RAWALPINDIMULTANRAWALPINDI
Down direction · returnsراولپِنڈى ۔ ملتان کینٹ ۔ راولپِنڈى
In service since 1995ExpressLast seen 21 November 2026115 days tracked

How late is it, usually?

median per recorded stop arrival

Every figure here is a median, not an average: why we publish a median, not an average. What counts as on time, and why some figures here are blank, is set out in what on time means here, and every threshold behind it.

At Multan Cantt+1h 06mmedian of 32 recorded arrivals · 1 Aug – 20 Nov 2026
Typical delay, any stop+39 minat a station this train calls at, not necessarily where you board · last 28 days
On time (within 15 min)9% of recorded stop arrivals
Bad day (90th percentile)+1h 08mworse than nine tenths of recorded stop arrivals

13 days of recorded arrivals.

Over 32 recorded arrivals (1 Aug – 20 Nov 2026), Thall Express 130DN has typically reached Multan Cantt around 23:36 the day it leaves — on the worst one run in ten, past 00:06 the day after it leaves, at Multan Cantt itself.

The “At Multan Cantt” tile above is the arrival at the end of the run; “Typical delay, any stop” averages every stop including the earlier ones, so it usually reads smaller. Where the time goes, below, shows every stop we have recorded.

How long does it take?

scheduled vs recorded

Scheduled 15h 30m — Rawalpindi to Multan Cantt. Typically 16h 36m, 1h 06m longer.

What these figures cover
  • Scheduled — the current timetable, Rawalpindi 07:00 to Multan Cantt 22:30
  • Typical journey — from the scheduled departure to the recorded arrival at Multan Cantt; the median of 32 runs
  • Bad day — 17h 06m at the 90th percentile: nine runs in ten come in under it
  • Keyline — the scheduled time. The solid bar is the typical journey, the faint bar behind it the bad day.
  • Recorded arrivals: 1 August to 20 November 2026.
  • End to end. For a shorter leg, the stop times are in the timetable below.

Which day is worst?

mean minutes late per recorded arrival, 8-week window
Mon+55 min · 5 runs
Tue+53 min · 5 runs
Wed+41 min · 4 runs
Thu+46 min · 5 runs
Fri+35 min · 5 runs
Sat+39 min · 5 runs
Sun+52 min · 4 runs

This is a mean over an 8-week window, not the median (typical) figure above — the two are not directly comparable.

Where the time goes

most of it lost after Rawalpindi

Leaves Rawalpindi 17 min early · reaches Multan Cantt +1h 06m — +1h 23m lost along the way.

  1. Rawalpindi07:00راولپِنڈى17 min early
  2. Golra Sharif07:19گولڑہ شریف+14 min
  3. Taxila Cantt07:41ٹیکسلا کینٹ+24 min
  4. Wah07:57واہ کینٹ+22 min
  5. Hasan Abdal08:03حسن ابدال+28 min
  6. Faqirabad08:23فقیرآباد+41 min
  7. Attock City Jn08:45اٹک سٹی جنکشن+40 min
  8. Basal Jn09:38بسال جنکشن+37 min
  9. Domel09:45ڈومیل+40 min
  10. Nammal09:59نمل+38 min
  11. Jand Jn10:26جنڈ جنکشن+24 min
  12. Jhammat10:51جھمٹ+42 min
  13. Chhab11:01چھب+45 min
  14. Khatakbad11:11خٹک آباد+49 min
  15. Injra11:19انجرا+1h 03m
  16. Mukhad Road11:33مکھڈ روڈ+1h
  17. Daud Khel Jn12:26داؤد خیل+1h 02m
  18. Pai Khel12:51پائ خیل+1h
  19. Mian Wali13:35میانوالی+50 min
  20. Kundian Jn14:25کندیاں+35 min
  21. Alluwali14:54علو والی+38 min
  22. Piplan15:15پپلاں+38 min
  23. Kalur Kot15:47کلور کوٹ+44 min
  24. Shah Alam16:25شاہ عالم+48 min
  25. Darya Khan16:59دریا خان+51 min
  26. Bhakkar17:30بھکر+42 min
  27. Behal17:58بیہل+58 min
  28. Karor Lal Esan18:20کرور لعل عیسن+1h 08m
  29. Doratta18:36دورتہ+1h 11m
  30. Layyah19:00لیّہ+1h 06m
  31. Kot Sultan19:39کوٹ سلطان+57 min
  32. Ahsan Pur Ahp20:01احسن پور+51 min
  33. Dera Dinpanah20:16ڈیرہ دین پناہ+48 min
  34. Kot Addu20:33کوٹ ادو+46 min
  35. Sanawan20:51سنا وان+1h 01m
  36. Gurmani21:01گرمانی+57 min
  37. Mehmood Kot21:11محمود کوٹ+58 min
  38. Muzaffargarh21:48مظفر گڑھ+58 min
  39. Sher Shah Jn22:11شیرشاہ جنکشن+1h 04m
  40. Multan Cantt22:30ملتان کینٹ+1h 06m

Where it stands longest past the timetableshortest to longest recorded

  1. Kot Adduscheduled 3 min7–12 min
  2. Hasan Abdalscheduled 2 min1–25 min
  3. Layyahscheduled 5 min3 min–1h 57m
  4. Bhakkarscheduled 2 min3–8 min
  5. Jand Jnscheduled 2 min3–40 min
What the marks mean
  • Solid bar — the typical delay at that stop (median of recorded arrivals)
  • Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
  • No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
  • — (no solid bar either) — fewer than 3 recorded runs at that stop
  • A negative figure means the train typically ran early at that stop, not late
  • Band — the shortest and the longest stand recorded at that stop. The train has left as early as the first figure.
  • Keyline — the scheduled stop, arrival to departure on the timetable below.
  • Why a train stands is not recorded — a crossing, a loco change and a red signal all look the same on the clock.
  • The five stops that stand longest past the timetable, not every stop — most routes have more. A stop qualifies with 7 or more runs timed in and out, and is skipped where the timetable books no stop, books one over an hour, or where any recorded stand ran past three hours.
  • Most time is lost between Rawalpindi and Golra Sharif (+31 min)
  • Every stop on the current timetable is listed, in order, measured or not.

Timetable

scheduled → actual, 20 November 2026 run

The second time in a cell is what actually happened on the 20 November 2026 run.

#StationArrivalDeparture
1Rawalpindi—07:00
2Golra Sharif07:17 → 07:20·PR07:19 → 07:23
3Taxila Cantt07:39 → 07:55·PR07:41
4Wah07:56 → 08:10·PR07:57
5Hasan Abdal08:01 → 08:17·PR08:03 → 08:20
6Faqirabad08:22 → 08:53·PR08:23
7Attock City Jn08:40 → 09:12·PR08:45 → 09:12
8Basal Jn09:37 → 09:55·PR09:38
9Domel09:44 → 10:05·PR09:45
10Nammal09:58 → 10:19·PR09:59
11Jand Jn10:24 → 10:32·PR10:26
12Jhammat10:50 → 11:16·PR10:51
13Chhab11:00 → 11:30·PR11:01
14Khatakbad11:10 → 11:46·PR11:11
15Injra11:1811:19
16Mukhad Road11:32 → 12:20·PR11:33 → 12:21
17Daud Khel Jn12:25 → 13:11·PR12:26 → 13:16
18Pai Khel12:50 → 13:35·PR12:51
19Mian Wali13:30 → 14:06·PR13:35 → 14:06
20Kundian Jn14:05 → 14:58·PR14:25
21Alluwali14:53 → 15:18·PR14:54
22Piplan15:13 → 15:42·PR15:15
23Kalur Kot15:45 → 16:15·PR15:47
24Shah Alam16:24 → 16:53·PR16:25
25Darya Khan16:57 → 17:32·PR16:59
26Bhakkar17:28 → 17:52·PR17:30 → 17:52
27Behal17:57 → 18:34·PR17:58
28Karor Lal Esan18:18 → 19:07·PR18:20 → 19:07
29Doratta18:35 → 19:26·PR18:36
30Layyah18:55 → 19:41·PR19:00
31Kot Sultan19:38 → 20:12·PR19:39 → 20:15
32Ahsan Pur Ahp20:00 → 20:28·PR20:01
33Dera Dinpanah20:15 → 20:40·PR20:16
34Kot Addu20:30 → 20:53·PR20:33
35Sanawan20:50 → 21:20·PR20:51
36Gurmani21:00 → 21:37·PR21:01
37Mehmood Kot21:10 → 21:52·PR21:11
38Muzaffargarh21:44 → 22:25·PR21:48
39Sher Shah Jn22:10 → 22:59·PR22:11
40Multan Cantt22:30 → 23:1922:30 → 23:23
What the marks mean
  • → 21:28 — actual time on the 20 November 2026 run
  • ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
  • +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
  • Blank — not recorded

Station by station, last 5 days

187 arrivals recorded

One mark per day, newest first.

A run’s GPS trail is decoded after the journey completes — recent days may link later.

  • 2Golra Sharifscheduled 07:17+9m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov07:20+3mPakistan Railways
    Wed 18 Nov07:25+7mPakistan Railways
    Mon 16 Nov07:54+36mPakistan Railways
    Sat 14 Nov07:35+18mPakistan Railways (journey record)
    Thu 12 Nov07:25+9mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +3m to +36m. Every train at Golra Sharif →

  • 3Taxila Canttscheduled 07:39+17m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov07:55+14mPakistan Railways
    Wed 18 Nov07:55+15mPakistan Railways
    Mon 16 Nov08:20+41mPakistan Railways
    Sat 14 Nov08:04+26mPakistan Railways (journey record)
    Thu 12 Nov07:56+17mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +14m to +41m. Every train at Taxila Cantt →

  • 4Wahscheduled 07:56+15m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov08:10+13mPakistan Railways
    Wed 18 Nov08:11+14mPakistan Railways
    Mon 16 Nov08:35+38mPakistan Railways
    Sat 14 Nov08:19+23mPakistan Railways (journey record)
    Thu 12 Nov08:10+15mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +13m to +38m. Every train at Wah →

  • 5Hasan Abdalscheduled 08:01+17m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov08:17+15mPakistan Railways
    Wed 18 Nov08:18+16mPakistan Railways
    Mon 16 Nov08:44+41mPakistan Railways
    Sat 14 Nov08:26+25mPakistan Railways (journey record)
    Thu 12 Nov08:17+17mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +15m to +41m. Every train at Hasan Abdal →

  • 6Faqirabadscheduled 08:22+38m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov08:53+30mPakistan Railways
    Wed 18 Nov09:01+38mPakistan Railways
    Mon 16 Nov09:13+50mPakistan Railways
    Sat 14 Nov08:59+38mPakistan Railways (journey record)
    Thu 12 Nov09:00+38mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +30m to +50m. Every train at Faqirabad →

  • 7Attock City Jnscheduled 08:40+41m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov09:12+27mPakistan Railways
    Wed 18 Novarrived, time not recorded+41mPakistan Railways
    Mon 16 Nov09:34+49mPakistan Railways
    Sat 14 Novarrived, time not recorded+41mPakistan Railways
    Thu 12 Nov09:16+36mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +27m to +49m. Every train at Attock City Jn →

  • 8Basal Jnscheduled 09:37+29m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov09:55+17mPakistan Railways
    Wed 18 Nov10:06+29mPakistan Railways
    Mon 16 Nov10:31+53mPakistan Railways
    Sat 14 Nov10:15+37mPakistan Railways
    Thu 12 Nov09:56+20mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +17m to +53m. Every train at Basal Jn →

  • 9Domelscheduled 09:44+30m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov10:05+21mPakistan Railways
    Wed 18 Nov10:14+30mPakistan Railways
    Mon 16 Nov10:40+56mPakistan Railways
    Sat 14 Nov10:18+34mPakistan Railways
    Thu 12 Nov10:04+20mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +20m to +56m. Every train at Domel →

  • 10Nammalscheduled 09:58+32m4 days
    DayArrivedDelayRecorded by
    Fri 20 Nov10:19+20mPakistan Railways
    Wed 18 Nov10:29+30mPakistan Railways
    Mon 16 Nov10:58+59mPakistan Railways
    Sat 14 Nov10:31+33mPakistan Railways
    Thu 12 Novnot recorded—

    Seen on 4 of 5 days, ranging +20m to +59m. Every train at Nammal →

  • 11Jand Jnscheduled 10:24+18m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov10:32+7mPakistan Railways
    Wed 18 Nov10:43+18mPakistan Railways
    Mon 16 Nov11:12+47mPakistan Railways
    Sat 14 Nov10:44+18mPakistan Railways
    Thu 12 Nov10:27+3mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +3m to +47m. Every train at Jand Jn →

  • 12Jhammatscheduled 10:50+30m4 days
    DayArrivedDelayRecorded by
    Fri 20 Nov11:16+27mPakistan Railways
    Wed 18 Nov11:20+31mPakistan Railways
    Mon 16 Nov11:54+1h04Pakistan Railways
    Sat 14 Nov11:20+29mPakistan Railways
    Thu 12 Novnot recorded—

    Seen on 4 of 5 days, ranging +27m to +1h04. Every train at Jhammat →

  • 13Chhabscheduled 11:00+31m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov11:30+30mPakistan Railways
    Wed 18 Nov11:34+33mPakistan Railways
    Mon 16 Nov12:09+1h09Pakistan Railways
    Sat 14 Nov11:31+31mPakistan Railways
    Thu 12 Nov11:19+19mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +19m to +1h09. Every train at Chhab →

  • 14Khatakbadscheduled 11:10+36m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov11:46+36mPakistan Railways
    Wed 18 Nov11:49+38mPakistan Railways
    Mon 16 Nov12:25+1h14Pakistan Railways
    Sat 14 Nov11:46+35mPakistan Railways
    Thu 12 Nov11:34+24mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +24m to +1h14. Every train at Khatakbad →

  • 15Injrascheduled 11:18+45m3 days
    DayArrivedDelayRecorded by
    Fri 20 Novarrived, time not recorded+45mPakistan Railways
    Wed 18 Novarrived, time not recorded+45mPakistan Railways
    Mon 16 Nov12:35+1h18Pakistan Railways
    Sat 14 Novnot recorded—
    Thu 12 Novnot recorded—

    Seen on 3 of 5 days, ranging +45m to +1h18. Every train at Injra →

  • 16Mukhad Roadscheduled 11:32+47m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov12:20+48mPakistan Railways
    Wed 18 Nov12:19+47mPakistan Railways
    Mon 16 Nov12:54+1h22Pakistan Railways
    Sat 14 Novarrived, time not recorded+47mPakistan Railways
    Thu 12 Nov12:07+36mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +36m to +1h22. Every train at Mukhad Road →

  • 17Daud Khel Jnscheduled 12:25+43m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov13:11+46mPakistan Railways
    Wed 18 Nov13:09+43mPakistan Railways
    Mon 16 Nov13:45+1h19Pakistan Railways
    Sat 14 Nov13:07+41mPakistan Railways
    Thu 12 Nov12:58+33mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +33m to +1h19. Every train at Daud Khel Jn →

  • 18Pai Khelscheduled 12:50+43m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov13:35+44mPakistan Railways
    Wed 18 Nov13:32+43mPakistan Railways
    Mon 16 Nov14:12+1h22Pakistan Railways
    Sat 14 Nov13:30+39mPakistan Railways
    Thu 12 Nov13:19+29mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +29m to +1h22. Every train at Pai Khel →

  • 19Mian Walischeduled 13:30+31m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov14:06+31mPakistan Railways
    Wed 18 Nov14:05+30mPakistan Railways
    Mon 16 Nov14:45+1h10Pakistan Railways
    Sat 14 Nov14:08+33mPakistan Railways
    Thu 12 Nov13:53+24mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +24m to +1h10. Every train at Mian Wali →

  • 20Kundian Jnscheduled 14:05+32m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov14:58+34mPakistan Railways
    Wed 18 Nov14:52+27mPakistan Railways
    Mon 16 Nov14:59+55mPakistan Railways
    Sat 14 Nov14:56+32mPakistan Railways
    Thu 12 Nov14:20+15mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +15m to +55m. Every train at Kundian Jn →

  • 21Alluwalischeduled 14:53+23m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov15:18+25mPakistan Railways
    Wed 18 Nov15:15+23mPakistan Railways
    Mon 16 Nov15:56+1h02Pakistan Railways
    Sat 14 Nov15:16+23mPakistan Railways
    Thu 12 Nov15:06+14mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +14m to +1h02. Every train at Alluwali →

  • 22Piplanscheduled 15:13+25m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov15:42+28mPakistan Railways
    Wed 18 Nov15:39+24mPakistan Railways
    Mon 16 Nov16:16+1h01Pakistan Railways
    Sat 14 Nov15:39+25mPakistan Railways
    Thu 12 Nov15:24+12mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +12m to +1h01. Every train at Piplan →

  • 23Kalur Kotscheduled 15:45+29m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov16:15+29mPakistan Railways
    Wed 18 Nov16:17+30mPakistan Railways
    Mon 16 Nov16:52+1h05Pakistan Railways
    Sat 14 Nov16:13+26mPakistan Railways
    Thu 12 Nov16:07+23mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +23m to +1h05. Every train at Kalur Kot →

  • 24Shah Alamscheduled 16:24+33m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov16:53+29mPakistan Railways
    Wed 18 Nov17:01+37mPakistan Railways
    Mon 16 Nov17:36+1h12Pakistan Railways
    Sat 14 Nov16:58+33mPakistan Railways
    Thu 12 Nov16:54+30mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +29m to +1h12. Every train at Shah Alam →

  • 25Darya Khanscheduled 16:57+37m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov17:32+33mPakistan Railways
    Wed 18 Nov17:39+41mPakistan Railways
    Mon 16 Nov18:17+1h18Pakistan Railways
    Sat 14 Nov17:36+37mPakistan Railways
    Thu 12 Nov17:27+31mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +31m to +1h18. Every train at Darya Khan →

  • 26Bhakkarscheduled 17:28+31m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov17:52+22mPakistan Railways
    Wed 18 Nov18:00+31mPakistan Railways
    Mon 16 Nov18:36+1h07Pakistan Railways
    Sat 14 Nov17:55+26mPakistan Railways
    Thu 12 Nov17:58+31mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +22m to +1h07. Every train at Bhakkar →

  • 27Behalscheduled 17:57+39m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov18:34+36mPakistan Railways
    Wed 18 Nov18:43+45mPakistan Railways
    Mon 16 Nov19:18+1h21Pakistan Railways
    Sat 14 Nov18:35+38mPakistan Railways
    Thu 12 Nov18:35+39mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +36m to +1h21. Every train at Behal →

  • 28Karor Lal Esanscheduled 18:18+48m4 days
    DayArrivedDelayRecorded by
    Fri 20 Nov19:07+47mPakistan Railways
    Wed 18 Novnot recorded—
    Mon 16 Nov19:49+1h29Pakistan Railways
    Sat 14 Nov19:08+48mPakistan Railways
    Thu 12 Nov19:02+45mPakistan Railways (journey record)

    Seen on 4 of 5 days, ranging +45m to +1h29. Every train at Karor Lal Esan →

  • 29Dorattascheduled 18:35+52m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov19:26+51mPakistan Railways
    Wed 18 Novarrived, time not recorded+1h01Pakistan Railways
    Mon 16 Nov20:11+1h36Pakistan Railways
    Sat 14 Nov19:28+52mPakistan Railways
    Thu 12 Nov19:23+49mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +49m to +1h36. Every train at Doratta →

  • 30Layyahscheduled 18:55+48m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov19:41+41mPakistan Railways
    Wed 18 Nov19:52+52mPakistan Railways
    Mon 16 Nov20:38+1h38Pakistan Railways
    Sat 14 Nov19:42+43mPakistan Railways
    Thu 12 Nov19:42+48mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +41m to +1h38. Every train at Layyah →

  • 31Kot Sultanscheduled 19:38+45m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov20:12+34mPakistan Railways
    Wed 18 Nov20:25+47mPakistan Railways
    Mon 16 Novarrived, time not recorded+1h24Pakistan Railways
    Sat 14 Nov20:23+45mPakistan Railways
    Thu 12 Nov20:17+39mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +34m to +1h24. Every train at Kot Sultan →

  • 32Ahsan Pur Ahpscheduled 20:00+40m4 days
    DayArrivedDelayRecorded by
    Fri 20 Nov20:28+27mPakistan Railways
    Wed 18 Nov20:41+41mPakistan Railways
    Mon 16 Nov21:19+1h19Pakistan Railways
    Sat 14 Nov20:39+39mPakistan Railways
    Thu 12 Novnot recorded—

    Seen on 4 of 5 days, ranging +27m to +1h19. Every train at Ahsan Pur Ahp →

  • 33Dera Dinpanahscheduled 20:15+36m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov20:40+24mPakistan Railways
    Wed 18 Nov20:53+37mPakistan Railways
    Mon 16 Nov21:30+1h15Pakistan Railways
    Sat 14 Nov20:51+36mPakistan Railways
    Thu 12 Nov20:46+32mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +24m to +1h15. Every train at Dera Dinpanah →

  • 34Kot Adduscheduled 20:30+33m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov20:53+21mPakistan Railways
    Wed 18 Nov21:09+38mPakistan Railways
    Mon 16 Nov21:44+1h12Pakistan Railways
    Sat 14 Nov21:05+33mPakistan Railways
    Thu 12 Nov21:02+32mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +21m to +1h12. Every train at Kot Addu →

  • 35Sanawanscheduled 20:50+46m4 days
    DayArrivedDelayRecorded by
    Fri 20 Nov21:20+30mPakistan Railways
    Wed 18 Nov21:44+47mPakistan Railways
    Mon 16 Novarrived, time not recorded+1h22Pakistan Railways
    Sat 14 Nov21:39+44mPakistan Railways
    Thu 12 Novnot recorded—

    Seen on 4 of 5 days, ranging +30m to +1h22. Every train at Sanawan →

  • 36Gurmanischeduled 21:00+44m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov21:37+37mPakistan Railways
    Wed 18 Nov21:52+52mPakistan Railways
    Mon 16 Nov22:20+1h20Pakistan Railways
    Sat 14 Nov21:45+44mPakistan Railways
    Thu 12 Nov21:41+42mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +37m to +1h20. Every train at Gurmani →

  • 37Mehmood Kotscheduled 21:10+47m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov21:52+41mPakistan Railways
    Wed 18 Nov22:06+55mPakistan Railways
    Mon 16 Nov22:35+1h24Pakistan Railways
    Sat 14 Nov21:57+47mPakistan Railways
    Thu 12 Nov21:54+44mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +41m to +1h24. Every train at Mehmood Kot →

  • 38Muzaffargarhscheduled 21:44+45m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov22:25+38mPakistan Railways
    Wed 18 Nov22:42+54mPakistan Railways
    Mon 16 Nov23:06+1h19Pakistan Railways
    Sat 14 Nov22:30+43mPakistan Railways
    Thu 12 Nov22:28+45mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +38m to +1h19. Every train at Muzaffargarh →

  • 39Sher Shah Jnscheduled 22:10+51m5 days
    DayArrivedDelayRecorded by
    Fri 20 Nov22:59+49mPakistan Railways
    Wed 18 Nov23:15+1h04Pakistan Railways
    Mon 16 Nov23:38+1h27Pakistan Railways
    Sat 14 Nov23:01+50mPakistan Railways
    Thu 12 Nov23:00+51mPakistan Railways (journey record)

    Seen on 5 of 5 days, ranging +49m to +1h27. Every train at Sher Shah Jn →

  • 40Multan Canttscheduled 22:30+59m4 days
    DayArrivedDelayRecorded by
    Fri 20 Nov23:19+50mTrain GPS
    Wed 18 Nov23:36+1h07Train GPS
    Mon 16 Nov23:55+1h26Pakistan Railways (journey record)
    Sat 14 Nov23:19+50mTrain GPS
    Thu 12 Novnot recorded—

    Seen on 4 of 5 days, ranging +50m to +1h26. Every train at Multan Cantt →

What the marks mean
  • Tap a station — each day’s arrival, delay and recorder
  • Green — within 15 minutes of the scheduled time
  • Amber — 16 to 45 minutes late
  • Red — over 45 minutes late
  • Hollow — not recorded that day
  • Grey — arrived, no delay figure
  • Dash (—) — no delay figure for this stop yet
  • Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
  • The starting station is not listed — a train does not arrive where it begins.

Common questions

Is Thall Express 130DN usually late?

Typically 66 minutes late arriving at Multan Cantt, measured across 32 recorded arrivals (1 Aug – 20 Nov 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.

How late is Thall Express 130DN on a bad day?

On the worst one run in ten, 96 minutes late into Multan Cantt, against a typical 66 minutes late. Both come from the same 32 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.

What time does Thall Express 130DN leave Rawalpindi?

07:00, on the current published timetable. It is booked into Multan Cantt at 22:30, the day it leaves. Those are booked times. The delay figures on this page are what we recorded against them.

How long does Thall Express 130DN take from Rawalpindi to Multan Cantt?

15h 30m on the timetable. In practice a typical run has taken 16h 36m, measured from recorded arrivals at Multan Cantt.

How many stops does Thall Express 130DN make?

40 on the current published timetable, from Rawalpindi to Multan Cantt. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.

All Rawalpindi–Multan trains →

Service history (first year, operating eras) is drawn from Wikipedia's List of Pakistan Railways trains, retrieved 15 August 2026, matched on train number.