Rawalpindi to Lala Musa Jn.
Subak Raftar 102DN — within 15 minutes of the scheduled time 42% of the time, typically 24 minutes late, over 9 days of recorded runs across every stop of its full journey, not this segment alone. At Lala Musa Jn. it has typically arrived 18 minutes late, from 34 recorded runs.
Every train, compared
9 of 9 with 7+ daysOver this leg is the CHANGE in a train's delay between Rawalpindi and Lala Musa Jn. on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rawalpindi — no booked arrival at Rawalpindi to measure from at all. Figures cover runs recorded between 30 July 2026 and 6 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 2Khyber Mail 2DN | 01:50 +1d | 04:40 +1d | 2h 50m | 155 km | +2h 02m | 7% | no data |
| 46Pakistan Express 46DN | 06:00 | 08:52 | 2h 52m | 156 km | +1h 02m | 5% | no data |
| 102Subak Raftar 102DN | 07:00 | 09:48 | 2h 48m | 157 km | +24 min | 42% | no data |
| 8Tezgam 8DN | 08:00 | 11:00 | 3h | 157 km | +58 min | 17% | no data |
| 40Jaffar Express 40DN | 10:35 | 13:40 | 3h 05m | 156 km | +54 min | 26% | makes up 6 min · 35 |
| 14Awam Express 14DN | 12:30 | 15:46 | 3h 16m | 156 km | +2h 09m | 8% | makes up 2 min · 33 |
| 48Rehman Baba Express 48DN | 14:40 | 17:18 | 2h 38m | 566 km | +2h 20m | 13% | adds 18 min · 35 |
| 104Subak Kharam 104DN | 16:30 | 19:17 | 2h 47m | 157 km | +38 min | 30% | no data |
| 12Hazara Express 12DN | 17:10 | 20:30 | 3h 20m | 157 km | +1h 17m | 10% | makes up 3 min · 19 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Khyber Mail 2DN2خیبر میل 2 ڈائون01:50 +1d→04:40 +1d2h 50m7% on time · +2h 02mno data over this leg
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون06:00→08:522h 52m5% on time · +1h 02mno data over this leg
- Subak Raftar 102DN102سبک رفتار102 ڈاؤن07:00→09:482h 48m42% on time · +24 minno data over this leg
- Tezgam 8DN8تیزگام 8 ڈاؤن08:00→11:003h17% on time · +58 minno data over this leg
- Jaffar Express 40DN40جعفر ایکسپریس 40 ڈائون10:35→13:403h 05m26% on time · +54 minmakes up 6 min over this leg · 35 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون12:30→15:463h 16m8% on time · +2h 09mmakes up 2 min over this leg · 33 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن14:40→17:182h 38m13% on time · +2h 20madds 18 min over this leg · 35 runs
- Subak Kharam 104DN104سبک خرام 104 ڈاؤن16:30→19:172h 47m30% on time · +38 minno data over this leg
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن17:10→20:303h 20m10% on time · +1h 17mmakes up 3 min over this leg · 19 runs
Travelling the other way? Lala Musa Jn. to Rawalpindi trains →
Common questions
How many trains run from Rawalpindi to Lala Musa Jn.?
9 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rawalpindi to Lala Musa Jn.?
Rehman Baba Express 48DN, booked at 2h 38m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rawalpindi to Lala Musa Jn. is most likely to be on time?
Subak Raftar 102DN has the best recorded punctuality of the services we hold enough history for: 42% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 24 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 9 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rawalpindi to Lala Musa Jn.?
Not on the current timetable. Every service on this route is booked to arrive on the same day it departs.
Do trains lose time between Rawalpindi and Lala Musa Jn.?
Typically the opposite. Jaffar Express 40DN makes up about 6 min over this leg across 35 recorded runs. That does not mean it runs early; it means it arrived less late than it departed, which usually says more about how the timetable books this stretch than about the train.
How far is it from Rawalpindi to Lala Musa Jn. by train?
It is between 155 and 566 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails.
Are these Rawalpindi to Lala Musa Jn. timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.