Shalimar Express 28DN — within 15 minutes of the scheduled time 39% of the time, typically 26 minutes late, over 26 days of recorded runs across every stop of its full journey, not this segment alone.
Every train, compared
9 of 9 with 7+ daysOver this leg is the CHANGE in a train's delay between Sahiwal and Bahawalpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Sahiwal — no booked arrival at Sahiwal to measure from at all. Figures cover runs recorded between 30 July 2026 and 11 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 28Shalimar Express 28DN | 10:05 | 14:25 | 4h 20m | +26 min | 39% | no data |
| 2Khyber Mail 2DN | 11:05 +1d | 15:10 +1d | 4h 05m | +2h 11m | 6% | adds 14 min · 38 |
| 10Allama Iqbal Express 10DN | 15:15 | 19:15 | 4h | +1h | 23% | adds 14 min · 53 |
| 8Tezgam 8DN | 16:29 | 20:25 | 3h 56m | +1h 12m | 11% | adds 23 min · 53 |
| 42Karakoram Express 42DN | 18:00 | 21:45 | 3h 45m | +1h 32m | 21% | no data |
| 40Jaffar Express 40DN | 18:32 | 22:25 | 3h 53m | +48 min | 24% | adds 27 min · 33 |
| 34Pak Business 34DN | 19:06 | 22:10 | 3h 04m | +2h 20m | 11% | adds 25 min · 46 |
| 16Karachi Express 16DN | 20:28 | 00:16 +1d | 3h 48m | +2h 34m | 5% | adds 16 min · 50 |
| 14Awam Express 14DN | 22:05 | 02:21 +1d | 4h 16m | +1h 42m | 10% | adds 20 min · 51 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون10:05→14:254h 20m39% on time · +26 minno data over this leg
- Khyber Mail 2DN2خیبر میل 2 ڈائون11:05 +1d→15:10 +1d4h 05m6% on time · +2h 11madds 14 min over this leg · 38 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون15:15→19:154h23% on time · +1hadds 14 min over this leg · 53 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن16:29→20:253h 56m11% on time · +1h 12madds 23 min over this leg · 53 runs
- Karakoram Express 42DN42قراقرم ایکسپریس 42 ڈائون18:00→21:453h 45m21% on time · +1h 32mno data over this leg
- Jaffar Express 40DN40جعفر ایکسپریس 40 ڈائون18:32→22:253h 53m24% on time · +48 minadds 27 min over this leg · 33 runs
- Pak Business 34DN34پاک بزنس 34 ڈائون19:06→22:103h 04m11% on time · +2h 20madds 25 min over this leg · 46 runs
- Karachi Express 16DN16کراچی ایکسپریس 16 ڈائون20:28→00:16 +1d3h 48m5% on time · +2h 34madds 16 min over this leg · 50 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون22:05→02:21 +1d4h 16m10% on time · +1h 42madds 20 min over this leg · 51 runs
Travelling the other way? Bahawalpur to Sahiwal trains →
Common questions
How many trains run from Sahiwal to Bahawalpur?
9 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Sahiwal to Bahawalpur?
Pak Business 34DN, booked at 3h 04m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Sahiwal to Bahawalpur is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 39% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 26 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 9 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Sahiwal to Bahawalpur?
Yes. 2 of the 9 scheduled services are booked to arrive on a later day than they depart: Karachi Express 16DN, Awam Express 14DN.
Do trains lose time between Sahiwal and Bahawalpur?
Typically yes. Jaffar Express 40DN adds about 27 min to its delay over this leg, measured across 33 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Sahiwal to Bahawalpur timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.