latetrains.pkLate, on recordTrain delays · independent
Stations/Ghotki/Ghotki → Rohri Jn.

Ghotki to Rohri Jn.

11 scheduled services · fastest about 1h 05m
Ghotki se Rohri ki train — timing aur delay record.
11Scheduled services
1h 05mFastest booked
1h 28mSlowest booked
2Overnight services
11 of 11With a delay record
GHOTKIROHRIGHOTKI
گھوٹکی ۔ روہڑی جنکشن ۔ گھوٹکی
Most reliable choice

Shalimar Express 28DN — within 15 minutes of the scheduled time 39% of the time, typically 25 minutes late, over 26 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Ghotki to Rohri Jn. it typically makes up 18 min, from 41 recorded runs. At Rohri Jn. it has typically arrived 18 minutes late, from 69 recorded runs.

Every train, compared

11 of 11 with 7+ days

Over this leg is the CHANGE in a train's delay between Ghotki and Rohri Jn. on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Ghotki — no booked arrival at Ghotki to measure from at all. Figures cover runs recorded between 30 July 2026 and 12 November 2026. why a delay figure changes along the route.

TrainDepartsArrivesDurationTypical delayOn-timeOver this leg
8Tezgam 8DN00:25 +1d01:30 +1d1h 05m+1h 20m11%makes up 10 min · 54
40Jaffar Express 40DN02:15 +1d03:35 +1d1h 20m+48 min25%makes up 18 min · 31
48Rehman Baba Express 48DN06:26 +1d07:40 +1d1h 14m+2h 39m10%makes up 5 min · 46
14Awam Express 14DN07:32 +1d08:55 +1d1h 23m+1h 48m9%makes up 15 min · 54
12Hazara Express 12DN13:38 +1d14:55 +1d1h 17m+1h 41m12%makes up 15 min · 53
28Shalimar Express 28DN17:5219:001h 08m+25 min39%makes up 18 min · 41
2Khyber Mail 2DN20:12 +1d21:40 +1d1h 28m+2h 15m7%makes up 18 min · 30
38Fareed Express 38DN21:2422:351h 11m+1h 03m15%makes up 14 min · 49
26Bahauddin Zikria Express 26DN22:2323:351h 12m+2h 31m9%makes up 9 min · 38
46Pakistan Express 46DN22:5600:10 +1d1h 14m+2h 41m4%makes up 17 min · 56
10Allama Iqbal Express 10DN23:1700:25 +1d1h 08m+1h 05m22%makes up 11 min · 50
What the marks mean
  • Departs · Arrives — scheduled local times, published Pakistan Railways timetable
  • +1d — a stop on a later day of the train's own run, not a date
  • Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
  • — — fewer than 7 days of recorded runs for that train
  • Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
  • A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
  • — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.

Every service in detail

Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.

Travelling the other way? Rohri Jn. to Ghotki trains →

Common questions

How many trains run from Ghotki to Rohri Jn.?

11 scheduled services on the current published timetable. That is what is booked to run, not what ran today.

Which is the fastest train from Ghotki to Rohri Jn.?

Tezgam 8DN, booked at 1h 05m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.

Which train from Ghotki to Rohri Jn. is most likely to be on time?

Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 39% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 25 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 11 of 11 services on this route currently have enough recorded history to rank at all.

Is there an overnight train from Ghotki to Rohri Jn.?

Yes. 2 of the 11 scheduled services are booked to arrive on a later day than they depart: Pakistan Express 46DN, Allama Iqbal Express 10DN.

Do trains lose time between Ghotki and Rohri Jn.?

Typically the opposite. Jaffar Express 40DN makes up about 18 min over this leg across 31 recorded runs. That does not mean it runs early; it means it arrived less late than it departed, which usually says more about how the timetable books this stretch than about the train.

Are these Ghotki to Rohri Jn. timings the real arrival times?

No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.

Stations on this line

3 stops
GhotkiPano AkilRohri Jn.
direct services only
Ghotki → Karachi Cantt 7 trainsGhotki → Peshawar Cantt 4 trainsGhotki → Karachi City 3 trainsGhotki → Lahore Jn. 2 trainsGhotki → Rawalpindi 2 trainsRohri Jn. → Karachi Cantt 14 trains