301h15% on time · +1h 23madds 20 min over this leg · 58 runs
- Subak Kharam 104DN104سبک خرام 104 ڈاؤن16:30→17:2050 min20% on time · +45 minno data over this leg
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن17:10→18:0151 min14% on time · +1h 38madds 46 min over this leg · 38 runs
Travelling the other way? Gujar Khan to Rawalpindi trains →
Common questions
How many trains run from Rawalpindi to Gujar Khan?
6 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rawalpindi to Gujar Khan?
Pakistan Express 46DN, booked at 48 min for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rawalpindi to Gujar Khan is most likely to be on time?
Jaffar Express 40DN has the best recorded punctuality of the services we hold enough history for: 20% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 51 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 6 of 6 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rawalpindi to Gujar Khan?
Not on the current timetable. Every service on this route is booked to arrive on the same day it departs.
Do trains lose time between Rawalpindi and Gujar Khan?
Typically yes. Hazara Express 12DN adds about 46 min to its delay over this leg, measured across 38 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Rawalpindi to Gujar Khan by train?
It is about 54 km along the track. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 1 of the 6 services; the rest of the track on this route has not been traced yet.
Are these Rawalpindi to Gujar Khan timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.