Jahangira Road to Peshawar Cantt
Awam Express 13UP — within 15 minutes of the scheduled time 13% of the time, typically 92 minutes late, over 26 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Jahangira Road to Peshawar Cantt it typically makes up 10 min, from 31 recorded runs. At Peshawar Cantt it has typically arrived 206 minutes late, from 70 recorded runs.
Every train, compared
4 of 5 with 7+ daysOver this leg is the CHANGE in a train's delay between Jahangira Road and Peshawar Cantt on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Jahangira Road — no booked arrival at Jahangira Road to measure from at all. Figures cover runs recorded between 30 July 2026 and 12 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 1Khyber Mail 1UP | 04:54 +2d | 06:05 +2d | 1h 11m | +2h 19m | 3% | no data |
| 19Khushhal Khan Khatak Express 19Up | 07:48 +2d | 09:30 +2d | 1h 42m | — | — | no data |
| 13Awam Express 13UP | 15:46 +1d | 17:00 +1d | 1h 14m | +1h 32m | 13% | makes up 10 min · 31 |
| 47Rehman Baba Express 47UP | 16:55 +1d | 18:05 +1d | 1h 10m | +1h 41m | 9% | adds 22 min · 34 |
| 39Jaffar Express 39UP | 18:29 +1d | 19:35 +1d | 1h 06m | +1h 43m | 2% | adds 22 min · 34 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Khyber Mail 1UP1خیبر میل 1 اپ04:54 +2d→06:05 +2d1h 11m3% on time · +2h 19mno data over this leg
- Khushhal Khan Khatak Express 19Up19خوشحال خان خٹک ایکسپریس07:48 +2d→09:30 +2d1h 42mno delay figure yetno data over this leg
- Awam Express 13UP13عوام ایکسپریس 13 اپ15:46 +1d→17:00 +1d1h 14m13% on time · +1h 32mmakes up 10 min over this leg · 31 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ16:55 +1d→18:05 +1d1h 10m9% on time · +1h 41madds 22 min over this leg · 34 runs
- Jaffar Express 39UP39جعفر ایکسپریس 39 اپ18:29 +1d→19:35 +1d1h 06m2% on time · +1h 43madds 22 min over this leg · 34 runs
Travelling the other way? Peshawar Cantt to Jahangira Road trains →
Common questions
How many trains run from Jahangira Road to Peshawar Cantt?
5 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Jahangira Road to Peshawar Cantt?
Jaffar Express 39UP, booked at 1h 06m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Jahangira Road to Peshawar Cantt is most likely to be on time?
Awam Express 13UP has the best recorded punctuality of the services we hold enough history for: 13% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 1h 32m. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 4 of 5 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Jahangira Road to Peshawar Cantt?
Not on the current timetable. Every service on this route is booked to arrive on the same day it departs.
Do trains lose time between Jahangira Road and Peshawar Cantt?
Typically yes. Rehman Baba Express 47UP adds about 22 min to its delay over this leg, measured across 34 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Jahangira Road to Peshawar Cantt timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.