Bahawalpur to Samasata Jn
Shalimar Express 28DN — within 15 minutes of the scheduled time 39% of the time, typically 27 minutes late, over 7 days of recorded runs across every stop of its full journey, not this segment alone. At Samasata Jn it has typically arrived 4 minutes late, from 9 recorded runs.
Every train, compared
6 of 8 with 7+ daysOver this leg is the CHANGE in a train's delay between Bahawalpur and Samasata Jn on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Bahawalpur — no booked arrival at Bahawalpur to measure from at all. Figures cover runs recorded between 30 July 2026 and 30 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 14Awam Express 14DN | 02:14 +1d | 02:30 +1d | 16 min | 16 km | +2h 14m | 8% | adds 1 min · 37 |
| 48Rehman Baba Express 48DN | 02:45 +1d | 02:58 +1d | 13 min | 16 km | +1h 56m | 14% | adds 4 min · 19 |
| 12Hazara Express 12DN | 08:45 +1d | 08:58 +1d | 13 min | 16 km | — | — | adds 2 min · 34 |
| 28Shalimar Express 28DN | 14:27 | 14:40 | 13 min | not measured yet | +27 min | 39% | no data |
| 2Khyber Mail 2DN | 15:00 +1d | 15:15 +1d | 15 min | 16 km | +2h 12m | 8% | no change · 27 |
| 38Fareed Express 38DN | 16:18 | 16:35 | 17 min | not measured yet | +44 min | 16% | makes up 1 min · 29 |
| 26Bahauddin Zikria Express 26DN | 17:50 | 18:04 | 14 min | 16 km | — | — | adds 1 min · 24 |
| 40Jaffar Express 40DN | 23:38 | 00:10 +1d | 32 min | 16 km | +1h | 24% | makes up 17 min · 13 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون02:14 +1d→02:30 +1d16 min8% on time · +2h 14madds 1 min over this leg · 37 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن02:45 +1d→02:58 +1d13 min14% on time · +1h 56madds 4 min over this leg · 19 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن08:45 +1d→08:58 +1d13 minno delay figure yetadds 2 min over this leg · 34 runs
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون14:27→14:4013 min39% on time · +27 minno data over this leg
- Khyber Mail 2DN2خیبر میل 2 ڈائون15:00 +1d→15:15 +1d15 min8% on time · +2h 12mno change over this leg · 27 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون16:18→16:3517 min16% on time · +44 minmakes up 1 min over this leg · 29 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون17:50→18:0414 minno delay figure yetadds 1 min over this leg · 24 runs
- Jaffar Express 40DN40جعفر ایکسپریس 40 ڈائون23:38→00:10 +1d32 min24% on time · +1hmakes up 17 min over this leg · 13 runs
Travelling the other way? Samasata Jn to Bahawalpur trains →
Common questions
How many trains run from Bahawalpur to Samasata Jn?
8 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Bahawalpur to Samasata Jn?
Rehman Baba Express 48DN, booked at 13 min for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Bahawalpur to Samasata Jn is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 39% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 27 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 6 of 8 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Bahawalpur to Samasata Jn?
Yes. 1 of the 8 scheduled services is booked to arrive on a later day than it departs: Jaffar Express 40DN.
Do trains lose time between Bahawalpur and Samasata Jn?
Typically yes. Rehman Baba Express 48DN adds about 4 min to its delay over this leg, measured across 19 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Bahawalpur to Samasata Jn by train?
It is about 16 km along the track. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 6 of the 8 services; the rest of the track on this route has not been traced yet.
Are these Bahawalpur to Samasata Jn timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.