Shahdadpur to Mehrabpur
Sukkur Express 145UP — within 15 minutes of the scheduled time 18% of the time, typically 83 minutes late, over 26 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Shahdadpur to Mehrabpur it typically adds 53 min, from 51 recorded runs. At Mehrabpur it has typically arrived 126 minutes late, from 74 recorded runs.
Every train, compared
7 of 7 with 7+ daysOver this leg is the CHANGE in a train's delay between Shahdadpur and Mehrabpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Shahdadpur — no booked arrival at Shahdadpur to measure from at all. Figures cover runs recorded between 30 July 2026 and 12 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 37Fareed Express 37UP | 00:22 +1d | 02:20 +1d | 1h 58m | +1h 42m | 7% | adds 45 min · 42 |
| 145Sukkur Express 145UP | 03:57 +1d | 06:06 +1d | 2h 09m | +1h 23m | 18% | adds 53 min · 51 |
| 13Awam Express 13UP | 11:47 | 14:13 | 2h 26m | +2h 20m | 4% | adds 27 min · 52 |
| 11Hazara Express 11UP | 12:43 | 15:06 | 2h 23m | +1h 32m | 15% | adds 34 min · 49 |
| 17Millat Express 17UP | 20:39 | 22:28 | 1h 49m | +1h 35m | 8% | adds 51 min · 52 |
| 7Tezgam 7UP | 21:28 | 23:09 | 1h 41m | +2h 41m | 4% | adds 46 min · 48 |
| 25Bahauddin Zikria Express 25UP | 23:08 | 00:55 +1d | 1h 47m | +2h 02m | 6% | adds 43 min · 31 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Fareed Express 37UP37فرید ایکسپریس 37 اپ00:22 +1d→02:20 +1d1h 58m7% on time · +1h 42madds 45 min over this leg · 42 runs
- Sukkur Express 145UP145سکھر ایکسپریس145اپ03:57 +1d→06:06 +1d2h 09m18% on time · +1h 23madds 53 min over this leg · 51 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ11:47→14:132h 26m4% on time · +2h 20madds 27 min over this leg · 52 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ12:43→15:062h 23m15% on time · +1h 32madds 34 min over this leg · 49 runs
- Millat Express 17UP17ملت ایکسپریس 17 اپ20:39→22:281h 49m8% on time · +1h 35madds 51 min over this leg · 52 runs
- Tezgam 7UP7تيزگام 7 اپ21:28→23:091h 41m4% on time · +2h 41madds 46 min over this leg · 48 runs
- Bahauddin Zikria Express 25UP25بہائو الدین زکریا ایکسپری25 اپ23:08→00:55 +1d1h 47m6% on time · +2h 02madds 43 min over this leg · 31 runs
Travelling the other way? Mehrabpur to Shahdadpur trains →
Common questions
How many trains run from Shahdadpur to Mehrabpur?
7 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Shahdadpur to Mehrabpur?
Tezgam 7UP, booked at 1h 41m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Shahdadpur to Mehrabpur is most likely to be on time?
Sukkur Express 145UP has the best recorded punctuality of the services we hold enough history for: 18% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 1h 23m. That is its record across every stop of its full journey, not this leg alone: over just Shahdadpur to Mehrabpur it typically adds 53 min, from 51 recorded runs. Measured from recorded runs, not from the timetable. 7 of 7 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Shahdadpur to Mehrabpur?
Yes. 1 of the 7 scheduled services is booked to arrive on a later day than it departs: Bahauddin Zikria Express 25UP.
Do trains lose time between Shahdadpur and Mehrabpur?
Typically yes. Sukkur Express 145UP adds about 53 min to its delay over this leg, measured across 51 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Shahdadpur to Mehrabpur timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.