278 Sargodha Shuttle-S2dn پنڈ دادنخان شٹل 6 ڈاؤن
Running 6 min late — heading for Sargodha Jn, due 10:16 (operator's estimate), 70 km/h. Last crossed Bhalwal.
How late is it, usually?
no figure yet2 days recorded so far.
A typical (median) delay figure appears at 7 full days of recorded runs — days the train reported, not calendar days.
2 of 7 recorded days toward a first typical-delay figure
Where the time goes
already late at Akhter KaranaLeaves Akhter Karana +18 min · reaches Sargodha Jn +19 min — +1 min lost along the way.
- Lala Musa Jn.06:00لالہ مُوسٰی جنکشن—
- Akhter Karana06:14اختر کرانہ+18 min
- Jaurah Karana06:33جوڑا کرانہ3 min early
- Dinga06:47ڈنگہ+9 min
- Chilian Wala07:00چیلاں والا+10 min
- Mandi Bahauddin07:13منڈی بہاوّالدین+17 min
- Hariah07:30ہریہا+16 min
- Malakwal Jn07:55ملکوال جنکشن+11 min
- Banna Mian Wala08:05بنہ میانوالا+24 min
- Pind Mukku08:17پنڈ مکو+35 min
- Mona08:23مونا+15 min
- Ratto Kala08:30رتو کالا+25 min
- Phularwan08:39پھلروان+29 min
- Bhalwal09:02بھلوال+34 min
- Sargodha Jn10:10سرگودھا جنکشن+19 min
Where it stands longest past the timetableshortest to longest recorded
- Phularwanscheduled 1 min2–30 min
- Akhter Karanascheduled 2 min1–56 min
- Bhalwalscheduled 2 min3 min–1h 07m
- Hariahscheduled 2 min1–8 min
- Malakwal Jnscheduled 10 min10–32 min
What the marks mean
- Solid bar — the typical delay at that stop (median of recorded arrivals)
- Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
- No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
- — (no solid bar either) — fewer than 3 recorded runs at that stop
- A negative figure means the train typically ran early at that stop, not late
- Band — the shortest and the longest stand recorded at that stop. The train has left as early as the first figure.
- Keyline — the scheduled stop, arrival to departure on the timetable below.
- Why a train stands is not recorded — a crossing, a loco change and a red signal all look the same on the clock.
- The five stops that stand longest past the timetable, not every stop — most routes have more. A stop qualifies with 7 or more runs timed in and out, and is skipped where the timetable books no stop, books one over an hour, or where any recorded stand ran past three hours.
- Most time is lost between Malakwal Jn and Banna Mian Wala (+13 min)
- Every stop on the current timetable is listed, in order, measured or not.
Timetable
scheduled → actual, 9 October 2026 runThe second time in a cell is what actually happened on the 9 October 2026 run.
| # | Station | Arrival | Departure |
|---|---|---|---|
| 1 | Lala Musa Jn. | — | 06:00 |
| 2 | Akhter Karana | 06:12 → 06:17·PR | 06:14 |
| 3 | Jaurah Karana | 06:31 → 06:23·PR | 06:33 → 06:25 |
| 4 | Dinga | 06:45 → 06:47·PR | 06:47 → 06:51 |
| 5 | Chilian Wala | 06:59 → 07:08·PR | 07:00 |
| 6 | Mandi Bahauddin | 07:11 → 07:31·PR | 07:13 |
| 7 | Hariah | 07:28 → 07:44·PR | 07:30 → 07:46 |
| 8 | Malakwal Jn | 07:45 → 07:56·PR | 07:55 → 08:11 |
| 9 | Banna Mian Wala | 08:04 | 08:05 |
| 10 | Pind Mukku | 08:16 → 08:52·PR | 08:17 → 08:52 |
| 11 | Mona | 08:22 → 08:58·PR | 08:23 |
| 12 | Ratto Kala | 08:29 → 09:02·PR | 08:30 → 09:04 |
| 13 | Phularwan | 08:38 → 09:11·PR | 08:39 → 09:19 |
| 14 | Bhalwal | 09:00 → 09:36·PR | 09:02 |
| 15 | Sargodha Jn | 10:10 | 10:10 |
What the marks mean
- → 21:28 — actual time on the 9 October 2026 run
- ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
- +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
- Blank — not recorded
A full recorded run: 2 August 2026 →
Station by station, last 5 days
51 arrivals recordedOne mark per day, newest first.
A run’s GPS trail is decoded after the journey completes — recent days may link later.
2Akhter Karanascheduled 06:12+22m3 days
Day Arrived Delay Recorded by Fri 9 Oct 06:17 +3m Pakistan Railways Thu 8 Oct not recorded — Thu 20 Aug not recorded — Wed 19 Aug 06:33 +22m Pakistan Railways (journey record) Tue 18 Aug 06:42 +31m Pakistan Railways (journey record) Seen on 3 of 5 days, ranging +3m to +31m. Every train at Akhter Karana →
3Jaurah Karanascheduled 06:31+5m4 days
Day Arrived Delay Recorded by Fri 9 Oct 06:23 9m early Pakistan Railways Thu 8 Oct not recorded — Thu 20 Aug 06:30 1m early Pakistan Railways (journey record) Wed 19 Aug 06:42 +11m Pakistan Railways (journey record) Tue 18 Aug 06:48 +18m Pakistan Railways (journey record) Seen on 4 of 5 days, ranging 9m early to +18m. Every train at Jaurah Karana →
4Dingascheduled 06:45+14m3 days
Day Arrived Delay Recorded by Fri 9 Oct 06:47 on time Pakistan Railways Thu 8 Oct not recorded — Thu 20 Aug not recorded — Wed 19 Aug 06:58 +14m Pakistan Railways (journey record) Tue 18 Aug 07:05 +20m Pakistan Railways (journey record) Seen on 3 of 5 days, ranging on time to +20m. Every train at Dinga →
5Chilian Walascheduled 06:59+15m4 days
Day Arrived Delay Recorded by Fri 9 Oct 07:08 +9m Pakistan Railways Thu 8 Oct not recorded — Thu 20 Aug 07:04 +6m Pakistan Railways (journey record) Wed 19 Aug 07:18 +20m Pakistan Railways (journey record) Tue 18 Aug 07:20 +21m Pakistan Railways (journey record) Seen on 4 of 5 days, ranging +6m to +21m. Every train at Chilian Wala →
6Mandi Bahauddinscheduled 07:11+22m4 days
Day Arrived Delay Recorded by Fri 9 Oct 07:31 +17m Pakistan Railways Thu 8 Oct not recorded — Thu 20 Aug 07:25 +15m Pakistan Railways (journey record) Wed 19 Aug 07:37 +27m Pakistan Railways (journey record) Tue 18 Aug 07:37 +27m Pakistan Railways (journey record) Seen on 4 of 5 days, ranging +15m to +27m. Every train at Mandi Bahauddin →
7Hariahscheduled 07:28+18m5 days
Day Arrived Delay Recorded by Fri 9 Oct 07:44 +15m Pakistan Railways Thu 8 Oct arrived, time not recorded +15m Pakistan Railways Thu 20 Aug 07:45 +18m Pakistan Railways (journey record) Wed 19 Aug 07:58 +31m Pakistan Railways (journey record) Tue 18 Aug 07:57 +29m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +15m to +31m. Every train at Hariah →
8Malakwal Jnscheduled 07:45+16m5 days
Day Arrived Delay Recorded by Fri 9 Oct 07:56 +1m Pakistan Railways Thu 8 Oct 07:58 +14m Train GPS Thu 20 Aug 08:01 +16m Pakistan Railways (journey record) Wed 19 Aug 08:10 +26m Pakistan Railways (journey record) Tue 18 Aug 08:07 +23m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +1m to +26m. Every train at Malakwal Jn →
9Banna Mian Walascheduled 08:04+27m3 days
Day Arrived Delay Recorded by Fri 9 Oct arrived, time not recorded +36m Pakistan Railways Thu 8 Oct not recorded — Thu 20 Aug not recorded — Wed 19 Aug 08:31 +27m Train GPS Tue 18 Aug 08:27 +24m Train GPS Seen on 3 of 5 days, ranging +24m to +36m. Every train at Banna Mian Wala →
10Pind Mukkuscheduled 08:16+39m2 days
Day Arrived Delay Recorded by Fri 9 Oct 08:52 +42m Pakistan Railways Thu 8 Oct not recorded — Thu 20 Aug not recorded — Wed 19 Aug not recorded — Tue 18 Aug 08:51 +35m Train GPS Seen on 2 of 5 days, ranging +35m to +42m. Every train at Pind Mukku →
11Monascheduled 08:22+36m1 day
Day Arrived Delay Recorded by Fri 9 Oct 08:58 +36m Pakistan Railways Thu 8 Oct not recorded — Thu 20 Aug not recorded — Wed 19 Aug not recorded — Tue 18 Aug not recorded — Seen on 1 of 5 days. Every train at Mona →
12Ratto Kalascheduled 08:29+25m4 days
Day Arrived Delay Recorded by Fri 9 Oct 09:02 +33m Pakistan Railways Thu 8 Oct 08:59 +22m Pakistan Railways Thu 20 Aug 08:44 +16m Pakistan Railways (journey record) Wed 19 Aug 08:56 +28m Pakistan Railways (journey record) Tue 18 Aug not recorded — Seen on 4 of 5 days, ranging +16m to +33m. Every train at Ratto Kala →
13Phularwanscheduled 08:38+29m5 days
Day Arrived Delay Recorded by Fri 9 Oct 09:11 +33m Pakistan Railways Thu 8 Oct 09:01 +20m Pakistan Railways Thu 20 Aug 08:52 +15m Pakistan Railways (journey record) Wed 19 Aug 09:07 +29m Pakistan Railways (journey record) Tue 18 Aug 09:14 +37m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +15m to +37m. Every train at Phularwan →
14Bhalwalscheduled 09:00+34m5 days
Day Arrived Delay Recorded by Fri 9 Oct 09:36 +34m Pakistan Railways Thu 8 Oct 09:40 +39m Pakistan Railways Thu 20 Aug 09:17 +17m Pakistan Railways (journey record) Wed 19 Aug 09:47 +47m Pakistan Railways (journey record) Tue 18 Aug 09:32 +33m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +17m to +47m. Every train at Bhalwal →
15Sargodha Jnscheduled 10:10+5m3 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct not recorded — Thu 20 Aug 10:14 +4m Pakistan Railways (journey record) Wed 19 Aug 10:35 +25m Pakistan Railways (journey record) Tue 18 Aug 10:15 +5m Train GPS Seen on 3 of 5 days, ranging +4m to +25m. Every train at Sargodha Jn →
What the marks mean
- Tap a station — each day’s arrival, delay and recorder
- Green — within 15 minutes of the scheduled time
- Amber — 16 to 45 minutes late
- Red — over 45 minutes late
- Hollow — not recorded that day
- Grey — arrived, no delay figure
- Dash (—) — no delay figure for this stop yet
- Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
- The starting station is not listed — a train does not arrive where it begins.
Common questions
Is Sargodha Shuttle-S2dn 278 DN usually late?
Typically 19 minutes late arriving at Sargodha Jn, measured across 7 recorded arrivals (5 Aug – 20 Aug 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.
How late is Sargodha Shuttle-S2dn 278 DN on a bad day?
On the worst one run in ten, 42 minutes late into Sargodha Jn, against a typical 19 minutes late. Both come from the same 7 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.
What time does Sargodha Shuttle-S2dn 278 DN leave Lala Musa Jn.?
06:00, on the current published timetable. It is booked into Sargodha Jn at 10:10, the day it leaves. Those are booked times. The delay figures on this page are what we recorded against them.
How long does Sargodha Shuttle-S2dn 278 DN take from Lala Musa Jn. to Sargodha Jn?
4h 10m on the timetable. In practice a typical run has taken 4h 29m, measured from recorded arrivals at Sargodha Jn.
How many stops does Sargodha Shuttle-S2dn 278 DN make?
15 on the current published timetable, from Lala Musa Jn. to Sargodha Jn. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.
Where is Sargodha Shuttle-S2dn 278 DN right now?
The live tracker for this train shows its last reported position and how late it was running at its most recent recorded stop. Position comes from the operator's own feed. When a train is not reporting we say so rather than estimating where it might be.
Other trains on this route
All Lala Musa–Sargodha trains →Service history (first year, operating eras) is drawn from Wikipedia's List of Pakistan Railways trains, retrieved 15 August 2026, matched on train number.