latetrains.pkLate, on record41 live
Stations/Ghotki/Ghotki → Bahawalpur

Ghotki to Bahawalpur

11 scheduled services · fastest about 3h 56m · 292 km to 299 km by route (measured on 10 of 11)
Ghotki se Bahawalpur ki train — timing aur delay record.
11Scheduled services
3h 56mFastest booked
6h 12mSlowest booked
3Overnight services
9 of 11With a delay record
GHOTKIBAHAWALPURGHOTKI
گھوٹکی ۔ بہاولپور ۔ گھوٹکی
Most reliable choice

Hazara Express 11UP — within 15 minutes of the scheduled time 24% of the time, typically 53 minutes late, over 8 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Ghotki to Bahawalpur it typically makes up 11 min, from 35 recorded runs. At Bahawalpur it has typically arrived 72 minutes late, from 42 recorded runs.

Every train, compared

9 of 11 with 7+ days

Over this leg is the CHANGE in a train's delay between Ghotki and Bahawalpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Ghotki — no booked arrival at Ghotki to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 September 2026. why a delay figure changes along the route.

TrainDepartsArrivesDurationDistanceTypical delayOn-timeOver this leg
9Allama Iqbal Express 9UP01:12 +1d05:36 +1d4h 24m295 km+3h 58m4%adds 20 min · 35
7Tezgam 7UP02:41 +1d07:16 +1d4h 35m292 km+2h 13m4%makes up 11 min · 35
25Bahauddin Zikria Express 25UP03:48 +1d08:41 +1d4h 53m296 km——adds 13 min · 21
37Fareed Express 37UP05:43 +1d11:55 +1d6h 12m296 km+1h 25m6%makes up 42 min · 27
1Khyber Mail 1UP06:53 +1d11:55 +1d5h 02m299 km+1h 31m9%adds 46 min · 32
27Shalimar Express 27UP14:4318:393h 56m299 km+57 min20%adds 22 min · 24
11Hazara Express 11UP17:0222:225h 20m297 km+53 min24%makes up 11 min · 35
13Awam Express 13UP18:1123:545h 43m299 km+1h 50m5%makes up 15 min · 38
47Rehman Baba Express 47UP21:3001:55 +1d4h 25m296 km+1h 32m11%adds 17 min · 32
39Jaffar Express 39UP22:0002:30 +1d4h 30mnot measured yet+1h 46m0%makes up 7 min · 18
45Pakistan Express 45UP22:4503:50 +1d5h 05m295 km——makes up 25 min · 38
What the marks mean
  • Departs · Arrives — scheduled local times, published Pakistan Railways timetable
  • +1d — a stop on a later day of the train's own run, not a date
  • Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
  • — — fewer than 7 days of recorded runs for that train
  • Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
  • A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
  • — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.

Every service in detail

Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.

Travelling the other way? Bahawalpur to Ghotki trains →

Common questions

How many trains run from Ghotki to Bahawalpur?

11 scheduled services on the current published timetable. That is what is booked to run, not what ran today.

Which is the fastest train from Ghotki to Bahawalpur?

Shalimar Express 27UP, booked at 3h 56m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.

Which train from Ghotki to Bahawalpur is most likely to be on time?

Hazara Express 11UP has the best recorded punctuality of the services we hold enough history for: 24% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 53 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 11 services on this route currently have enough recorded history to rank at all.

Is there an overnight train from Ghotki to Bahawalpur?

Yes. 3 of the 11 scheduled services are booked to arrive on a later day than they depart: Rehman Baba Express 47UP, Jaffar Express 39UP, Pakistan Express 45UP.

Do trains lose time between Ghotki and Bahawalpur?

Typically the opposite. Fareed Express 37UP makes up about 42 min over this leg across 27 recorded runs. That does not mean it runs early; it means it arrived less late than it departed, which usually says more about how the timetable books this stretch than about the train.

How far is it from Ghotki to Bahawalpur by train?

It is between 292 and 299 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 10 of the 11 services; the rest of the track on this route has not been traced yet.

Are these Ghotki to Bahawalpur timings the real arrival times?

No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.

Stations on this line

14 stops
GhotkiMirpur MatheloDaharkiRetiWalharSadiqabadRahim Yar KhanKhanpur Jn.FirozaLiaquatpurDera Nawab SahibMubarakpurSamasata JnBahawalpur
direct services only
Ghotki → Karachi Cantt 7 trainsGhotki → Peshawar Cantt 4 trainsGhotki → Karachi City 3 trainsGhotki → Lahore Jn. 2 trainsGhotki → Rawalpindi 2 trainsBahawalpur → Karachi Cantt 14 trains

Ghotki timetable · Bahawalpur timetable