277 Sargodha Shuttle-S1up پنڈ دادنخان شٹل 5اپ
How late is it, usually?
no figure yetOne day recorded so far.
A typical (median) delay figure appears at 7 full days of recorded runs — days the train reported, not calendar days.
1 of 7 recorded days toward a first typical-delay figure
Where the time goes
already late at BhalwalLeaves Bhalwal +20 min · reaches Malakwal Jn +14 min — makes up +6 min.
- Sargodha Jn11:00سرگودھا جنکشن—
- Bhalwal11:49بھلوال+20 min
- Phularwan12:09پھلروان+23 min
- Pind Mukku12:32پنڈ مکو—
- Malakwal Jn13:05ملکوال جنکشن+14 min
What the marks mean
- Solid bar — the typical delay at that stop (median of recorded arrivals)
- Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
- No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
- — (no solid bar either) — fewer than 3 recorded runs at that stop
- A negative figure means the train typically ran early at that stop, not late
- Most time is lost between Bhalwal and Phularwan (+3 min)
- Every stop on the current timetable is listed, in order, measured or not.
Timetable
scheduled → actual, 8 October 2026 runThe second time in a cell is what actually happened on the 8 October 2026 run.
| # | Station | Arrival | Departure |
|---|---|---|---|
| 1 | Sargodha Jn | — | 11:00 |
| 2 | Bhalwal | 11:47 | 11:49 |
| 3 | Phularwan | 12:08 → 13:25·PR | 12:09 → 13:25 |
| 4 | Pind Mukku | 12:31 | 12:32 |
| 5 | Malakwal Jn | 13:05 → 14:08 | 13:05 |
What the marks mean
- → 21:28 — actual time on the 8 October 2026 run
- ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
- +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
- Blank — not recorded
Station by station, last 5 days
12 arrivals recordedOne mark per day, newest first.
A run’s GPS trail is decoded after the journey completes — recent days may link later.
2Bhalwalscheduled 11:47+18m4 days
Day Arrived Delay Recorded by Thu 8 Oct arrived, time not recorded +1h17 Pakistan Railways Thu 20 Aug not recorded — Wed 19 Aug 12:04 +18m Pakistan Railways (journey record) Tue 18 Aug 11:45 2m early Pakistan Railways (journey record) Mon 17 Aug 12:04 +18m Pakistan Railways (journey record) Seen on 4 of 5 days, ranging 2m early to +1h17. Every train at Bhalwal →
3Phularwanscheduled 12:08+19m4 days
Day Arrived Delay Recorded by Thu 8 Oct 13:25 +1h17 Pakistan Railways Thu 20 Aug not recorded — Wed 19 Aug 12:25 +18m Pakistan Railways (journey record) Tue 18 Aug 12:10 +2m Pakistan Railways (journey record) Mon 17 Aug 12:28 +20m Pakistan Railways (journey record) Seen on 4 of 5 days, ranging +2m to +1h17. Every train at Phularwan →
4Pind Mukkuscheduled 12:31+1h181 day
Day Arrived Delay Recorded by Thu 8 Oct arrived, time not recorded +1h18 Pakistan Railways Thu 20 Aug not recorded — Wed 19 Aug not recorded — Tue 18 Aug not recorded — Mon 17 Aug not recorded — Seen on 1 of 5 days. Every train at Pind Mukku →
5Malakwal Jnscheduled 13:05+14m3 days
Day Arrived Delay Recorded by Thu 8 Oct 14:08 +1h04 Train GPS Thu 20 Aug not recorded — Wed 19 Aug 13:12 +8m Pakistan Railways (journey record) Tue 18 Aug not recorded — Mon 17 Aug 13:19 +14m Pakistan Railways (journey record) Seen on 3 of 5 days, ranging +8m to +1h04. Every train at Malakwal Jn →
What the marks mean
- Tap a station — each day’s arrival, delay and recorder
- Green — within 15 minutes of the scheduled time
- Amber — 16 to 45 minutes late
- Red — over 45 minutes late
- Hollow — not recorded that day
- Grey — arrived, no delay figure
- Dash (—) — no delay figure for this stop yet
- Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
- The starting station is not listed — a train does not arrive where it begins.
Common questions
Is Sargodha Shuttle-S1up 277 UP usually late?
We are not saying yet. We do not hold enough recorded arrivals for Sargodha Shuttle-S1up 277 UP to publish a punctuality figure that would mean anything. The figures appear on this page as the archive fills, and a blank is more honest than a number drawn from two journeys.
What time does Sargodha Shuttle-S1up 277 UP leave Sargodha Jn?
11:00, on the current published timetable. It is booked into Malakwal Jn at 13:05, the day it leaves. Those are booked times. The delay figures on this page are what we recorded against them.
How long does Sargodha Shuttle-S1up 277 UP take from Sargodha Jn to Malakwal Jn?
2h 05m on the timetable. We do not yet hold enough recorded arrivals at Malakwal Jn to say what it takes in practice.
How many stops does Sargodha Shuttle-S1up 277 UP make?
5 on the current published timetable, from Sargodha Jn to Malakwal Jn. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.
Other trains on this route
All Sargodha–Malakwal trains →Service history (first year, operating eras) is drawn from Wikipedia's List of Pakistan Railways trains, retrieved 15 August 2026, matched on train number.