130 Thall Express 130DN تھل ایکسپریس 130ڈاؤن
How late is it, usually?
median per recorded stop arrivalEvery figure here is a median, not an average: why we publish a median, not an average. What counts as on time, and why some figures here are blank, is set out in what on time means here, and every threshold behind it.
13 days of recorded arrivals.
Over 32 recorded arrivals (1 Aug – 20 Nov 2026), Thall Express 130DN has typically reached Multan Cantt around 23:36 the day it leaves — on the worst one run in ten, past 00:06 the day after it leaves, at Multan Cantt itself.
The “At Multan Cantt” tile above is the arrival at the end of the run; “Typical delay, any stop” averages every stop including the earlier ones, so it usually reads smaller. Where the time goes, below, shows every stop we have recorded.
How long does it take?
scheduled vs recordedScheduled 15h 30m — Rawalpindi to Multan Cantt. Typically 16h 36m, 1h 06m longer.
What these figures cover
- Scheduled — the current timetable, Rawalpindi 07:00 to Multan Cantt 22:30
- Typical journey — from the scheduled departure to the recorded arrival at Multan Cantt; the median of 32 runs
- Bad day — 17h 06m at the 90th percentile: nine runs in ten come in under it
- Keyline — the scheduled time. The solid bar is the typical journey, the faint bar behind it the bad day.
- Recorded arrivals: 1 August to 20 November 2026.
- End to end. For a shorter leg, the stop times are in the timetable below.
Which day is worst?
mean minutes late per recorded arrival, 8-week windowThis is a mean over an 8-week window, not the median (typical) figure above — the two are not directly comparable.
Where the time goes
most of it lost after RawalpindiLeaves Rawalpindi 17 min early · reaches Multan Cantt +1h 06m — +1h 23m lost along the way.
- Rawalpindi07:00راولپِنڈى17 min early
- Golra Sharif07:19گولڑہ شریف+14 min
- Taxila Cantt07:41ٹیکسلا کینٹ+24 min
- Wah07:57واہ کینٹ+22 min
- Hasan Abdal08:03حسن ابدال+28 min
- Faqirabad08:23فقیرآباد+41 min
- Attock City Jn08:45اٹک سٹی جنکشن+40 min
- Basal Jn09:38بسال جنکشن+37 min
- Domel09:45ڈومیل+40 min
- Nammal09:59نمل+38 min
- Jand Jn10:26جنڈ جنکشن+24 min
- Jhammat10:51جھمٹ+42 min
- Chhab11:01چھب+45 min
- Khatakbad11:11خٹک آباد+49 min
- Injra11:19انجرا+1h 03m
- Mukhad Road11:33مکھڈ روڈ+1h
- Daud Khel Jn12:26داؤد خیل+1h 02m
- Pai Khel12:51پائ خیل+1h
- Mian Wali13:35میانوالی+50 min
- Kundian Jn14:25کندیاں+35 min
- Alluwali14:54علو والی+38 min
- Piplan15:15پپلاں+38 min
- Kalur Kot15:47کلور کوٹ+44 min
- Shah Alam16:25شاہ عالم+48 min
- Darya Khan16:59دریا خان+51 min
- Bhakkar17:30بھکر+42 min
- Behal17:58بیہل+58 min
- Karor Lal Esan18:20کرور لعل عیسن+1h 08m
- Doratta18:36دورتہ+1h 11m
- Layyah19:00لیّہ+1h 06m
- Kot Sultan19:39کوٹ سلطان+57 min
- Ahsan Pur Ahp20:01احسن پور+51 min
- Dera Dinpanah20:16ڈیرہ دین پناہ+48 min
- Kot Addu20:33کوٹ ادو+46 min
- Sanawan20:51سنا وان+1h 01m
- Gurmani21:01گرمانی+57 min
- Mehmood Kot21:11محمود کوٹ+58 min
- Muzaffargarh21:48مظفر گڑھ+58 min
- Sher Shah Jn22:11شیرشاہ جنکشن+1h 04m
- Multan Cantt22:30ملتان کینٹ+1h 06m
Where it stands longest past the timetableshortest to longest recorded
- Kot Adduscheduled 3 min7–12 min
- Hasan Abdalscheduled 2 min1–25 min
- Layyahscheduled 5 min3 min–1h 57m
- Bhakkarscheduled 2 min3–8 min
- Jand Jnscheduled 2 min3–40 min
What the marks mean
- Solid bar — the typical delay at that stop (median of recorded arrivals)
- Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
- No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
- — (no solid bar either) — fewer than 3 recorded runs at that stop
- A negative figure means the train typically ran early at that stop, not late
- Band — the shortest and the longest stand recorded at that stop. The train has left as early as the first figure.
- Keyline — the scheduled stop, arrival to departure on the timetable below.
- Why a train stands is not recorded — a crossing, a loco change and a red signal all look the same on the clock.
- The five stops that stand longest past the timetable, not every stop — most routes have more. A stop qualifies with 7 or more runs timed in and out, and is skipped where the timetable books no stop, books one over an hour, or where any recorded stand ran past three hours.
- Most time is lost between Rawalpindi and Golra Sharif (+31 min)
- Every stop on the current timetable is listed, in order, measured or not.
Timetable
scheduled → actual, 20 November 2026 runThe second time in a cell is what actually happened on the 20 November 2026 run.
| # | Station | Arrival | Departure |
|---|---|---|---|
| 1 | Rawalpindi | — | 07:00 |
| 2 | Golra Sharif | 07:17 → 07:20·PR | 07:19 → 07:23 |
| 3 | Taxila Cantt | 07:39 → 07:55·PR | 07:41 |
| 4 | Wah | 07:56 → 08:10·PR | 07:57 |
| 5 | Hasan Abdal | 08:01 → 08:17·PR | 08:03 → 08:20 |
| 6 | Faqirabad | 08:22 → 08:53·PR | 08:23 |
| 7 | Attock City Jn | 08:40 → 09:12·PR | 08:45 → 09:12 |
| 8 | Basal Jn | 09:37 → 09:55·PR | 09:38 |
| 9 | Domel | 09:44 → 10:05·PR | 09:45 |
| 10 | Nammal | 09:58 → 10:19·PR | 09:59 |
| 11 | Jand Jn | 10:24 → 10:32·PR | 10:26 |
| 12 | Jhammat | 10:50 → 11:16·PR | 10:51 |
| 13 | Chhab | 11:00 → 11:30·PR | 11:01 |
| 14 | Khatakbad | 11:10 → 11:46·PR | 11:11 |
| 15 | Injra | 11:18 | 11:19 |
| 16 | Mukhad Road | 11:32 → 12:20·PR | 11:33 → 12:21 |
| 17 | Daud Khel Jn | 12:25 → 13:11·PR | 12:26 → 13:16 |
| 18 | Pai Khel | 12:50 → 13:35·PR | 12:51 |
| 19 | Mian Wali | 13:30 → 14:06·PR | 13:35 → 14:06 |
| 20 | Kundian Jn | 14:05 → 14:58·PR | 14:25 |
| 21 | Alluwali | 14:53 → 15:18·PR | 14:54 |
| 22 | Piplan | 15:13 → 15:42·PR | 15:15 |
| 23 | Kalur Kot | 15:45 → 16:15·PR | 15:47 |
| 24 | Shah Alam | 16:24 → 16:53·PR | 16:25 |
| 25 | Darya Khan | 16:57 → 17:32·PR | 16:59 |
| 26 | Bhakkar | 17:28 → 17:52·PR | 17:30 → 17:52 |
| 27 | Behal | 17:57 → 18:34·PR | 17:58 |
| 28 | Karor Lal Esan | 18:18 → 19:07·PR | 18:20 → 19:07 |
| 29 | Doratta | 18:35 → 19:26·PR | 18:36 |
| 30 | Layyah | 18:55 → 19:41·PR | 19:00 |
| 31 | Kot Sultan | 19:38 → 20:12·PR | 19:39 → 20:15 |
| 32 | Ahsan Pur Ahp | 20:00 → 20:28·PR | 20:01 |
| 33 | Dera Dinpanah | 20:15 → 20:40·PR | 20:16 |
| 34 | Kot Addu | 20:30 → 20:53·PR | 20:33 |
| 35 | Sanawan | 20:50 → 21:20·PR | 20:51 |
| 36 | Gurmani | 21:00 → 21:37·PR | 21:01 |
| 37 | Mehmood Kot | 21:10 → 21:52·PR | 21:11 |
| 38 | Muzaffargarh | 21:44 → 22:25·PR | 21:48 |
| 39 | Sher Shah Jn | 22:10 → 22:59·PR | 22:11 |
| 40 | Multan Cantt | 22:30 → 23:19 | 22:30 → 23:23 |
What the marks mean
- → 21:28 — actual time on the 20 November 2026 run
- ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
- +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
- Blank — not recorded
Station by station, last 5 days
187 arrivals recordedOne mark per day, newest first.
A run’s GPS trail is decoded after the journey completes — recent days may link later.
2Golra Sharifscheduled 07:17+9m5 days
Day Arrived Delay Recorded by Fri 20 Nov 07:20 +3m Pakistan Railways Wed 18 Nov 07:25 +7m Pakistan Railways Mon 16 Nov 07:54 +36m Pakistan Railways Sat 14 Nov 07:35 +18m Pakistan Railways (journey record) Thu 12 Nov 07:25 +9m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +3m to +36m. Every train at Golra Sharif →
3Taxila Canttscheduled 07:39+17m5 days
Day Arrived Delay Recorded by Fri 20 Nov 07:55 +14m Pakistan Railways Wed 18 Nov 07:55 +15m Pakistan Railways Mon 16 Nov 08:20 +41m Pakistan Railways Sat 14 Nov 08:04 +26m Pakistan Railways (journey record) Thu 12 Nov 07:56 +17m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +14m to +41m. Every train at Taxila Cantt →
4Wahscheduled 07:56+15m5 days
Day Arrived Delay Recorded by Fri 20 Nov 08:10 +13m Pakistan Railways Wed 18 Nov 08:11 +14m Pakistan Railways Mon 16 Nov 08:35 +38m Pakistan Railways Sat 14 Nov 08:19 +23m Pakistan Railways (journey record) Thu 12 Nov 08:10 +15m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +13m to +38m. Every train at Wah →
5Hasan Abdalscheduled 08:01+17m5 days
Day Arrived Delay Recorded by Fri 20 Nov 08:17 +15m Pakistan Railways Wed 18 Nov 08:18 +16m Pakistan Railways Mon 16 Nov 08:44 +41m Pakistan Railways Sat 14 Nov 08:26 +25m Pakistan Railways (journey record) Thu 12 Nov 08:17 +17m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +15m to +41m. Every train at Hasan Abdal →
6Faqirabadscheduled 08:22+38m5 days
Day Arrived Delay Recorded by Fri 20 Nov 08:53 +30m Pakistan Railways Wed 18 Nov 09:01 +38m Pakistan Railways Mon 16 Nov 09:13 +50m Pakistan Railways Sat 14 Nov 08:59 +38m Pakistan Railways (journey record) Thu 12 Nov 09:00 +38m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +30m to +50m. Every train at Faqirabad →
7Attock City Jnscheduled 08:40+41m5 days
Day Arrived Delay Recorded by Fri 20 Nov 09:12 +27m Pakistan Railways Wed 18 Nov arrived, time not recorded +41m Pakistan Railways Mon 16 Nov 09:34 +49m Pakistan Railways Sat 14 Nov arrived, time not recorded +41m Pakistan Railways Thu 12 Nov 09:16 +36m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +27m to +49m. Every train at Attock City Jn →
8Basal Jnscheduled 09:37+29m5 days
Day Arrived Delay Recorded by Fri 20 Nov 09:55 +17m Pakistan Railways Wed 18 Nov 10:06 +29m Pakistan Railways Mon 16 Nov 10:31 +53m Pakistan Railways Sat 14 Nov 10:15 +37m Pakistan Railways Thu 12 Nov 09:56 +20m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +17m to +53m. Every train at Basal Jn →
9Domelscheduled 09:44+30m5 days
Day Arrived Delay Recorded by Fri 20 Nov 10:05 +21m Pakistan Railways Wed 18 Nov 10:14 +30m Pakistan Railways Mon 16 Nov 10:40 +56m Pakistan Railways Sat 14 Nov 10:18 +34m Pakistan Railways Thu 12 Nov 10:04 +20m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +20m to +56m. Every train at Domel →
10Nammalscheduled 09:58+32m4 days
Day Arrived Delay Recorded by Fri 20 Nov 10:19 +20m Pakistan Railways Wed 18 Nov 10:29 +30m Pakistan Railways Mon 16 Nov 10:58 +59m Pakistan Railways Sat 14 Nov 10:31 +33m Pakistan Railways Thu 12 Nov not recorded — Seen on 4 of 5 days, ranging +20m to +59m. Every train at Nammal →
11Jand Jnscheduled 10:24+18m5 days
Day Arrived Delay Recorded by Fri 20 Nov 10:32 +7m Pakistan Railways Wed 18 Nov 10:43 +18m Pakistan Railways Mon 16 Nov 11:12 +47m Pakistan Railways Sat 14 Nov 10:44 +18m Pakistan Railways Thu 12 Nov 10:27 +3m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +3m to +47m. Every train at Jand Jn →
12Jhammatscheduled 10:50+30m4 days
Day Arrived Delay Recorded by Fri 20 Nov 11:16 +27m Pakistan Railways Wed 18 Nov 11:20 +31m Pakistan Railways Mon 16 Nov 11:54 +1h04 Pakistan Railways Sat 14 Nov 11:20 +29m Pakistan Railways Thu 12 Nov not recorded — Seen on 4 of 5 days, ranging +27m to +1h04. Every train at Jhammat →
13Chhabscheduled 11:00+31m5 days
Day Arrived Delay Recorded by Fri 20 Nov 11:30 +30m Pakistan Railways Wed 18 Nov 11:34 +33m Pakistan Railways Mon 16 Nov 12:09 +1h09 Pakistan Railways Sat 14 Nov 11:31 +31m Pakistan Railways Thu 12 Nov 11:19 +19m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +19m to +1h09. Every train at Chhab →
14Khatakbadscheduled 11:10+36m5 days
Day Arrived Delay Recorded by Fri 20 Nov 11:46 +36m Pakistan Railways Wed 18 Nov 11:49 +38m Pakistan Railways Mon 16 Nov 12:25 +1h14 Pakistan Railways Sat 14 Nov 11:46 +35m Pakistan Railways Thu 12 Nov 11:34 +24m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +24m to +1h14. Every train at Khatakbad →
15Injrascheduled 11:18+45m3 days
Day Arrived Delay Recorded by Fri 20 Nov arrived, time not recorded +45m Pakistan Railways Wed 18 Nov arrived, time not recorded +45m Pakistan Railways Mon 16 Nov 12:35 +1h18 Pakistan Railways Sat 14 Nov not recorded — Thu 12 Nov not recorded — Seen on 3 of 5 days, ranging +45m to +1h18. Every train at Injra →
16Mukhad Roadscheduled 11:32+47m5 days
Day Arrived Delay Recorded by Fri 20 Nov 12:20 +48m Pakistan Railways Wed 18 Nov 12:19 +47m Pakistan Railways Mon 16 Nov 12:54 +1h22 Pakistan Railways Sat 14 Nov arrived, time not recorded +47m Pakistan Railways Thu 12 Nov 12:07 +36m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +36m to +1h22. Every train at Mukhad Road →
17Daud Khel Jnscheduled 12:25+43m5 days
Day Arrived Delay Recorded by Fri 20 Nov 13:11 +46m Pakistan Railways Wed 18 Nov 13:09 +43m Pakistan Railways Mon 16 Nov 13:45 +1h19 Pakistan Railways Sat 14 Nov 13:07 +41m Pakistan Railways Thu 12 Nov 12:58 +33m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +33m to +1h19. Every train at Daud Khel Jn →
18Pai Khelscheduled 12:50+43m5 days
Day Arrived Delay Recorded by Fri 20 Nov 13:35 +44m Pakistan Railways Wed 18 Nov 13:32 +43m Pakistan Railways Mon 16 Nov 14:12 +1h22 Pakistan Railways Sat 14 Nov 13:30 +39m Pakistan Railways Thu 12 Nov 13:19 +29m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +29m to +1h22. Every train at Pai Khel →
19Mian Walischeduled 13:30+31m5 days
Day Arrived Delay Recorded by Fri 20 Nov 14:06 +31m Pakistan Railways Wed 18 Nov 14:05 +30m Pakistan Railways Mon 16 Nov 14:45 +1h10 Pakistan Railways Sat 14 Nov 14:08 +33m Pakistan Railways Thu 12 Nov 13:53 +24m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +24m to +1h10. Every train at Mian Wali →
20Kundian Jnscheduled 14:05+32m5 days
Day Arrived Delay Recorded by Fri 20 Nov 14:58 +34m Pakistan Railways Wed 18 Nov 14:52 +27m Pakistan Railways Mon 16 Nov 14:59 +55m Pakistan Railways Sat 14 Nov 14:56 +32m Pakistan Railways Thu 12 Nov 14:20 +15m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +15m to +55m. Every train at Kundian Jn →
21Alluwalischeduled 14:53+23m5 days
Day Arrived Delay Recorded by Fri 20 Nov 15:18 +25m Pakistan Railways Wed 18 Nov 15:15 +23m Pakistan Railways Mon 16 Nov 15:56 +1h02 Pakistan Railways Sat 14 Nov 15:16 +23m Pakistan Railways Thu 12 Nov 15:06 +14m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +14m to +1h02. Every train at Alluwali →
22Piplanscheduled 15:13+25m5 days
Day Arrived Delay Recorded by Fri 20 Nov 15:42 +28m Pakistan Railways Wed 18 Nov 15:39 +24m Pakistan Railways Mon 16 Nov 16:16 +1h01 Pakistan Railways Sat 14 Nov 15:39 +25m Pakistan Railways Thu 12 Nov 15:24 +12m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +12m to +1h01. Every train at Piplan →
23Kalur Kotscheduled 15:45+29m5 days
Day Arrived Delay Recorded by Fri 20 Nov 16:15 +29m Pakistan Railways Wed 18 Nov 16:17 +30m Pakistan Railways Mon 16 Nov 16:52 +1h05 Pakistan Railways Sat 14 Nov 16:13 +26m Pakistan Railways Thu 12 Nov 16:07 +23m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +23m to +1h05. Every train at Kalur Kot →
24Shah Alamscheduled 16:24+33m5 days
Day Arrived Delay Recorded by Fri 20 Nov 16:53 +29m Pakistan Railways Wed 18 Nov 17:01 +37m Pakistan Railways Mon 16 Nov 17:36 +1h12 Pakistan Railways Sat 14 Nov 16:58 +33m Pakistan Railways Thu 12 Nov 16:54 +30m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +29m to +1h12. Every train at Shah Alam →
25Darya Khanscheduled 16:57+37m5 days
Day Arrived Delay Recorded by Fri 20 Nov 17:32 +33m Pakistan Railways Wed 18 Nov 17:39 +41m Pakistan Railways Mon 16 Nov 18:17 +1h18 Pakistan Railways Sat 14 Nov 17:36 +37m Pakistan Railways Thu 12 Nov 17:27 +31m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +31m to +1h18. Every train at Darya Khan →
26Bhakkarscheduled 17:28+31m5 days
Day Arrived Delay Recorded by Fri 20 Nov 17:52 +22m Pakistan Railways Wed 18 Nov 18:00 +31m Pakistan Railways Mon 16 Nov 18:36 +1h07 Pakistan Railways Sat 14 Nov 17:55 +26m Pakistan Railways Thu 12 Nov 17:58 +31m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +22m to +1h07. Every train at Bhakkar →
27Behalscheduled 17:57+39m5 days
Day Arrived Delay Recorded by Fri 20 Nov 18:34 +36m Pakistan Railways Wed 18 Nov 18:43 +45m Pakistan Railways Mon 16 Nov 19:18 +1h21 Pakistan Railways Sat 14 Nov 18:35 +38m Pakistan Railways Thu 12 Nov 18:35 +39m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +36m to +1h21. Every train at Behal →
28Karor Lal Esanscheduled 18:18+48m4 days
Day Arrived Delay Recorded by Fri 20 Nov 19:07 +47m Pakistan Railways Wed 18 Nov not recorded — Mon 16 Nov 19:49 +1h29 Pakistan Railways Sat 14 Nov 19:08 +48m Pakistan Railways Thu 12 Nov 19:02 +45m Pakistan Railways (journey record) Seen on 4 of 5 days, ranging +45m to +1h29. Every train at Karor Lal Esan →
29Dorattascheduled 18:35+52m5 days
Day Arrived Delay Recorded by Fri 20 Nov 19:26 +51m Pakistan Railways Wed 18 Nov arrived, time not recorded +1h01 Pakistan Railways Mon 16 Nov 20:11 +1h36 Pakistan Railways Sat 14 Nov 19:28 +52m Pakistan Railways Thu 12 Nov 19:23 +49m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +49m to +1h36. Every train at Doratta →
30Layyahscheduled 18:55+48m5 days
Day Arrived Delay Recorded by Fri 20 Nov 19:41 +41m Pakistan Railways Wed 18 Nov 19:52 +52m Pakistan Railways Mon 16 Nov 20:38 +1h38 Pakistan Railways Sat 14 Nov 19:42 +43m Pakistan Railways Thu 12 Nov 19:42 +48m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +41m to +1h38. Every train at Layyah →
31Kot Sultanscheduled 19:38+45m5 days
Day Arrived Delay Recorded by Fri 20 Nov 20:12 +34m Pakistan Railways Wed 18 Nov 20:25 +47m Pakistan Railways Mon 16 Nov arrived, time not recorded +1h24 Pakistan Railways Sat 14 Nov 20:23 +45m Pakistan Railways Thu 12 Nov 20:17 +39m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +34m to +1h24. Every train at Kot Sultan →
32Ahsan Pur Ahpscheduled 20:00+40m4 days
Day Arrived Delay Recorded by Fri 20 Nov 20:28 +27m Pakistan Railways Wed 18 Nov 20:41 +41m Pakistan Railways Mon 16 Nov 21:19 +1h19 Pakistan Railways Sat 14 Nov 20:39 +39m Pakistan Railways Thu 12 Nov not recorded — Seen on 4 of 5 days, ranging +27m to +1h19. Every train at Ahsan Pur Ahp →
33Dera Dinpanahscheduled 20:15+36m5 days
Day Arrived Delay Recorded by Fri 20 Nov 20:40 +24m Pakistan Railways Wed 18 Nov 20:53 +37m Pakistan Railways Mon 16 Nov 21:30 +1h15 Pakistan Railways Sat 14 Nov 20:51 +36m Pakistan Railways Thu 12 Nov 20:46 +32m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +24m to +1h15. Every train at Dera Dinpanah →
34Kot Adduscheduled 20:30+33m5 days
Day Arrived Delay Recorded by Fri 20 Nov 20:53 +21m Pakistan Railways Wed 18 Nov 21:09 +38m Pakistan Railways Mon 16 Nov 21:44 +1h12 Pakistan Railways Sat 14 Nov 21:05 +33m Pakistan Railways Thu 12 Nov 21:02 +32m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +21m to +1h12. Every train at Kot Addu →
35Sanawanscheduled 20:50+46m4 days
Day Arrived Delay Recorded by Fri 20 Nov 21:20 +30m Pakistan Railways Wed 18 Nov 21:44 +47m Pakistan Railways Mon 16 Nov arrived, time not recorded +1h22 Pakistan Railways Sat 14 Nov 21:39 +44m Pakistan Railways Thu 12 Nov not recorded — Seen on 4 of 5 days, ranging +30m to +1h22. Every train at Sanawan →
36Gurmanischeduled 21:00+44m5 days
Day Arrived Delay Recorded by Fri 20 Nov 21:37 +37m Pakistan Railways Wed 18 Nov 21:52 +52m Pakistan Railways Mon 16 Nov 22:20 +1h20 Pakistan Railways Sat 14 Nov 21:45 +44m Pakistan Railways Thu 12 Nov 21:41 +42m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +37m to +1h20. Every train at Gurmani →
37Mehmood Kotscheduled 21:10+47m5 days
Day Arrived Delay Recorded by Fri 20 Nov 21:52 +41m Pakistan Railways Wed 18 Nov 22:06 +55m Pakistan Railways Mon 16 Nov 22:35 +1h24 Pakistan Railways Sat 14 Nov 21:57 +47m Pakistan Railways Thu 12 Nov 21:54 +44m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +41m to +1h24. Every train at Mehmood Kot →
38Muzaffargarhscheduled 21:44+45m5 days
Day Arrived Delay Recorded by Fri 20 Nov 22:25 +38m Pakistan Railways Wed 18 Nov 22:42 +54m Pakistan Railways Mon 16 Nov 23:06 +1h19 Pakistan Railways Sat 14 Nov 22:30 +43m Pakistan Railways Thu 12 Nov 22:28 +45m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +38m to +1h19. Every train at Muzaffargarh →
39Sher Shah Jnscheduled 22:10+51m5 days
Day Arrived Delay Recorded by Fri 20 Nov 22:59 +49m Pakistan Railways Wed 18 Nov 23:15 +1h04 Pakistan Railways Mon 16 Nov 23:38 +1h27 Pakistan Railways Sat 14 Nov 23:01 +50m Pakistan Railways Thu 12 Nov 23:00 +51m Pakistan Railways (journey record) Seen on 5 of 5 days, ranging +49m to +1h27. Every train at Sher Shah Jn →
40Multan Canttscheduled 22:30+59m4 days
Day Arrived Delay Recorded by Fri 20 Nov 23:19 +50m Train GPS Wed 18 Nov 23:36 +1h07 Train GPS Mon 16 Nov 23:55 +1h26 Pakistan Railways (journey record) Sat 14 Nov 23:19 +50m Train GPS Thu 12 Nov not recorded — Seen on 4 of 5 days, ranging +50m to +1h26. Every train at Multan Cantt →
What the marks mean
- Tap a station — each day’s arrival, delay and recorder
- Green — within 15 minutes of the scheduled time
- Amber — 16 to 45 minutes late
- Red — over 45 minutes late
- Hollow — not recorded that day
- Grey — arrived, no delay figure
- Dash (—) — no delay figure for this stop yet
- Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
- The starting station is not listed — a train does not arrive where it begins.
Common questions
Is Thall Express 130DN usually late?
Typically 66 minutes late arriving at Multan Cantt, measured across 32 recorded arrivals (1 Aug – 20 Nov 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.
How late is Thall Express 130DN on a bad day?
On the worst one run in ten, 96 minutes late into Multan Cantt, against a typical 66 minutes late. Both come from the same 32 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.
What time does Thall Express 130DN leave Rawalpindi?
07:00, on the current published timetable. It is booked into Multan Cantt at 22:30, the day it leaves. Those are booked times. The delay figures on this page are what we recorded against them.
How long does Thall Express 130DN take from Rawalpindi to Multan Cantt?
15h 30m on the timetable. In practice a typical run has taken 16h 36m, measured from recorded arrivals at Multan Cantt.
How many stops does Thall Express 130DN make?
40 on the current published timetable, from Rawalpindi to Multan Cantt. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.
Other trains on this route
All Rawalpindi–Multan trains →Service history (first year, operating eras) is drawn from Wikipedia's List of Pakistan Railways trains, retrieved 15 August 2026, matched on train number.