277 Sargodha Shuttle-S1up پنڈ دادنخان شٹل 5اپ
How late is it, usually?
no figure yetOne day recorded so far.
A typical (median) delay figure appears at 7 full days of recorded runs — days the train reported, not calendar days.
1 of 7 recorded days toward a first typical-delay figure
Where the time goes
runs close to timeLeaves Sargodha Jn 46 min early · reaches Malakwal Jn +14 min — +1h lost along the way.
- Sargodha Jn11:00سرگودھا جنکشن46 min early
- Bhalwal11:49بھلوال+18 min
- Phularwan12:09پھلروان+20 min
- Pind Mukku12:32پنڈ مکو+41 min
- Malakwal Jn13:05ملکوال جنکشن+14 min
What the marks mean
- Solid bar — the typical delay at that stop (median of recorded arrivals)
- Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
- No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
- — (no solid bar either) — fewer than 3 recorded runs at that stop
- A negative figure means the train typically ran early at that stop, not late
- Most time is lost between Sargodha Jn and Bhalwal (+1h 04m)
- Every stop on the current timetable is listed, in order, measured or not.
Timetable
scheduled → actual, 10 October 2026 runThe second time in a cell is what actually happened on the 10 October 2026 run.
| # | Station | Arrival | Departure |
|---|---|---|---|
| 1 | Sargodha Jn | — | 11:00 |
| 2 | Bhalwal | 11:47 → 11:48·PR | 11:49 → 11:50 |
| 3 | Phularwan | 12:08 | 12:09 |
| 4 | Pind Mukku | 12:31 | 12:32 |
| 5 | Malakwal Jn | 13:05 | 13:05 |
What the marks mean
- → 21:28 — actual time on the 10 October 2026 run
- ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
- +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
- Blank — not recorded
Station by station, last 5 days
12 arrivals recordedOne mark per day, newest first.
A run’s GPS trail is decoded after the journey completes — recent days may link later.
2Bhalwalscheduled 11:47+9m4 days
Day Arrived Delay Recorded by Sat 10 Oct 11:48 1m early Pakistan Railways Fri 9 Oct 11:42 6m early Pakistan Railways Thu 8 Oct arrived, time not recorded +1h17 Pakistan Railways Thu 20 Aug not recorded — Wed 19 Aug 12:04 +18m Pakistan Railways (journey record) Seen on 4 of 5 days, ranging 6m early to +1h17. Every train at Bhalwal →
3Phularwanscheduled 12:08+18m3 days
Day Arrived Delay Recorded by Sat 10 Oct not recorded — Fri 9 Oct 12:20 +12m Pakistan Railways Thu 8 Oct 13:25 +1h17 Pakistan Railways Thu 20 Aug not recorded — Wed 19 Aug 12:25 +18m Pakistan Railways (journey record) Seen on 3 of 5 days, ranging +12m to +1h17. Every train at Phularwan →
4Pind Mukkuscheduled 12:31+38m2 days
Day Arrived Delay Recorded by Sat 10 Oct not recorded — Fri 9 Oct arrived, time not recorded 3m early Pakistan Railways Thu 8 Oct arrived, time not recorded +1h18 Pakistan Railways Thu 20 Aug not recorded — Wed 19 Aug not recorded — Seen on 2 of 5 days, ranging 3m early to +1h18. Every train at Pind Mukku →
5Malakwal Jnscheduled 13:05+8m3 days
Day Arrived Delay Recorded by Sat 10 Oct not recorded — Fri 9 Oct 13:04 1m early Train GPS Thu 8 Oct 14:08 +1h04 Train GPS Thu 20 Aug not recorded — Wed 19 Aug 13:12 +8m Pakistan Railways (journey record) Seen on 3 of 5 days, ranging 1m early to +1h04. Every train at Malakwal Jn →
What the marks mean
- Tap a station — each day’s arrival, delay and recorder
- Green — within 15 minutes of the scheduled time
- Amber — 16 to 45 minutes late
- Red — over 45 minutes late
- Hollow — not recorded that day
- Grey — arrived, no delay figure
- Dash (—) — no delay figure for this stop yet
- Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
- The starting station is not listed — a train does not arrive where it begins.
Common questions
Is Sargodha Shuttle-S1up 277 UP usually late?
Typically 14 minutes late arriving at Malakwal Jn, measured across 7 recorded arrivals (6 Aug – 9 Oct 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.
How late is Sargodha Shuttle-S1up 277 UP on a bad day?
On the worst one run in ten, 35 minutes late into Malakwal Jn, against a typical 14 minutes late. Both come from the same 7 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.
What time does Sargodha Shuttle-S1up 277 UP leave Sargodha Jn?
11:00, on the current published timetable. It is booked into Malakwal Jn at 13:05, the day it leaves. Those are booked times. The delay figures on this page are what we recorded against them.
How long does Sargodha Shuttle-S1up 277 UP take from Sargodha Jn to Malakwal Jn?
2h 05m on the timetable. In practice a typical run has taken 2h 19m, measured from recorded arrivals at Malakwal Jn.
How many stops does Sargodha Shuttle-S1up 277 UP make?
5 on the current published timetable, from Sargodha Jn to Malakwal Jn. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.
Other trains on this route
All Sargodha–Malakwal trains →Service history (first year, operating eras) is drawn from Wikipedia's List of Pakistan Railways trains, retrieved 15 August 2026, matched on train number.