Running 3h 25m late — heading for Gujar Khan, due 18:20 (operator's estimate), 63 km/h. Last crossed Jhelum.
How late is it, usually?
median per recorded stop arrivalEvery figure here is a median, not an average: why we publish a median, not an average. What counts as on time, and why some figures here are blank, is set out in what on time means here, and every threshold behind it.
11 days of recorded arrivals.
Over 33 recorded arrivals (30 Jul – 7 Oct 2026), Jaffar Express 39UP has typically reached Peshawar Cantt around 23:34 the day after it leaves — on the worst one run in ten, past 02:04 two days after it leaves, at Peshawar Cantt itself. Today's run: track it live →
The “At Peshawar Cantt” tile above is the arrival at the end of the run; “Typical delay, any stop” averages every stop including the earlier ones, so it usually reads smaller. Where the time goes, below, shows every stop we have recorded.
How long does it take?
scheduled vs recordedScheduled 25h 45m — Jacobabad Jn to Peshawar Cantt. Typically 29h 44m, 3h 59m longer.
Timetable: out 17:50, in at 19:35 the next day — one night on board.
What these figures cover
- Scheduled — the current timetable, Jacobabad Jn 17:50 to Peshawar Cantt 19:35 the next day
- Typical journey — from the scheduled departure to the recorded arrival at Peshawar Cantt; the median of 33 runs
- Bad day — 32h 14m at the 90th percentile: nine runs in ten come in under it
- Keyline — the scheduled time. The solid bar is the typical journey, the faint bar behind it the bad day.
- Recorded arrivals: 30 July to 7 October 2026.
- End to end. For a shorter leg, the stop times are in the timetable below.
Which day is worst?
mean minutes late per recorded arrival, 8-week windowThis is a mean over an 8-week window, not the median (typical) figure above — the two are not directly comparable.
Where the time goes
late at Sukkur, and later afterLeaves Sukkur +1h 26m · reaches Peshawar Cantt +3h 59m — +2h 33m lost along the way.
- Jacobabad Jn17:50جیکب آباد—
- Shikarpur19:05شکارپور—
- Sukkur20:05سکھر+1h 26m
- Rohri Jn.20:50روہڑی جنکشن+1h 08m
- Pano Akil21:35پنو عاقل+1h 26m
- Ghotki22:00گھوٹکی+1h 32m
- Sadiqabad23:18صادق آباد+1h 37m
- Rahim Yar Khan23:52رحیم یار خان+1h 36m
- Khanpur Jn.00:55خانپور جنکشن+1h 22m
- Samasata Jn02:18سمہ سٹہ جنکشن+1h 22m
- Bahawalpur02:33بہاولپور+1h 24m
- Lodhran Jn02:56لودهراں جنکشن+1h 22m
- Multan Cantt04:20ملتان کینٹ+1h 18m
- Khanewal Jn05:05خانیوال+1h 31m
- Mian Channu05:40مِياں چنُّوں+1h 42m
- Chichawatni06:09چِچہ وطنى+1h 42m
- Sahiwal06:50ساہِيوال+1h 36m
- Okara07:20اوکاڑا+1h 39m
- Pattoki07:54پتّوكى+1h 55m
- Raiwind Jn.08:30راۓوِنڈ جنکشن+2h 02m
- Kot Lakhpat09:00کوٹ لکھپت+2h 09m
- Lahore Cantt09:22لاہور کینٹ+2h 03m
- Lahore Jn.10:15لاہور جنکشن+1h 49m
- Gujranwala11:26گوجرانوالا+2h 27m
- Wazirabad Jn12:07وزیرآباد جنکشن+2h 22m
- Gujrat12:27گُجرات+2h 19m
- Lala Musa Jn.12:47لالہ مُوسٰی جنکشن+2h 22m
- Kharian Cantt13:03کھاریاں کینٹ+2h 28m
- Jhelum13:28جہلم+2h 37m
- Gujar Khan14:57گُوجر خان+2h 50m
- Rawalpindi16:25راولپِنڈى+3h 08m
- Attock City Jn17:51اٹک سٹی جنکشن+3h 32m
- Jahangira Road18:29جھانگیرہ+3h 33m
- Nowshera Jn18:47نوشہرہ جنکشن+3h 40m
- Peshawar City19:28پشاور سٹی+4h
- Peshawar Cantt19:35پشاور کينٹ+3h 59m
Where it stands longest past the timetableshortest to longest recorded
- Lahore Jn.scheduled 35 min44 min–1h 28m
- Multan Canttscheduled 20 min20–55 min
- Pano Akilscheduled 5 min6–16 min
- Lahore Canttscheduled 2 min1–22 min
- Rohri Jn.scheduled 25 min20 min–1h
What the marks mean
- Solid bar — the typical delay at that stop (median of recorded arrivals)
- Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
- No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
- — (no solid bar either) — fewer than 3 recorded runs at that stop
- A negative figure means the train typically ran early at that stop, not late
- Band — the shortest and the longest stand recorded at that stop. The train has left as early as the first figure.
- Keyline — the scheduled stop, arrival to departure on the timetable below.
- Why a train stands is not recorded — a crossing, a loco change and a red signal all look the same on the clock.
- The five stops that stand longest past the timetable, not every stop — most routes have more. A stop qualifies with 7 or more runs timed in and out, and is skipped where the timetable books no stop, books one over an hour, or where any recorded stand ran past three hours.
- Most time is lost between Lahore Jn. and Gujranwala (+38 min)
- Every stop on the current timetable is listed, in order, measured or not.
Timetable
scheduled → actual, 8 October 2026 runThe second time in a cell is what actually happened on the 8 October 2026 run.
| # | Station | Arrival | Departure |
|---|---|---|---|
| 1 | Jacobabad Jn | — | 17:50 |
| 2 | Shikarpur | 19:00 | 19:05 |
| 3 | Sukkur | 20:00 | 20:05 |
| 4 | Rohri Jn. | 20:25 → 22:14·PR | 20:50 → 22:14 |
| 5 | Pano Akil | 21:30 → 23:49·PR | 21:35 → 23:59 |
| 6 | Ghotki | 21:58 → 00:26·PR | 22:00 → 00:31 |
| 7 | Sadiqabad | 23:16 → 01:44·PR | 23:18 → 01:47 |
| 8 | Rahim Yar Khan | 23:50 → 02:12·PR | 23:52 → 02:16 |
| 9 | Khanpur Jn. | 00:53 +1d → 03:01·PR | 00:55 +1d → 03:12 |
| 10 | Samasata Jn | 02:16 +1d → 04:55·PR | 02:18 +1d → 05:01 |
| 11 | Bahawalpur | 02:30 +1d → 05:15·PR | 02:33 +1d → 05:19 |
| 12 | Lodhran Jn | 02:54 +1d → 05:35·PR | 02:56 +1d → 05:39 |
| 13 | Multan Cantt | 04:00 +1d → 06:46·PR | 04:20 +1d → 07:04 |
| 14 | Khanewal Jn | 05:00 +1d → 07:42·PR | 05:05 +1d → 07:46 |
| 15 | Mian Channu | 05:38 +1d → 08:22·PR | 05:40 +1d |
| 16 | Chichawatni | 06:07 +1d → 08:50·PR | 06:09 +1d → 08:52 |
| 17 | Sahiwal | 06:48 +1d → 09:24·PR | 06:50 +1d → 09:28 |
| 18 | Okara | 07:18 +1d → 09:55·PR | 07:20 +1d → 10:01 |
| 19 | Pattoki | 07:52 +1d → 10:41·PR | 07:54 +1d → 10:45 |
| 20 | Raiwind Jn. | 08:25 +1d → 11:19·PR | 08:30 +1d → 11:23 |
| 21 | Kot Lakhpat | 08:58 +1d → 11:49·PR | 09:00 +1d → 11:52 |
| 22 | Lahore Cantt | 09:20 +1d → 12:06·PR | 09:22 +1d → 12:08 |
| 23 | Lahore Jn. | 09:40 +1d → 12:17·PR | 10:15 +1d → 12:18 |
| 24 | Gujranwala | 11:24 +1d → 14:09·PR | 11:26 +1d → 14:09 |
| 25 | Wazirabad Jn | 12:05 +1d → 14:49·PR | 12:07 +1d → 14:53 |
| 26 | Gujrat | 12:25 +1d → 15:11·PR | 12:27 +1d |
| 27 | Lala Musa Jn. | 12:45 +1d → 15:39·PR | 12:47 +1d |
| 28 | Kharian Cantt | 13:01 +1d → 16:01·PR | 13:03 +1d → 16:03 |
| 29 | Jhelum | 13:26 +1d → 16:38·PR | 13:28 +1d → 16:42 |
| 30 | Gujar Khan | 14:55 +1d | 14:57 +1d |
| 31 | Rawalpindi | 16:00 +1d | 16:25 +1d |
| 32 | Attock City Jn | 17:49 +1d | 17:51 +1d |
| 33 | Jahangira Road | 18:27 +1d | 18:29 +1d |
| 34 | Nowshera Jn | 18:45 +1d | 18:47 +1d |
| 35 | Peshawar City | 19:27 +1d | 19:28 +1d |
| 36 | Peshawar Cantt | 19:35 +1d | — |
What the marks mean
- → 21:28 — actual time on the 8 October 2026 run
- ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
- +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
- Blank — not recorded
A full recorded run: 22 August 2026 →
Station by station, last 5 days
142 arrivals recordedOne mark per day, newest first.
A run’s GPS trail is decoded after the journey completes — recent days may link later.
2Shikarpurscheduled 19:00+1h461 day
Day Arrived Delay Recorded by Thu 8 Oct not recorded — Wed 7 Oct arrived, time not recorded +1h46 Pakistan Railways Tue 6 Oct not recorded — Mon 5 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Shikarpur →
3Sukkurscheduled 20:00+1h484 days
Day Arrived Delay Recorded by Thu 8 Oct arrived, time not recorded +1h54 Pakistan Railways Wed 7 Oct 21:49 +1h43 Pakistan Railways Tue 6 Oct arrived, time not recorded +1h11 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct arrived, time not recorded +1h53 Pakistan Railways Seen on 4 of 5 days, ranging +1h11 to +1h54. Every train at Sukkur →
4Rohri Jn.scheduled 20:25+1h254 days
Day Arrived Delay Recorded by Thu 8 Oct 22:14 +1h25 Pakistan Railways Wed 7 Oct 22:13 +1h24 Pakistan Railways Tue 6 Oct 21:32 +42m Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 22:19 +1h30 Pakistan Railways Seen on 4 of 5 days, ranging +42m to +1h30. Every train at Rohri Jn. →
5Pano Akilscheduled 21:30+2h4 days
Day Arrived Delay Recorded by Thu 8 Oct 23:49 +2h14 Pakistan Railways Wed 7 Oct 23:40 +2h05 Pakistan Railways Tue 6 Oct 22:53 +1h19 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 23:28 +1h54 Pakistan Railways Seen on 4 of 5 days, ranging +1h19 to +2h14. Every train at Pano Akil →
6Ghotkischeduled 21:58+2h084 days
Day Arrived Delay Recorded by Thu 8 Oct 00:26 +2h26 Pakistan Railways Wed 7 Oct 00:12 +2h13 Pakistan Railways Tue 6 Oct 23:32 +1h32 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 00:02 +2h03 Pakistan Railways Seen on 4 of 5 days, ranging +1h32 to +2h26. Every train at Ghotki →
7Sadiqabadscheduled 23:16+2h054 days
Day Arrived Delay Recorded by Thu 8 Oct 01:44 +2h26 Pakistan Railways Wed 7 Oct 01:32 +2h14 Pakistan Railways Tue 6 Oct 00:46 +1h29 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 01:14 +1h56 Pakistan Railways Seen on 4 of 5 days, ranging +1h29 to +2h26. Every train at Sadiqabad →
8Rahim Yar Khanscheduled 23:50+1h574 days
Day Arrived Delay Recorded by Thu 8 Oct 02:12 +2h20 Pakistan Railways Wed 7 Oct 01:59 +2h07 Pakistan Railways Tue 6 Oct 01:12 +1h20 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 01:37 +1h46 Pakistan Railways Seen on 4 of 5 days, ranging +1h20 to +2h20. Every train at Rahim Yar Khan →
9Khanpur Jn.scheduled 00:53+1h484 days
Day Arrived Delay Recorded by Thu 8 Oct 03:01 +2h07 Pakistan Railways Wed 7 Oct 02:56 +2h02 Pakistan Railways Tue 6 Oct 02:12 +1h17 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 02:27 +1h33 Pakistan Railways Seen on 4 of 5 days, ranging +1h17 to +2h07. Every train at Khanpur Jn. →
10Samasata Jnscheduled 02:16+1h524 days
Day Arrived Delay Recorded by Thu 8 Oct 04:55 +2h38 Pakistan Railways Wed 7 Oct 04:19 +2h01 Pakistan Railways Tue 6 Oct 03:42 +1h25 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 04:00 +1h42 Pakistan Railways Seen on 4 of 5 days, ranging +1h25 to +2h38. Every train at Samasata Jn →
11Bahawalpurscheduled 02:30+1h554 days
Day Arrived Delay Recorded by Thu 8 Oct 05:15 +2h42 Pakistan Railways Wed 7 Oct 04:44 +2h11 Pakistan Railways Tue 6 Oct arrived, time not recorded +1h23 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 04:10 +1h38 Pakistan Railways Seen on 4 of 5 days, ranging +1h23 to +2h42. Every train at Bahawalpur →
12Lodhran Jnscheduled 02:54+2h054 days
Day Arrived Delay Recorded by Thu 8 Oct 05:35 +2h39 Pakistan Railways Wed 7 Oct 05:30 +2h35 Pakistan Railways Tue 6 Oct 04:17 +1h21 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 04:30 +1h35 Pakistan Railways Seen on 4 of 5 days, ranging +1h21 to +2h39. Every train at Lodhran Jn →
13Multan Canttscheduled 04:00+1h494 days
Day Arrived Delay Recorded by Thu 8 Oct 06:46 +2h26 Pakistan Railways Wed 7 Oct 06:32 +2h13 Pakistan Railways Tue 6 Oct 05:33 +1h13 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 05:43 +1h24 Pakistan Railways Seen on 4 of 5 days, ranging +1h13 to +2h26. Every train at Multan Cantt →
14Khanewal Jnscheduled 05:00+2h104 days
Day Arrived Delay Recorded by Thu 8 Oct 07:42 +2h38 Pakistan Railways Wed 7 Oct 07:33 +2h35 Pakistan Railways Tue 6 Oct 06:31 +1h27 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 06:50 +1h45 Pakistan Railways Seen on 4 of 5 days, ranging +1h27 to +2h38. Every train at Khanewal Jn →
15Mian Channuscheduled 05:38+2h114 days
Day Arrived Delay Recorded by Thu 8 Oct 08:22 +2h43 Pakistan Railways Wed 7 Oct 08:10 +2h30 Pakistan Railways Tue 6 Oct 07:04 +1h25 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 07:31 +1h52 Pakistan Railways Seen on 4 of 5 days, ranging +1h25 to +2h43. Every train at Mian Channu →
16Chichawatnischeduled 06:07+2h084 days
Day Arrived Delay Recorded by Thu 8 Oct 08:50 +2h41 Pakistan Railways Wed 7 Oct 08:35 +2h26 Pakistan Railways Tue 6 Oct 07:28 +1h20 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 07:59 +1h50 Pakistan Railways Seen on 4 of 5 days, ranging +1h20 to +2h41. Every train at Chichawatni →
17Sahiwalscheduled 06:48+2h4 days
Day Arrived Delay Recorded by Thu 8 Oct 09:24 +2h34 Pakistan Railways Wed 7 Oct 09:06 +2h17 Pakistan Railways Tue 6 Oct 07:58 +1h09 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 08:33 +1h43 Pakistan Railways Seen on 4 of 5 days, ranging +1h09 to +2h34. Every train at Sahiwal →
18Okarascheduled 07:18+2h034 days
Day Arrived Delay Recorded by Thu 8 Oct 09:55 +2h36 Pakistan Railways Wed 7 Oct 09:36 +2h17 Pakistan Railways Tue 6 Oct 09:05 +1h45 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 09:07 +1h48 Pakistan Railways Seen on 4 of 5 days, ranging +1h45 to +2h36. Every train at Okara →
19Pattokischeduled 07:52+2h064 days
Day Arrived Delay Recorded by Thu 8 Oct 10:41 +2h48 Pakistan Railways Wed 7 Oct 10:11 +2h17 Pakistan Railways Tue 6 Oct 09:45 +1h51 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 09:48 +1h55 Pakistan Railways Seen on 4 of 5 days, ranging +1h51 to +2h48. Every train at Pattoki →
20Raiwind Jn.scheduled 08:25+2h044 days
Day Arrived Delay Recorded by Thu 8 Oct 11:19 +2h49 Pakistan Railways Wed 7 Oct 10:44 +2h14 Pakistan Railways Tue 6 Oct 10:18 +1h48 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 10:23 +1h54 Pakistan Railways Seen on 4 of 5 days, ranging +1h48 to +2h49. Every train at Raiwind Jn. →
21Kot Lakhpatscheduled 08:58+2h034 days
Day Arrived Delay Recorded by Thu 8 Oct 11:49 +2h49 Pakistan Railways Wed 7 Oct 11:08 +2h09 Pakistan Railways Tue 6 Oct 10:45 +1h46 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 10:56 +1h56 Pakistan Railways Seen on 4 of 5 days, ranging +1h46 to +2h49. Every train at Kot Lakhpat →
22Lahore Canttscheduled 09:20+1h584 days
Day Arrived Delay Recorded by Thu 8 Oct 12:06 +2h46 Pakistan Railways Wed 7 Oct 11:24 +2h03 Pakistan Railways Tue 6 Oct 11:01 +1h40 Pakistan Railways Mon 5 Oct not recorded — Sun 4 Oct 11:15 +1h53 Pakistan Railways Seen on 4 of 5 days, ranging +1h40 to +2h46. Every train at Lahore Cantt →
23Lahore Jn.scheduled 09:40+1h365 days
Day Arrived Delay Recorded by Thu 8 Oct 12:17 +2h38 Pakistan Railways Wed 7 Oct 11:39 +1h25 Pakistan Railways Tue 6 Oct 11:16 +1h36 Pakistan Railways Mon 5 Oct arrived, time not recorded +2h43 Pakistan Railways Sun 4 Oct 11:34 +1h20 Pakistan Railways Seen on 5 of 5 days, ranging +1h20 to +2h43. Every train at Lahore Jn. →
24Gujranwalascheduled 11:24+2h085 days
Day Arrived Delay Recorded by Thu 8 Oct 14:09 +2h43 Pakistan Railways Wed 7 Oct 13:33 +2h08 Pakistan Railways Tue 6 Oct 13:13 +1h47 Pakistan Railways Mon 5 Oct 14:42 +3h17 Pakistan Railways Sun 4 Oct 13:31 +2h05 Pakistan Railways Seen on 5 of 5 days, ranging +1h47 to +3h17. Every train at Gujranwala →
25Wazirabad Jnscheduled 12:05+1h555 days
Day Arrived Delay Recorded by Thu 8 Oct 14:49 +2h43 Pakistan Railways Wed 7 Oct 14:01 +1h55 Pakistan Railways Tue 6 Oct 13:43 +1h37 Pakistan Railways Mon 5 Oct 15:11 +3h06 Pakistan Railways Sun 4 Oct 13:55 +1h49 Pakistan Railways Seen on 5 of 5 days, ranging +1h37 to +3h06. Every train at Wazirabad Jn →
26Gujratscheduled 12:25+2h025 days
Day Arrived Delay Recorded by Thu 8 Oct 15:11 +2h44 Pakistan Railways Wed 7 Oct 14:28 +2h02 Pakistan Railways Tue 6 Oct 14:17 +1h50 Pakistan Railways Mon 5 Oct 15:32 +3h06 Pakistan Railways Sun 4 Oct 14:19 +1h55 Pakistan Railways Seen on 5 of 5 days, ranging +1h50 to +3h06. Every train at Gujrat →
27Lala Musa Jn.scheduled 12:45+2h065 days
Day Arrived Delay Recorded by Thu 8 Oct 15:39 +2h53 Pakistan Railways Wed 7 Oct 14:52 +2h06 Pakistan Railways Tue 6 Oct 14:38 +1h51 Pakistan Railways Mon 5 Oct 15:56 +3h09 Pakistan Railways Sun 4 Oct 14:44 +1h57 Pakistan Railways Seen on 5 of 5 days, ranging +1h51 to +3h09. Every train at Lala Musa Jn. →
28Kharian Canttscheduled 13:01+2h025 days
Day Arrived Delay Recorded by Thu 8 Oct 16:01 +2h59 Pakistan Railways Wed 7 Oct 15:05 +2h02 Pakistan Railways Tue 6 Oct 14:58 +1h55 Pakistan Railways Mon 5 Oct 16:09 +3h07 Pakistan Railways Sun 4 Oct 14:57 +1h54 Pakistan Railways Seen on 5 of 5 days, ranging +1h54 to +3h07. Every train at Kharian Cantt →
29Jhelumscheduled 13:26+2h075 days
Day Arrived Delay Recorded by Thu 8 Oct 16:38 +3h10 Pakistan Railways Wed 7 Oct 15:34 +2h07 Pakistan Railways Tue 6 Oct 15:26 +1h58 Pakistan Railways Mon 5 Oct 16:47 +3h19 Pakistan Railways Sun 4 Oct 15:25 +1h57 Pakistan Railways Seen on 5 of 5 days, ranging +1h57 to +3h19. Every train at Jhelum →
30Gujar Khanscheduled 14:55+2h144 days
Day Arrived Delay Recorded by Thu 8 Oct not recorded — Wed 7 Oct 17:16 +2h20 Pakistan Railways Tue 6 Oct arrived, time not recorded +2h07 Pakistan Railways Mon 5 Oct 18:28 +3h31 Pakistan Railways Sun 4 Oct 16:58 +2h01 Pakistan Railways Seen on 4 of 5 days, ranging +2h01 to +3h31. Every train at Gujar Khan →
31Rawalpindischeduled 16:00+2h284 days
Day Arrived Delay Recorded by Thu 8 Oct not recorded — Wed 7 Oct 18:52 +2h29 Pakistan Railways Tue 6 Oct 18:52 +2h27 Pakistan Railways Mon 5 Oct 20:07 +3h42 Pakistan Railways Sun 4 Oct 18:35 +2h11 Pakistan Railways Seen on 4 of 5 days, ranging +2h11 to +3h42. Every train at Rawalpindi →
32Attock City Jnscheduled 17:49+3h204 days
Day Arrived Delay Recorded by Thu 8 Oct not recorded — Wed 7 Oct 21:10 +3h19 Pakistan Railways Tue 6 Oct 21:11 +3h21 Pakistan Railways Mon 5 Oct 22:05 +4h14 Pakistan Railways Sun 4 Oct 21:05 +3h14 Pakistan Railways Seen on 4 of 5 days, ranging +3h14 to +4h14. Every train at Attock City Jn →
33Jahangira Roadscheduled 18:27+3h214 days
Day Arrived Delay Recorded by Thu 8 Oct not recorded — Wed 7 Oct 21:48 +3h20 Pakistan Railways Tue 6 Oct 21:51 +3h22 Pakistan Railways Mon 5 Oct 22:45 +4h17 Pakistan Railways Sun 4 Oct 21:47 +3h19 Pakistan Railways Seen on 4 of 5 days, ranging +3h19 to +4h17. Every train at Jahangira Road →
34Nowshera Jnscheduled 18:45+3h304 days
Day Arrived Delay Recorded by Thu 8 Oct not recorded — Wed 7 Oct 22:11 +3h24 Pakistan Railways Tue 6 Oct 22:18 +3h32 Pakistan Railways Mon 5 Oct 23:34 +4h48 Pakistan Railways Sun 4 Oct 22:15 +3h28 Pakistan Railways Seen on 4 of 5 days, ranging +3h24 to +4h48. Every train at Nowshera Jn →
35Peshawar Cityscheduled 19:27+3h523 days
Day Arrived Delay Recorded by Thu 8 Oct not recorded — Wed 7 Oct arrived, time not recorded +3h44 Pakistan Railways Tue 6 Oct not recorded — Mon 5 Oct 00:17 +4h50 Pakistan Railways Sun 4 Oct 23:20 +3h52 Pakistan Railways Seen on 3 of 5 days, ranging +3h44 to +4h50. Every train at Peshawar City →
36Peshawar Canttscheduled 19:35+3h553 days
Day Arrived Delay Recorded by Thu 8 Oct not recorded — Wed 7 Oct 23:20 +3h46 Train GPS Tue 6 Oct not recorded — Mon 5 Oct 00:25 +4h50 Train GPS Sun 4 Oct 23:29 +3h55 Train GPS Seen on 3 of 5 days, ranging +3h46 to +4h50. Every train at Peshawar Cantt →
What the marks mean
- Tap a station — each day’s arrival, delay and recorder
- Green — within 15 minutes of the scheduled time
- Amber — 16 to 45 minutes late
- Red — over 45 minutes late
- Hollow — not recorded that day
- Grey — arrived, no delay figure
- Dash (—) — no delay figure for this stop yet
- Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
- The starting station is not listed — a train does not arrive where it begins.
Common questions
Is Jaffar Express 39UP usually late?
Typically 239 minutes late arriving at Peshawar Cantt, measured across 33 recorded arrivals (30 Jul – 7 Oct 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.
How late is Jaffar Express 39UP on a bad day?
On the worst one run in ten, 389 minutes late into Peshawar Cantt, against a typical 239 minutes late. Both come from the same 33 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.
What time does Jaffar Express 39UP leave Jacobabad Jn?
17:50, on the current published timetable. It is booked into Peshawar Cantt at 19:35, the day after it leaves. Those are booked times. The delay figures on this page are what we recorded against them.
How long does Jaffar Express 39UP take from Jacobabad Jn to Peshawar Cantt?
25h 45m on the timetable. In practice a typical run has taken 29h 44m, measured from recorded arrivals at Peshawar Cantt.
How many stops does Jaffar Express 39UP make?
36 on the current published timetable, from Jacobabad Jn to Peshawar Cantt. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.
Where is Jaffar Express 39UP right now?
The live tracker for this train shows its last reported position and how late it was running at its most recent recorded stop. Position comes from the operator's own feed. When a train is not reporting we say so rather than estimating where it might be.
Other trains on this route
All Jacobabad–Peshawar trains →Service history (first year, operating eras) is drawn from Wikipedia's List of Pakistan Railways trains, retrieved 15 August 2026, matched on train number. Further reading: the train's own Wikipedia article.