Lala Musa Jn. to Rahim Yar Khan
Jaffar Express 40DN — within 15 minutes of the scheduled time 24% of the time, typically 60 minutes late, over 7 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Lala Musa Jn. to Rahim Yar Khan it typically adds 53 min, from 27 recorded runs. At Rahim Yar Khan it has typically arrived 66 minutes late, from 29 recorded runs.
Every train, compared
6 of 8 with 7+ daysOver this leg is the CHANGE in a train's delay between Lala Musa Jn. and Rahim Yar Khan on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Lala Musa Jn. — no booked arrival at Lala Musa Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 5 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 2Khyber Mail 2DN | 04:45 +1d | 18:02 +1d | 13h 17m | 763 km | +2h 12m | 8% | adds 1h 52m · 14 |
| 46Pakistan Express 46DN | 08:54 | 21:12 | 12h 18m | 692 km | +1h 04m | 4% | adds 1h 43m · 19 |
| 18Millat Express 18DN | 10:30 | 01:04 +1d | 14h 34m | 716 km | +2h 35m | 8% | no data |
| 8Tezgam 8DN | 11:05 | 22:47 | 11h 42m | 748 km | — | — | adds 1h 39m · 38 |
| 40Jaffar Express 40DN | 13:42 | 01:52 +1d | 12h 10m | 758 km | +1h | 24% | adds 53 min · 27 |
| 14Awam Express 14DN | 15:48 | 05:32 +1d | 13h 44m | 763 km | +2h 14m | 8% | adds 1h 56m · 34 |
| 48Rehman Baba Express 48DN | 17:20 | 04:49 +1d | 11h 29m | 693 km | +1h 56m | 14% | adds 1h 33m · 32 |
| 12Hazara Express 12DN | 20:55 | 11:30 +1d | 14h 35m | 710 km | — | — | adds 1h · 24 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Khyber Mail 2DN2خیبر میل 2 ڈائون04:45 +1d→18:02 +1d13h 17m8% on time · +2h 12madds 1h 52m over this leg · 14 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون08:54→21:1212h 18m4% on time · +1h 04madds 1h 43m over this leg · 19 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون10:30→01:04 +1d14h 34m8% on time · +2h 35mno data over this leg
- Tezgam 8DN8تیزگام 8 ڈاؤن11:05→22:4711h 42mno delay figure yetadds 1h 39m over this leg · 38 runs
- Jaffar Express 40DN40جعفر ایکسپریس 40 ڈائون13:42→01:52 +1d12h 10m24% on time · +1hadds 53 min over this leg · 27 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون15:48→05:32 +1d13h 44m8% on time · +2h 14madds 1h 56m over this leg · 34 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن17:20→04:49 +1d11h 29m14% on time · +1h 56madds 1h 33m over this leg · 32 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن20:55→11:30 +1d14h 35mno delay figure yetadds 1h over this leg · 24 runs
Travelling the other way? Rahim Yar Khan to Lala Musa Jn. trains →
Common questions
How many trains run from Lala Musa Jn. to Rahim Yar Khan?
8 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Lala Musa Jn. to Rahim Yar Khan?
Rehman Baba Express 48DN, booked at 11h 29m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Lala Musa Jn. to Rahim Yar Khan is most likely to be on time?
Jaffar Express 40DN has the best recorded punctuality of the services we hold enough history for: 24% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 1h. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 6 of 8 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Lala Musa Jn. to Rahim Yar Khan?
Yes. 5 of the 8 scheduled services are booked to arrive on a later day than they depart: Millat Express 18DN, Jaffar Express 40DN, Awam Express 14DN, Rehman Baba Express 48DN and others.
Do trains lose time between Lala Musa Jn. and Rahim Yar Khan?
Typically yes. Awam Express 14DN adds about 1h 56m to its delay over this leg, measured across 34 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Lala Musa Jn. to Rahim Yar Khan by train?
It is between 692 and 763 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails.
Are these Lala Musa Jn. to Rahim Yar Khan timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.