Lala Musa Jn. to Bahawalpur
Millat Express 18DN — within 15 minutes of the scheduled time 31% of the time, typically 60 minutes late, over 25 days of recorded runs across every stop of its full journey, not this segment alone. At Bahawalpur it has typically arrived 73 minutes late, from 90 recorded runs.
Every train, compared
8 of 8 with 7+ daysOver this leg is the CHANGE in a train's delay between Lala Musa Jn. and Bahawalpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Lala Musa Jn. — no booked arrival at Lala Musa Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 18 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 2Khyber Mail 2DN | 04:55 +1d | 15:10 +1d | 10h 15m | +1h 58m | 8% | adds 1h 18m · 20 |
| 46Pakistan Express 46DN | 08:54 | 18:50 | 9h 56m | +2h 26m | 4% | adds 1h 22m · 31 |
| 18Millat Express 18DN | 09:15 | 20:15 | 11h | +1h | 31% | no data |
| 8Tezgam 8DN | 11:05 | 20:25 | 9h 20m | +1h 08m | 17% | adds 1h 01m · 61 |
| 40Jaffar Express 40DN | 12:48 | 22:25 | 9h 37m | +52 min | 20% | adds 28 min · 43 |
| 14Awam Express 14DN | 15:48 | 02:21 +1d | 10h 33m | +1h 22m | 15% | adds 1h 30m · 50 |
| 48Rehman Baba Express 48DN | 17:20 | 02:40 +1d | 9h 20m | +2h 21m | 10% | adds 39 min · 58 |
| 12Hazara Express 12DN | 20:55 | 08:40 +1d | 11h 45m | +1h 32m | 15% | adds 53 min · 43 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Khyber Mail 2DN2خیبر میل 2 ڈائون04:55 +1d→15:10 +1d10h 15m8% on time · +1h 58madds 1h 18m over this leg · 20 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون08:54→18:509h 56m4% on time · +2h 26madds 1h 22m over this leg · 31 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون09:15→20:1511h31% on time · +1hno data over this leg
- Tezgam 8DN8تیزگام 8 ڈاؤن11:05→20:259h 20m17% on time · +1h 08madds 1h 01m over this leg · 61 runs
- Jaffar Express 40DN40جعفر ایکسپریس 40 ڈائون12:48→22:259h 37m20% on time · +52 minadds 28 min over this leg · 43 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون15:48→02:21 +1d10h 33m15% on time · +1h 22madds 1h 30m over this leg · 50 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن17:20→02:40 +1d9h 20m10% on time · +2h 21madds 39 min over this leg · 58 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن20:55→08:40 +1d11h 45m15% on time · +1h 32madds 53 min over this leg · 43 runs
Travelling the other way? Bahawalpur to Lala Musa Jn. trains →
Common questions
How many trains run from Lala Musa Jn. to Bahawalpur?
8 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Lala Musa Jn. to Bahawalpur?
Tezgam 8DN, booked at 9h 20m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Lala Musa Jn. to Bahawalpur is most likely to be on time?
Millat Express 18DN has the best recorded punctuality of the services we hold enough history for: 31% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 1h. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 8 of 8 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Lala Musa Jn. to Bahawalpur?
Yes. 3 of the 8 scheduled services are booked to arrive on a later day than they depart: Awam Express 14DN, Rehman Baba Express 48DN, Hazara Express 12DN.
Do trains lose time between Lala Musa Jn. and Bahawalpur?
Typically yes. Awam Express 14DN adds about 1h 30m to its delay over this leg, measured across 50 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Lala Musa Jn. to Bahawalpur timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.