127 Mehr Express 127UP مھر ایکسپریس 127اپ
How late is it, usually?
median per recorded stop arrivalEvery figure here is a median, not an average: why we publish a median, not an average. What counts as on time, and why some figures here are blank, is set out in what on time means here, and every threshold behind it.
22 days of recorded arrivals.
Over 38 recorded arrivals (5 Aug – 20 Nov 2026), Mehr Express 127UP has typically reached Rawalpindi around 08:33 the day after it leaves — on the worst one run in ten, past 09:05 the day after it leaves, at Rawalpindi itself.
The “At Rawalpindi” tile above is the arrival at the end of the run; “Typical delay, any stop” averages every stop including the earlier ones, so it usually reads smaller. Where the time goes, below, shows every stop we have recorded.
How long does it take?
scheduled vs recordedScheduled 15h — Multan Cantt to Rawalpindi. Typically 16h 18m, 1h 18m longer.
Timetable: out 16:15, in at 07:15 the next day — one night on board.
What these figures cover
- Scheduled — the current timetable, Multan Cantt 16:15 to Rawalpindi 07:15 the next day
- Typical journey — from the scheduled departure to the recorded arrival at Rawalpindi; the median of 38 runs
- Bad day — 16h 50m at the 90th percentile: nine runs in ten come in under it
- Keyline — the scheduled time. The solid bar is the typical journey, the faint bar behind it the bad day.
- Recorded arrivals: 5 August to 20 November 2026.
- End to end. For a shorter leg, the stop times are in the timetable below.
Which day is worst?
mean minutes late per recorded arrival, 8-week windowThis is a mean over an 8-week window, not the median (typical) figure above — the two are not directly comparable.
Where the time goes
most of it lost after Multan CanttLeaves Multan Cantt 44 min early · reaches Rawalpindi +1h 18m — +2h 02m lost along the way.
- Multan Cantt16:15ملتان کینٹ44 min early
- Sher Shah Jn16:34شیرشاہ جنکشن+7 min
- Muzaffargarh16:52مظفر گڑھ+18 min
- Budh17:10بدہ+19 min
- Mehmood Kot17:26محمود کوٹ+21 min
- Gurmani17:37گرمانی+24 min
- Sanawan17:53سنا وان+22 min
- Kot Addu18:25کوٹ ادو+18 min
- Dera Dinpanah18:38ڈیرہ دین پناہ+22 min
- Ahsan Pur Ahp18:51احسن پور+23 min
- Kot Sultan19:09کوٹ سلطان+22 min
- Jaman Shah19:24جمن شاہ+23 min
- Layyah19:40لیّہ+26 min
- Karor Lal Esan20:08کرور لعل عیسن+38 min
- Behal20:30بیہل+50 min
- Bhakkar21:05بھکر+53 min
- Darya Khan21:36دریا خان+54 min
- Kalur Kot22:59کلور کوٹ+46 min
- Piplan23:36پپلاں+48 min
- Alluwali23:57علو والی+56 min
- Kundian Jn00:45کندیاں+40 min
- Mian Wali01:13میانوالی+58 min
- Pai Khel01:36پائ خیل+1h 07m
- Daud Khel Jn01:52داؤد خیل+1h 19m
- Mukhad Road02:52مکھڈ روڈ+1h 13m
- Injra03:14انجرا+1h 16m
- Chhab03:37چھب+1h 16m
- Jhammat03:55جھمٹ+1h 14m
- Jand Jn04:32جنڈ جنکشن+1h 13m
- Nammal04:54نمل+1h 09m
- Domel05:10ڈومیل+1h 11m
- Basal Jn05:23بسال جنکشن+1h 06m
- Basal Sharif05:30بسال شریف+1h 07m
- Fateh Jang06:11فتح جنگ+1h 09m
- Tarnoul06:39ترنول+1h 21m
- Golra Sharif06:50گولڑہ شریف+1h 15m
- Rawalpindi07:15راولپِنڈى+1h 18m
Where it stands longest past the timetableshortest to longest recorded
- Layyahscheduled 5 min3 min–1h 03m
- Kot Adduscheduled 10 min4–16 min
- Kundian Jnscheduled 20 min6 min–1h 09m
- Jand Jnscheduled 2 min1–9 min
- Bhakkarscheduled 5 min3–13 min
What the marks mean
- Solid bar — the typical delay at that stop (median of recorded arrivals)
- Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
- No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
- — (no solid bar either) — fewer than 3 recorded runs at that stop
- A negative figure means the train typically ran early at that stop, not late
- Band — the shortest and the longest stand recorded at that stop. The train has left as early as the first figure.
- Keyline — the scheduled stop, arrival to departure on the timetable below.
- Why a train stands is not recorded — a crossing, a loco change and a red signal all look the same on the clock.
- The five stops that stand longest past the timetable, not every stop — most routes have more. A stop qualifies with 7 or more runs timed in and out, and is skipped where the timetable books no stop, books one over an hour, or where any recorded stand ran past three hours.
- Most time is lost between Multan Cantt and Sher Shah Jn (+51 min)
- Every stop on the current timetable is listed, in order, measured or not.
Timetable
scheduled → actual, 20 November 2026 runThe second time in a cell is what actually happened on the 20 November 2026 run.
| # | Station | Arrival | Departure |
|---|---|---|---|
| 1 | Multan Cantt | — | 16:15 |
| 2 | Sher Shah Jn | 16:32 → 17:03·PR | 16:34 → 17:06 |
| 3 | Muzaffargarh | 16:50 → 17:32·PR | 16:52 → 17:37 |
| 4 | Budh | 17:09 | 17:10 |
| 5 | Mehmood Kot | 17:24 | 17:26 |
| 6 | Gurmani | 17:36 → 18:24·PR | 17:37 → 18:27 |
| 7 | Sanawan | 17:51 → 18:40·PR | 17:53 → 18:43 |
| 8 | Kot Addu | 18:15 | 18:25 |
| 9 | Dera Dinpanah | 18:36 → 19:32·PR | 18:38 → 19:36 |
| 10 | Ahsan Pur Ahp | 18:49 → 19:46·PR | 18:51 → 19:49 |
| 11 | Kot Sultan | 19:07 → 20:03·PR | 19:09 → 20:16 |
| 12 | Jaman Shah | 19:22 → 20:32·PR | 19:24 |
| 13 | Layyah | 19:35 → 20:47·PR | 19:40 → 20:49 |
| 14 | Karor Lal Esan | 20:06 → 21:20·PR | 20:08 → 21:25 |
| 15 | Behal | 20:28 → 21:56·PR | 20:30 |
| 16 | Bhakkar | 21:00 → 22:31·PR | 21:05 → 22:38 |
| 17 | Darya Khan | 21:34 → 23:01·PR | 21:36 → 23:07 |
| 18 | Kalur Kot | 22:57 | 22:59 |
| 19 | Piplan | 23:34 → 00:50·PR | 23:36 → 00:53 |
| 20 | Alluwali | 23:55 → 01:11·PR | 23:57 → 01:12 |
| 21 | Kundian Jn | 00:25 +1d → 01:36·PR | 00:45 +1d → 01:56 |
| 22 | Mian Wali | 01:05 +1d → 02:26·PR | 01:13 +1d → 02:30 |
| 23 | Pai Khel | 01:34 +1d → 03:05·PR | 01:36 +1d → 03:07 |
| 24 | Daud Khel Jn | 01:50 +1d → 03:33·PR | 01:52 +1d |
| 25 | Mukhad Road | 02:50 +1d → 04:30·PR | 02:52 +1d |
| 26 | Injra | 03:12 +1d | 03:14 +1d |
| 27 | Chhab | 03:35 +1d → 05:17·PR | 03:37 +1d → 05:19 |
| 28 | Jhammat | 03:53 +1d → 05:31·PR | 03:55 +1d → 05:33 |
| 29 | Jand Jn | 04:30 +1d → 06:05·PR | 04:32 +1d → 06:10 |
| 30 | Nammal | 04:53 +1d → 06:24·PR | 04:54 +1d → 06:28 |
| 31 | Domel | 05:09 +1d → 06:38·PR | 05:10 +1d → 06:41 |
| 32 | Basal Jn | 05:21 +1d → 06:48·PR | 05:23 +1d → 06:51 |
| 33 | Basal Sharif | 05:29 +1d → 06:57·PR | 05:30 +1d |
| 34 | Fateh Jang | 06:09 +1d → 07:41·PR | 06:11 +1d → 07:43 |
| 35 | Tarnoul | 06:37 +1d → 08:18·PR | 06:39 +1d |
| 36 | Golra Sharif | 06:47 +1d → 08:24·PR | 06:50 +1d → 08:33 |
| 37 | Rawalpindi | 07:15 +1d → 08:58 | — +1d → 08:58 |
What the marks mean
- → 21:28 — actual time on the 20 November 2026 run
- ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
- +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
- Blank — not recorded
A full recorded run: 23 August 2026 →
Station by station, last 5 days
171 arrivals recordedOne mark per day, newest first.
A run’s GPS trail is decoded after the journey completes — recent days may link later.
2Sher Shah Jnscheduled 16:32+1m4 days
Day Arrived Delay Recorded by Fri 20 Nov 17:03 +29m Pakistan Railways Thu 19 Nov 16:34 on time Pakistan Railways Wed 18 Nov 16:35 +1m Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 16:33 on time Pakistan Railways Seen on 4 of 5 days, ranging on time to +29m. Every train at Sher Shah Jn →
3Muzaffargarhscheduled 16:50+11m4 days
Day Arrived Delay Recorded by Fri 20 Nov 17:32 +41m Pakistan Railways Thu 19 Nov 17:01 +10m Pakistan Railways Wed 18 Nov 17:02 +11m Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 17:01 +10m Pakistan Railways Seen on 4 of 5 days, ranging +10m to +41m. Every train at Muzaffargarh →
4Budhscheduled 17:09+14m3 days
Day Arrived Delay Recorded by Fri 20 Nov not recorded — Thu 19 Nov 17:20 +11m Pakistan Railways Wed 18 Nov 17:23 +14m Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 17:23 +14m Pakistan Railways Seen on 3 of 5 days, ranging +11m to +14m. Every train at Budh →
5Mehmood Kotscheduled 17:24+16m4 days
Day Arrived Delay Recorded by Fri 20 Nov arrived, time not recorded +44m Pakistan Railways Thu 19 Nov 17:38 +12m Pakistan Railways Wed 18 Nov 17:40 +14m Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 17:43 +17m Pakistan Railways Seen on 4 of 5 days, ranging +12m to +44m. Every train at Mehmood Kot →
6Gurmanischeduled 17:36+20m4 days
Day Arrived Delay Recorded by Fri 20 Nov 18:24 +48m Pakistan Railways Thu 19 Nov 17:54 +17m Pakistan Railways Wed 18 Nov 17:54 +18m Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 17:57 +21m Pakistan Railways Seen on 4 of 5 days, ranging +17m to +48m. Every train at Gurmani →
7Sanawanscheduled 17:51+18m4 days
Day Arrived Delay Recorded by Fri 20 Nov 18:40 +47m Pakistan Railways Thu 19 Nov 18:09 +16m Pakistan Railways Wed 18 Nov 18:08 +17m Pakistan Railways Tue 17 Nov not recorded — Mon 16 Nov 18:11 +18m Pakistan Railways Seen on 4 of 5 days, ranging +16m to +47m. Every train at Sanawan →
8Kot Adduscheduled 18:15+16m5 days
Day Arrived Delay Recorded by Fri 20 Nov arrived, time not recorded +45m Pakistan Railways Thu 19 Nov 18:29 +4m Pakistan Railways Wed 18 Nov arrived, time not recorded +16m Pakistan Railways Tue 17 Nov arrived, time not recorded +12m Pakistan Railways Mon 16 Nov arrived, time not recorded +20m Pakistan Railways Seen on 5 of 5 days, ranging +4m to +45m. Every train at Kot Addu →
9Dera Dinpanahscheduled 18:36+18m5 days
Day Arrived Delay Recorded by Fri 20 Nov 19:32 +55m Pakistan Railways Thu 19 Nov 18:56 +18m Pakistan Railways Wed 18 Nov 18:53 +16m Pakistan Railways Tue 17 Nov 18:58 +20m Pakistan Railways Mon 16 Nov 18:55 +17m Pakistan Railways Seen on 5 of 5 days, ranging +16m to +55m. Every train at Dera Dinpanah →
10Ahsan Pur Ahpscheduled 18:49+19m5 days
Day Arrived Delay Recorded by Fri 20 Nov 19:46 +56m Pakistan Railways Thu 19 Nov 19:09 +19m Pakistan Railways Wed 18 Nov 19:06 +15m Pakistan Railways Tue 17 Nov 19:11 +20m Pakistan Railways Mon 16 Nov 19:08 +17m Pakistan Railways Seen on 5 of 5 days, ranging +15m to +56m. Every train at Ahsan Pur Ahp →
11Kot Sultanscheduled 19:07+18m5 days
Day Arrived Delay Recorded by Fri 20 Nov 20:03 +55m Pakistan Railways Thu 19 Nov 19:27 +18m Pakistan Railways Wed 18 Nov 19:20 +13m Pakistan Railways Tue 17 Nov 19:27 +19m Pakistan Railways Mon 16 Nov 19:26 +18m Pakistan Railways Seen on 5 of 5 days, ranging +13m to +55m. Every train at Kot Sultan →
12Jaman Shahscheduled 19:22+21m5 days
Day Arrived Delay Recorded by Fri 20 Nov 20:32 +1h08 Pakistan Railways Thu 19 Nov 19:44 +21m Pakistan Railways Wed 18 Nov 19:38 +14m Pakistan Railways Tue 17 Nov 19:44 +23m Pakistan Railways Mon 16 Nov 19:44 +21m Pakistan Railways Seen on 5 of 5 days, ranging +14m to +1h08. Every train at Jaman Shah →
13Layyahscheduled 19:35+20m5 days
Day Arrived Delay Recorded by Fri 20 Nov 20:47 +1h07 Pakistan Railways Thu 19 Nov 20:00 +20m Pakistan Railways Wed 18 Nov 19:56 +16m Pakistan Railways Tue 17 Nov 20:00 +21m Pakistan Railways Mon 16 Nov 19:59 +20m Pakistan Railways Seen on 5 of 5 days, ranging +16m to +1h07. Every train at Layyah →
14Karor Lal Esanscheduled 20:06+30m5 days
Day Arrived Delay Recorded by Fri 20 Nov 21:20 +1h14 Pakistan Railways Thu 19 Nov 20:37 +30m Pakistan Railways Wed 18 Nov 20:32 +25m Pakistan Railways Tue 17 Nov 20:37 +30m Pakistan Railways Mon 16 Nov 20:42 +34m Pakistan Railways Seen on 5 of 5 days, ranging +25m to +1h14. Every train at Karor Lal Esan →
15Behalscheduled 20:28+42m5 days
Day Arrived Delay Recorded by Fri 20 Nov 21:56 +1h27 Pakistan Railways Thu 19 Nov 21:12 +42m Pakistan Railways Wed 18 Nov 21:10 +41m Pakistan Railways Tue 17 Nov 21:11 +42m Pakistan Railways Mon 16 Nov 21:18 +48m Pakistan Railways Seen on 5 of 5 days, ranging +41m to +1h27. Every train at Behal →
16Bhakkarscheduled 21:00+41m5 days
Day Arrived Delay Recorded by Fri 20 Nov 22:31 +1h26 Pakistan Railways Thu 19 Nov 21:43 +39m Pakistan Railways Wed 18 Nov 21:45 +41m Pakistan Railways Tue 17 Nov 21:44 +40m Pakistan Railways Mon 16 Nov 21:50 +46m Pakistan Railways Seen on 5 of 5 days, ranging +39m to +1h26. Every train at Bhakkar →
17Darya Khanscheduled 21:34+37m5 days
Day Arrived Delay Recorded by Fri 20 Nov 23:01 +1h25 Pakistan Railways Thu 19 Nov 22:13 +37m Pakistan Railways Wed 18 Nov 22:12 +37m Pakistan Railways Tue 17 Nov 22:12 +37m Pakistan Railways Mon 16 Nov 22:21 +45m Pakistan Railways Seen on 5 of 5 days, ranging +37m to +1h25. Every train at Darya Khan →
18Kalur Kotscheduled 22:57+34m5 days
Day Arrived Delay Recorded by Fri 20 Nov arrived, time not recorded +1h18 Pakistan Railways Thu 19 Nov 23:32 +34m Pakistan Railways Wed 18 Nov 23:29 +30m Pakistan Railways Tue 17 Nov 23:27 +28m Pakistan Railways Mon 16 Nov 23:43 +44m Pakistan Railways Seen on 5 of 5 days, ranging +28m to +1h18. Every train at Kalur Kot →
19Piplanscheduled 23:34+40m5 days
Day Arrived Delay Recorded by Fri 20 Nov 00:50 +1h15 Pakistan Railways Thu 19 Nov 00:15 +40m Pakistan Railways Wed 18 Nov 00:08 +32m Pakistan Railways Tue 17 Nov 00:04 +28m Pakistan Railways Mon 16 Nov 00:19 +46m Pakistan Railways Seen on 5 of 5 days, ranging +28m to +1h15. Every train at Piplan →
20Alluwalischeduled 23:55+43m5 days
Day Arrived Delay Recorded by Fri 20 Nov 01:11 +1h15 Pakistan Railways Thu 19 Nov 00:40 +43m Pakistan Railways Wed 18 Nov 00:34 +38m Pakistan Railways Tue 17 Nov 00:20 +25m Pakistan Railways Mon 16 Nov 00:57 +1h Pakistan Railways Seen on 5 of 5 days, ranging +25m to +1h15. Every train at Alluwali →
21Kundian Jnscheduled 00:25+22m5 days
Day Arrived Delay Recorded by Fri 20 Nov 01:36 +52m Pakistan Railways Thu 19 Nov 01:07 +22m Pakistan Railways Wed 18 Nov 00:57 +13m Pakistan Railways Tue 17 Nov 00:46 +1m Pakistan Railways Mon 16 Nov 01:20 +55m Pakistan Railways Seen on 5 of 5 days, ranging +1m to +55m. Every train at Kundian Jn →
22Mian Walischeduled 01:05+49m5 days
Day Arrived Delay Recorded by Fri 20 Nov 02:26 +1h14 Pakistan Railways Thu 19 Nov 02:02 +49m Pakistan Railways Wed 18 Nov 01:43 +31m Pakistan Railways Tue 17 Nov 01:40 +27m Pakistan Railways Mon 16 Nov arrived, time not recorded +1h13 Pakistan Railways Seen on 5 of 5 days, ranging +27m to +1h14. Every train at Mian Wali →
23Pai Khelscheduled 01:34+1h045 days
Day Arrived Delay Recorded by Fri 20 Nov 03:05 +1h30 Pakistan Railways Thu 19 Nov 02:40 +1h04 Pakistan Railways Wed 18 Nov 02:17 +41m Pakistan Railways Tue 17 Nov 02:15 +40m Pakistan Railways Mon 16 Nov 02:47 +1h11 Pakistan Railways Seen on 5 of 5 days, ranging +40m to +1h30. Every train at Pai Khel →
24Daud Khel Jnscheduled 01:50+1h185 days
Day Arrived Delay Recorded by Fri 20 Nov 03:33 +1h44 Pakistan Railways Thu 19 Nov 03:08 +1h18 Pakistan Railways Wed 18 Nov 02:42 +50m Pakistan Railways Tue 17 Nov 02:46 +54m Pakistan Railways Mon 16 Nov 03:13 +1h21 Pakistan Railways Seen on 5 of 5 days, ranging +50m to +1h44. Every train at Daud Khel Jn →
25Mukhad Roadscheduled 02:50+1h125 days
Day Arrived Delay Recorded by Fri 20 Nov 04:30 +1h38 Pakistan Railways Thu 19 Nov 04:08 +1h18 Pakistan Railways Wed 18 Nov 03:27 +36m Pakistan Railways Tue 17 Nov 03:41 +50m Pakistan Railways Mon 16 Nov 04:03 +1h12 Pakistan Railways Seen on 5 of 5 days, ranging +36m to +1h38. Every train at Mukhad Road →
26Injrascheduled 03:12+1h135 days
Day Arrived Delay Recorded by Fri 20 Nov arrived, time not recorded +1h39 Pakistan Railways Thu 19 Nov arrived, time not recorded +1h20 Pakistan Railways Wed 18 Nov arrived, time not recorded +38m Pakistan Railways Tue 17 Nov 04:07 +53m Pakistan Railways Mon 16 Nov 04:27 +1h13 Pakistan Railways Seen on 5 of 5 days, ranging +38m to +1h39. Every train at Injra →
27Chhabscheduled 03:35+1h155 days
Day Arrived Delay Recorded by Fri 20 Nov 05:17 +1h41 Pakistan Railways Thu 19 Nov 04:57 +1h20 Pakistan Railways Wed 18 Nov 04:13 +37m Pakistan Railways Tue 17 Nov 04:32 +55m Pakistan Railways Mon 16 Nov 04:51 +1h15 Pakistan Railways Seen on 5 of 5 days, ranging +37m to +1h41. Every train at Chhab →
28Jhammatscheduled 03:53+1h125 days
Day Arrived Delay Recorded by Fri 20 Nov 05:31 +1h37 Pakistan Railways Thu 19 Nov 05:14 +1h19 Pakistan Railways Wed 18 Nov 04:28 +34m Pakistan Railways Tue 17 Nov 04:48 +53m Pakistan Railways Mon 16 Nov 05:06 +1h12 Pakistan Railways Seen on 5 of 5 days, ranging +34m to +1h37. Every train at Jhammat →
29Jand Jnscheduled 04:30+1h095 days
Day Arrived Delay Recorded by Fri 20 Nov 06:05 +1h34 Pakistan Railways Thu 19 Nov 05:49 +1h18 Pakistan Railways Wed 18 Nov 05:05 +33m Pakistan Railways Tue 17 Nov 05:20 +50m Pakistan Railways Mon 16 Nov 05:40 +1h09 Pakistan Railways Seen on 5 of 5 days, ranging +33m to +1h34. Every train at Jand Jn →
30Nammalscheduled 04:53+1h065 days
Day Arrived Delay Recorded by Fri 20 Nov 06:24 +1h31 Pakistan Railways Thu 19 Nov 06:07 +1h14 Pakistan Railways Wed 18 Nov 05:24 +30m Pakistan Railways Tue 17 Nov 05:43 +50m Pakistan Railways Mon 16 Nov 06:00 +1h06 Pakistan Railways Seen on 5 of 5 days, ranging +30m to +1h31. Every train at Nammal →
31Domelscheduled 05:09+1h045 days
Day Arrived Delay Recorded by Fri 20 Nov 06:38 +1h29 Pakistan Railways Thu 19 Nov 06:20 +1h11 Pakistan Railways Wed 18 Nov 05:43 +32m Pakistan Railways Tue 17 Nov 05:58 +49m Pakistan Railways Mon 16 Nov 06:14 +1h04 Pakistan Railways Seen on 5 of 5 days, ranging +32m to +1h29. Every train at Domel →
32Basal Jnscheduled 05:21+52m4 days
Day Arrived Delay Recorded by Fri 20 Nov 06:48 +1h26 Pakistan Railways Thu 19 Nov not recorded — Wed 18 Nov 05:52 +29m Pakistan Railways Tue 17 Nov 06:07 +45m Pakistan Railways Mon 16 Nov 06:20 +59m Pakistan Railways Seen on 4 of 5 days, ranging +29m to +1h26. Every train at Basal Jn →
33Basal Sharifscheduled 05:29+59m5 days
Day Arrived Delay Recorded by Fri 20 Nov 06:57 +1h27 Pakistan Railways Thu 19 Nov arrived, time not recorded +1h14 Pakistan Railways Wed 18 Nov 05:55 +26m Pakistan Railways Tue 17 Nov 06:15 +45m Pakistan Railways Mon 16 Nov 06:28 +59m Pakistan Railways Seen on 5 of 5 days, ranging +26m to +1h27. Every train at Basal Sharif →
34Fateh Jangscheduled 06:09+1h025 days
Day Arrived Delay Recorded by Fri 20 Nov 07:41 +1h30 Pakistan Railways Thu 19 Nov 07:26 +1h15 Pakistan Railways Wed 18 Nov 06:43 +33m Pakistan Railways Tue 17 Nov 06:59 +49m Pakistan Railways Mon 16 Nov 07:13 +1h02 Pakistan Railways Seen on 5 of 5 days, ranging +33m to +1h30. Every train at Fateh Jang →
35Tarnoulscheduled 06:37+1h145 days
Day Arrived Delay Recorded by Fri 20 Nov 08:18 +1h40 Pakistan Railways Thu 19 Nov 08:07 +1h28 Pakistan Railways Wed 18 Nov 07:20 +43m Pakistan Railways Tue 17 Nov 07:42 +1h03 Pakistan Railways Mon 16 Nov 07:53 +1h14 Pakistan Railways Seen on 5 of 5 days, ranging +43m to +1h40. Every train at Tarnoul →
36Golra Sharifscheduled 06:47+1h075 days
Day Arrived Delay Recorded by Fri 20 Nov 08:24 +1h33 Pakistan Railways Thu 19 Nov 08:12 +1h21 Pakistan Railways Wed 18 Nov 07:28 +38m Pakistan Railways Tue 17 Nov 07:48 +57m Pakistan Railways Mon 16 Nov 07:58 +1h07 Pakistan Railways Seen on 5 of 5 days, ranging +38m to +1h33. Every train at Golra Sharif →
37Rawalpindischeduled 07:15+1h184 days
Day Arrived Delay Recorded by Fri 20 Nov 08:58 +1h44 Train GPS Thu 19 Nov 08:44 +1h30 Train GPS Wed 18 Nov 08:03 +48m Pakistan Railways (journey record) Tue 17 Nov 08:20 +1h05 Train GPS Mon 16 Nov not recorded — Seen on 4 of 5 days, ranging +48m to +1h44. Every train at Rawalpindi →
What the marks mean
- Tap a station — each day’s arrival, delay and recorder
- Green — within 15 minutes of the scheduled time
- Amber — 16 to 45 minutes late
- Red — over 45 minutes late
- Hollow — not recorded that day
- Grey — arrived, no delay figure
- Dash (—) — no delay figure for this stop yet
- Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
- The starting station is not listed — a train does not arrive where it begins.
Common questions
Is Mehr Express 127UP usually late?
Typically 78 minutes late arriving at Rawalpindi, measured across 38 recorded arrivals (5 Aug – 20 Nov 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.
How late is Mehr Express 127UP on a bad day?
On the worst one run in ten, 110 minutes late into Rawalpindi, against a typical 78 minutes late. Both come from the same 38 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.
What time does Mehr Express 127UP leave Multan Cantt?
16:15, on the current published timetable. It is booked into Rawalpindi at 07:15, the day after it leaves. Those are booked times. The delay figures on this page are what we recorded against them.
How long does Mehr Express 127UP take from Multan Cantt to Rawalpindi?
15h on the timetable. In practice a typical run has taken 16h 18m, measured from recorded arrivals at Rawalpindi.
How many stops does Mehr Express 127UP make?
37 on the current published timetable, from Multan Cantt to Rawalpindi. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.