latetrains.pkLate, on record46 live
Stations/Nawabshah Jn./Nawabshah Jn. → Hyderabad Jn

Nawabshah Jn. to Hyderabad Jn

13 scheduled services · fastest about 1h 50m · 115 km to 116 km by route (measured on 10 of 13)
Nawabshah se Hyderabad ki train — timing aur delay record.
13Scheduled services
1h 50mFastest booked
3h 10mSlowest booked
1Overnight services
13 of 13With a delay record
NAWABSHAHHYDERABADNAWABSHAH
نوابشاہ جنکشن ۔ حیدرآباد جنکشن ۔ نوابشاہ جنکشن
Most reliable choice

Shalimar Express 28DN — within 15 minutes of the scheduled time 44% of the time, typically 22 minutes late, over 10 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Nawabshah Jn. to Hyderabad Jn it typically makes up 7 min, from 22 recorded runs. At Hyderabad Jn it has typically arrived 40 minutes late, from 34 recorded runs.

Every train, compared

13 of 13 with 7+ days

Over this leg is the CHANGE in a train's delay between Nawabshah Jn. and Hyderabad Jn on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Nawabshah Jn. — no booked arrival at Nawabshah Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 4 October 2026. why a delay figure changes along the route.

TrainDepartsArrivesDurationDistanceTypical delayOn-timeOver this leg
2Khyber Mail 2DN00:10 +2d02:00 +2d1h 50m116 km+2h 02m7%adds 8 min · 21
146Sukkur Express 146DN00:55 +1d04:05 +1d3h 10mnot measured yet+19 min39%makes up 42 min · 36
38Fareed Express 38DN02:04 +1d04:25 +1d2h 21mnot measured yet+44 min14%makes up 12 min · 30
26Bahauddin Zikria Express 26DN02:56 +1d05:10 +1d2h 14m115 km+1h 10m10%makes up 6 min · 23
10Allama Iqbal Express 10DN03:50 +1d06:00 +1d2h 10m115 km+53 min24%makes up 2 min · 35
8Tezgam 8DN04:56 +1d07:10 +1d2h 14m115 km+58 min17%no change · 37
34Pak Business 34DN06:12 +1d08:15 +1d2h 03m116 km+1h 05m18%adds 2 min · 37
18Millat Express 18DN07:23 +1d09:30 +1d2h 07m115 km+2h 37m10%makes up 1 min · 38
16Karachi Express 16DN08:12 +1d10:15 +1d2h 03m116 km+2h 05m13%makes up 4 min · 38
48Rehman Baba Express 48DN11:25 +1d13:45 +1d2h 20m115 km+2h 20m13%makes up 12 min · 35
14Awam Express 14DN13:18 +1d15:55 +1d2h 37m116 km+2h 09m8%makes up 20 min · 38
12Hazara Express 12DN18:47 +1d21:05 +1d2h 18m115 km+1h 17m10%makes up 6 min · 36
28Shalimar Express 28DN22:1000:05 +1d1h 55mnot measured yet+22 min44%makes up 7 min · 22
What the marks mean
  • Departs · Arrives — scheduled local times, published Pakistan Railways timetable
  • +1d — a stop on a later day of the train's own run, not a date
  • Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
  • — — fewer than 7 days of recorded runs for that train
  • Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
  • A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
  • — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.

Every service in detail

Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.

Travelling the other way? Hyderabad Jn to Nawabshah Jn. trains →

Common questions

How many trains run from Nawabshah Jn. to Hyderabad Jn?

13 scheduled services on the current published timetable. That is what is booked to run, not what ran today.

Which is the fastest train from Nawabshah Jn. to Hyderabad Jn?

Khyber Mail 2DN, booked at 1h 50m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.

Which train from Nawabshah Jn. to Hyderabad Jn is most likely to be on time?

Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 44% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 22 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 13 of 13 services on this route currently have enough recorded history to rank at all.

Is there an overnight train from Nawabshah Jn. to Hyderabad Jn?

Yes. 1 of the 13 scheduled services is booked to arrive on a later day than it departs: Shalimar Express 28DN.

Do trains lose time between Nawabshah Jn. and Hyderabad Jn?

Typically the opposite. Sukkur Express 146DN makes up about 42 min over this leg across 36 recorded runs. That does not mean it runs early; it means it arrived less late than it departed, which usually says more about how the timetable books this stretch than about the train.

How far is it from Nawabshah Jn. to Hyderabad Jn by train?

It is between 115 and 116 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 10 of the 13 services; the rest of the track on this route has not been traced yet.

Are these Nawabshah Jn. to Hyderabad Jn timings the real arrival times?

No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.

Stations on this line

5 stops
Nawabshah Jn.SarhariShahdadpurTando AdamHyderabad Jn
direct services only
Nawabshah Jn. → Karachi Cantt 9 trainsNawabshah Jn. → Karachi City 4 trainsNawabshah Jn. → Lahore Jn. 4 trainsNawabshah Jn. → Peshawar Cantt 3 trainsHyderabad Jn → Karachi Cantt 14 trainsHyderabad Jn → Karachi City 6 trains

Nawabshah Jn. timetable · Hyderabad Jn timetable