210 Faiz Ahmad Faiz Passenger 210DN فیض احمد فیض پسنجر210 ڈاؤن
How late is it, usually?
median per recorded stop arrivalEvery figure here is a median, not an average: why we publish a median, not an average. What counts as on time, and why some figures here are blank, is set out in what on time means here, and every threshold behind it.
22 days of recorded arrivals.
Booked 07:30 the day it leaves; typically 24 minutes early.
An early figure means recorded arrivals were typically before the booked time — often a timetable offset, not a fast train.
The “At Lahore Jn.” tile above is the arrival at the end of the run; “Typical delay, any stop” averages every stop including the earlier ones, so it usually reads smaller. Where the time goes, below, shows every stop we have recorded.
How long does it take?
scheduled vs recordedScheduled 2h 45m — Narowal Jn to Lahore Jn.. Typically 2h 54m, 9 min longer.
What these figures cover
- Scheduled — the current timetable, Narowal Jn 04:45 to Lahore Jn. 07:30
- Typical journey — from the scheduled departure to the recorded arrival at Lahore Jn.; the median of 68 runs
- Bad day — 3h 08m at the 90th percentile: nine runs in ten come in under it
- Keyline — the scheduled time. The solid bar is the typical journey, the faint bar behind it the bad day.
- Recorded arrivals: 2 August to 21 November 2026.
- End to end. For a shorter leg, the stop times are in the timetable below.
Which day is worst?
mean minutes late per recorded arrival, 8-week windowThis is a mean over an 8-week window, not the median (typical) figure above — the two are not directly comparable.
Where the time goes
runs close to timeLeaves Narowal Jn 2 min early · reaches Lahore Jn. 24 min early — makes up +22 min.
- Narowal Jn04:45نارووال جنکشن2 min early
- Pejo Wali04:48پیجو والی+14 min
- Raya Khas05:12رایہ خاص+5 min
- Baddomalhi05:27بدوملہی+4 min
- Mehta Suja05:39مہتا سوجا+3 min
- Narang06:12نارنگ9 min early
- Kala Khatai06:29کالا کھاٹیآ29 min early
- Sriram Pura06:46سری رامپورہ+1 min
- Shahdara Bagh Jn07:12شاہدرہ باغ جنکشن+2 min
- Badami Bagh07:21بادامی باغ+4 min
- Lahore Jn.07:30لاہور جنکشن24 min early
Where it stands longest past the timetableshortest to longest recorded
- Kala Khataischeduled 2 min1–30 min
- Shahdara Bagh Jnscheduled 2 min2–31 min
- Badami Baghscheduled 1 min1–5 min
- Baddomalhischeduled 2 min1–11 min
- Mehta Sujascheduled 2 min1–8 min
What the marks mean
- Solid bar — the typical delay at that stop (median of recorded arrivals)
- Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
- No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
- — (no solid bar either) — fewer than 3 recorded runs at that stop
- A negative figure means the train typically ran early at that stop, not late
- Band — the shortest and the longest stand recorded at that stop. The train has left as early as the first figure.
- Keyline — the scheduled stop, arrival to departure on the timetable below.
- Why a train stands is not recorded — a crossing, a loco change and a red signal all look the same on the clock.
- The five stops that stand longest past the timetable, not every stop — most routes have more. A stop qualifies with 7 or more runs timed in and out, and is skipped where the timetable books no stop, books one over an hour, or where any recorded stand ran past three hours.
- Most time is lost between Kala Khatai and Sriram Pura (+30 min)
- Every stop on the current timetable is listed, in order, measured or not.
Timetable
scheduled → actual, 21 November 2026 runThe second time in a cell is what actually happened on the 21 November 2026 run.
| # | Station | Arrival | Departure |
|---|---|---|---|
| 1 | Narowal Jn | — | 04:45 |
| 2 | Pejo Wali | 04:57 → 05:03·PR | 04:48 → 05:05 |
| 3 | Raya Khas | 05:10 → 05:17·PR | 05:12 → 05:20 |
| 4 | Baddomalhi | 05:25 → 05:32·PR | 05:27 → 05:34 |
| 5 | Mehta Suja | 05:37 → 05:41·PR | 05:39 → 05:43 |
| 6 | Narang | 06:00 → 06:04·PR | 06:12 → 06:04 |
| 7 | Kala Khatai | 06:27 → 06:20·PR | 06:29 → 06:21 |
| 8 | Sriram Pura | 06:44 → 06:47·PR | 06:46 → 06:50 |
| 9 | Shahdara Bagh Jn | 07:10 → 07:14·PR | 07:12 → 07:20 |
| 10 | Badami Bagh | 07:20 → 07:26·PR | 07:21 → 07:28 |
| 11 | Lahore Jn. | 07:30 → 07:34 | 07:30 → 07:44 |
What the marks mean
- → 21:28 — actual time on the 21 November 2026 run
- ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
- +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
- Blank — not recorded
A full recorded run: 18 August 2026 →
Station by station, last 5 days
44 arrivals recordedOne mark per day, newest first.
A run’s GPS trail is decoded after the journey completes — recent days may link later.
2Pejo Walischeduled 04:57+15m3 days
Day Arrived Delay Recorded by Sat 21 Nov 05:03 +15m Pakistan Railways Fri 20 Nov not recorded — Thu 19 Nov arrived, time not recorded +16m Pakistan Railways Wed 18 Nov arrived, time not recorded +15m Pakistan Railways Tue 17 Nov not recorded — Seen on 3 of 5 days, ranging +15m to +16m. Every train at Pejo Wali →
3Raya Khasscheduled 05:10+7m3 days
Day Arrived Delay Recorded by Sat 21 Nov 05:17 +6m Pakistan Railways Fri 20 Nov not recorded — Thu 19 Nov 05:19 +7m Pakistan Railways Wed 18 Nov 05:25 +13m Pakistan Railways Tue 17 Nov not recorded — Seen on 3 of 5 days, ranging +6m to +13m. Every train at Raya Khas →
4Baddomalhischeduled 05:25+5m3 days
Day Arrived Delay Recorded by Sat 21 Nov 05:32 +5m Pakistan Railways Fri 20 Nov not recorded — Thu 19 Nov 05:30 +4m Pakistan Railways Wed 18 Nov 05:42 +15m Pakistan Railways Tue 17 Nov not recorded — Seen on 3 of 5 days, ranging +4m to +15m. Every train at Baddomalhi →
5Mehta Sujascheduled 05:37+7m5 days
Day Arrived Delay Recorded by Sat 21 Nov 05:41 +3m Pakistan Railways Fri 20 Nov arrived, time not recorded +7m Pakistan Railways Thu 19 Nov 05:40 +2m Pakistan Railways Wed 18 Nov 05:54 +15m Pakistan Railways Tue 17 Nov arrived, time not recorded +7m Pakistan Railways Seen on 5 of 5 days, ranging +2m to +15m. Every train at Mehta Suja →
6Narangscheduled 06:007m early5 days
Day Arrived Delay Recorded by Sat 21 Nov 06:04 7m early Pakistan Railways Fri 20 Nov 06:06 6m early Pakistan Railways Thu 19 Nov 06:04 7m early Pakistan Railways Wed 18 Nov 06:15 +4m Pakistan Railways Tue 17 Nov 06:04 7m early Pakistan Railways Seen on 5 of 5 days, ranging 7m early to +4m. Every train at Narang →
7Kala Khataischeduled 06:278m early5 days
Day Arrived Delay Recorded by Sat 21 Nov 06:20 8m early Pakistan Railways Fri 20 Nov 06:20 7m early Pakistan Railways Thu 19 Nov 06:19 9m early Pakistan Railways Wed 18 Nov 06:46 +17m Pakistan Railways Tue 17 Nov 06:16 10m early Pakistan Railways Seen on 5 of 5 days, ranging 10m early to +17m. Every train at Kala Khatai →
8Sriram Purascheduled 06:44+5m5 days
Day Arrived Delay Recorded by Sat 21 Nov 06:47 +2m Pakistan Railways Fri 20 Nov 06:54 +8m Pakistan Railways Thu 19 Nov 06:48 +2m Pakistan Railways Wed 18 Nov 07:07 +21m Pakistan Railways Tue 17 Nov 06:50 +5m Pakistan Railways Seen on 5 of 5 days, ranging +2m to +21m. Every train at Sriram Pura →
9Shahdara Bagh Jnscheduled 07:10+7m5 days
Day Arrived Delay Recorded by Sat 21 Nov 07:14 +3m Pakistan Railways Fri 20 Nov 07:20 +10m Pakistan Railways Thu 19 Nov 07:17 +6m Pakistan Railways Wed 18 Nov 07:36 +24m Pakistan Railways Tue 17 Nov 07:18 +7m Pakistan Railways Seen on 5 of 5 days, ranging +3m to +24m. Every train at Shahdara Bagh Jn →
10Badami Baghscheduled 07:20+8m5 days
Day Arrived Delay Recorded by Sat 21 Nov 07:26 +5m Pakistan Railways Fri 20 Nov 07:38 +18m Pakistan Railways Thu 19 Nov 07:28 +7m Pakistan Railways Wed 18 Nov 07:46 +25m Pakistan Railways Tue 17 Nov 07:28 +8m Pakistan Railways Seen on 5 of 5 days, ranging +5m to +25m. Every train at Badami Bagh →
11Lahore Jn.scheduled 07:30+12m5 days
Day Arrived Delay Recorded by Sat 21 Nov 07:34 +5m Train GPS Fri 20 Nov 07:49 +20m Pakistan Railways (journey record) Thu 19 Nov 07:33 +3m Pakistan Railways (journey record) Wed 18 Nov 07:53 +24m Pakistan Railways (journey record) Tue 17 Nov 07:42 +12m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +3m to +24m. Every train at Lahore Jn. →
What the marks mean
- Tap a station — each day’s arrival, delay and recorder
- Green — within 15 minutes of the scheduled time
- Amber — 16 to 45 minutes late
- Red — over 45 minutes late
- Hollow — not recorded that day
- Grey — arrived, no delay figure
- Dash (—) — no delay figure for this stop yet
- Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
- The starting station is not listed — a train does not arrive where it begins.
Common questions
Is Faiz Ahmad Faiz Passenger 210DN usually late?
Typically 24 minutes early arriving at Lahore Jn., measured across 68 recorded arrivals (2 Aug – 21 Nov 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.
How late is Faiz Ahmad Faiz Passenger 210DN on a bad day?
On the worst one run in ten, 6 minutes late into Lahore Jn., against a typical 24 minutes early. Both come from the same 68 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.
What time does Faiz Ahmad Faiz Passenger 210DN leave Narowal Jn?
04:45, on the current published timetable. It is booked into Lahore Jn. at 07:30, the day it leaves. Those are booked times. The delay figures on this page are what we recorded against them.
How long does Faiz Ahmad Faiz Passenger 210DN take from Narowal Jn to Lahore Jn.?
2h 45m on the timetable. In practice a typical run has taken 2h 54m, measured from recorded arrivals at Lahore Jn..
How many stops does Faiz Ahmad Faiz Passenger 210DN make?
11 on the current published timetable, from Narowal Jn to Lahore Jn.. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.