Bahawalpur to Rawalpindi
Hazara Express 11UP — within 15 minutes of the scheduled time 27% of the time, typically 45 minutes late, over 12 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Bahawalpur to Rawalpindi it typically adds 1h 43m, from 31 recorded runs. At Rawalpindi it has typically arrived 164 minutes late, from 33 recorded runs.
Every train, compared
8 of 9 with 7+ daysOver this leg is the CHANGE in a train's delay between Bahawalpur and Rawalpindi on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Bahawalpur — no booked arrival at Bahawalpur to measure from at all. Figures cover runs recorded between 30 July 2026 and 6 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 47Rehman Baba Express 47UP | 02:00 +1d | 14:25 +1d | 12h 25m | 1,078 km | +1h 43m | 10% | adds 1h 24m · 36 |
| 39Jaffar Express 39UP | 02:33 +1d | 16:00 +1d | 13h 27m | not measured yet | +1h 55m | 0% | adds 1h 51m · 20 |
| 45Pakistan Express 45UP | 03:55 +1d | 17:35 +1d | 13h 40m | 671 km | +2h 25m | 2% | adds 1h 39m · 17 |
| 7Tezgam 7UP | 07:20 +1d | 20:00 +1d | 12h 40m | 727 km | +1h 59m | 5% | adds 1h 54m · 29 |
| 35Sir Sayyed Express 35UP | 09:32 +1d | 21:30 +1d | 11h 58m | not measured yet | — | — | no data |
| 5Green Line 5UP | 10:22 +1d | 20:35 +1d | 10h 13m | 680 km | +41 min | 27% | adds 1h 17m · 31 |
| 1Khyber Mail 1UP | 12:00 +1d | 01:20 +2d | 13h 20m | 736 km | +1h 39m | 9% | adds 1h 49m · 21 |
| 11Hazara Express 11UP | 22:27 | 13:35 +1d | 15h 08m | 686 km | +45 min | 27% | adds 1h 43m · 31 |
| 13Awam Express 13UP | 23:56 | 13:20 +1d | 13h 24m | 737 km | +1h 42m | 6% | adds 1h 29m · 36 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ02:00 +1d→14:25 +1d12h 25m10% on time · +1h 43madds 1h 24m over this leg · 36 runs
- Jaffar Express 39UP39جعفر ایکسپریس 39 اپ02:33 +1d→16:00 +1d13h 27m0% on time · +1h 55madds 1h 51m over this leg · 20 runs
- Pakistan Express 45UP45پاکستان ایکسپریس 45 اپ03:55 +1d→17:35 +1d13h 40m2% on time · +2h 25madds 1h 39m over this leg · 17 runs
- Tezgam 7UP7تيزگام 7 اپ07:20 +1d→20:00 +1d12h 40m5% on time · +1h 59madds 1h 54m over this leg · 29 runs
- Sir Sayyed Express 35UP35سر سید ایکپریس 35اپ09:32 +1d→21:30 +1d11h 58mno delay figure yetno data over this leg
- Green Line 5UP5گرين لائن5 اپ10:22 +1d→20:35 +1d10h 13m27% on time · +41 minadds 1h 17m over this leg · 31 runs
- Khyber Mail 1UP1خیبر میل 1 اپ12:00 +1d→01:20 +2d13h 20m9% on time · +1h 39madds 1h 49m over this leg · 21 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ22:27→13:35 +1d15h 08m27% on time · +45 minadds 1h 43m over this leg · 31 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ23:56→13:20 +1d13h 24m6% on time · +1h 42madds 1h 29m over this leg · 36 runs
Travelling the other way? Rawalpindi to Bahawalpur trains →
Common questions
How many trains run from Bahawalpur to Rawalpindi?
9 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Bahawalpur to Rawalpindi?
Green Line 5UP, booked at 10h 13m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Bahawalpur to Rawalpindi is most likely to be on time?
Hazara Express 11UP has the best recorded punctuality of the services we hold enough history for: 27% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 45 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 8 of 9 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Bahawalpur to Rawalpindi?
Yes. 3 of the 9 scheduled services are booked to arrive on a later day than they depart: Khyber Mail 1UP, Hazara Express 11UP, Awam Express 13UP.
Do trains lose time between Bahawalpur and Rawalpindi?
Typically yes. Tezgam 7UP adds about 1h 54m to its delay over this leg, measured across 29 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Bahawalpur to Rawalpindi by train?
It is between 671 and 1,078 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 7 of the 9 services; the rest of the track on this route has not been traced yet.
Are these Bahawalpur to Rawalpindi timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.