Wazirabad Jn to Bahawalpur
Jaffar Express 40DN — within 15 minutes of the scheduled time 25% of the time, typically 50 minutes late, over 11 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Wazirabad Jn to Bahawalpur it typically adds 38 min, from 30 recorded runs. At Bahawalpur it has typically arrived 36 minutes late, from 33 recorded runs.
Every train, compared
6 of 7 with 7+ daysOver this leg is the CHANGE in a train's delay between Wazirabad Jn and Bahawalpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Wazirabad Jn — no booked arrival at Wazirabad Jn to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 2Khyber Mail 2DN | 05:23 +1d | 14:55 +1d | 9h 32m | 548 km | +2h 09m | 6% | adds 1h 38m · 13 |
| 46Pakistan Express 46DN | 09:50 | 18:50 | 9h | 481 km | +1h 05m | 6% | adds 1h 12m · 21 |
| 8Tezgam 8DN | 11:42 | 20:25 | 8h 43m | 537 km | +52 min | 18% | adds 1h 01m · 36 |
| 40Jaffar Express 40DN | 14:30 | 23:35 | 9h 05m | 541 km | +50 min | 25% | adds 38 min · 30 |
| 14Awam Express 14DN | 16:34 | 02:10 +1d | 9h 36m | 548 km | +2h 03m | 8% | adds 1h 32m · 33 |
| 36Sir Sayyed Express 36DN | 16:56 | 00:48 +1d | 7h 52m | not measured yet | — | — | no data |
| 48Rehman Baba Express 48DN | 18:06 | 02:40 +1d | 8h 34m | 480 km | +2h 18m | 13% | adds 43 min · 34 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Khyber Mail 2DN2خیبر میل 2 ڈائون05:23 +1d→14:55 +1d9h 32m6% on time · +2h 09madds 1h 38m over this leg · 13 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون09:50→18:509h6% on time · +1h 05madds 1h 12m over this leg · 21 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن11:42→20:258h 43m18% on time · +52 minadds 1h 01m over this leg · 36 runs
- Jaffar Express 40DN40جعفر ایکسپریس 40 ڈائون14:30→23:359h 05m25% on time · +50 minadds 38 min over this leg · 30 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون16:34→02:10 +1d9h 36m8% on time · +2h 03madds 1h 32m over this leg · 33 runs
- Sir Sayyed Express 36DN36سر سید ایکپریس 36 ڈاؤن16:56→00:48 +1d7h 52mno delay figure yetno data over this leg
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن18:06→02:40 +1d8h 34m13% on time · +2h 18madds 43 min over this leg · 34 runs
Travelling the other way? Bahawalpur to Wazirabad Jn trains →
Common questions
How many trains run from Wazirabad Jn to Bahawalpur?
7 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Wazirabad Jn to Bahawalpur?
Sir Sayyed Express 36DN, booked at 7h 52m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Wazirabad Jn to Bahawalpur is most likely to be on time?
Jaffar Express 40DN has the best recorded punctuality of the services we hold enough history for: 25% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 50 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 6 of 7 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Wazirabad Jn to Bahawalpur?
Yes. 3 of the 7 scheduled services are booked to arrive on a later day than they depart: Awam Express 14DN, Sir Sayyed Express 36DN, Rehman Baba Express 48DN.
Do trains lose time between Wazirabad Jn and Bahawalpur?
Typically yes. Khyber Mail 2DN adds about 1h 38m to its delay over this leg, measured across 13 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Wazirabad Jn to Bahawalpur by train?
It is between 480 and 548 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 6 of the 7 services; the rest of the track on this route has not been traced yet.
Are these Wazirabad Jn to Bahawalpur timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.