Nawabshah Jn. to Samasata Jn
Hazara Express 11UP — within 15 minutes of the scheduled time 22% of the time, typically 53 minutes late, over 11 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Nawabshah Jn. to Samasata Jn it typically adds 1 min, from 36 recorded runs. At Samasata Jn it has typically arrived 57 minutes late, from 44 recorded runs.
Every train, compared
7 of 7 with 7+ daysOver this leg is the CHANGE in a train's delay between Nawabshah Jn. and Samasata Jn on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Nawabshah Jn. — no booked arrival at Nawabshah Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 37Fareed Express 37UP | 00:55 +1d | 11:15 +1d | 10h 20m | 526 km | +1h 22m | 7% | makes up 4 min · 26 |
| 1Khyber Mail 1UP | 02:45 +1d | 11:20 +1d | 8h 35m | 524 km | +1h 45m | 9% | adds 1h 27m · 34 |
| 27Shalimar Express 27UP | 10:58 | — | — | 526 km | +1h 02m | 18% | no data |
| 11Hazara Express 11UP | 12:00 | 22:06 | 10h 06m | 525 km | +53 min | 22% | adds 1 min · 36 |
| 13Awam Express 13UP | 12:50 | 23:20 | 10h 30m | 526 km | +1h 43m | 6% | adds 25 min · 39 |
| 47Rehman Baba Express 47UP | 16:39 | 01:42 +1d | 9h 03m | 523 km | +1h 46m | 10% | adds 49 min · 28 |
| 25Bahauddin Zikria Express 25UP | 23:46 | 08:25 +1d | 8h 39m | 524 km | +2h | 6% | adds 1h 30m · 22 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Fareed Express 37UP37فرید ایکسپریس 37 اپ00:55 +1d→11:15 +1d10h 20m7% on time · +1h 22mmakes up 4 min over this leg · 26 runs
- Khyber Mail 1UP1خیبر میل 1 اپ02:45 +1d→11:20 +1d8h 35m9% on time · +1h 45madds 1h 27m over this leg · 34 runs
- Shalimar Express 27UP27شالیمار ایکسپریس 27 اپ10:58→——18% on time · +1h 02mno data over this leg
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ12:00→22:0610h 06m22% on time · +53 minadds 1 min over this leg · 36 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ12:50→23:2010h 30m6% on time · +1h 43madds 25 min over this leg · 39 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ16:39→01:42 +1d9h 03m10% on time · +1h 46madds 49 min over this leg · 28 runs
- Bahauddin Zikria Express 25UP25بہائو الدین زکریا ایکسپری25 اپ23:46→08:25 +1d8h 39m6% on time · +2hadds 1h 30m over this leg · 22 runs
Travelling the other way? Samasata Jn to Nawabshah Jn. trains →
Common questions
How many trains run from Nawabshah Jn. to Samasata Jn?
7 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Nawabshah Jn. to Samasata Jn?
Khyber Mail 1UP, booked at 8h 35m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Nawabshah Jn. to Samasata Jn is most likely to be on time?
Hazara Express 11UP has the best recorded punctuality of the services we hold enough history for: 22% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 53 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 7 of 7 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Nawabshah Jn. to Samasata Jn?
Yes. 2 of the 7 scheduled services are booked to arrive on a later day than they depart: Rehman Baba Express 47UP, Bahauddin Zikria Express 25UP.
Do trains lose time between Nawabshah Jn. and Samasata Jn?
Typically yes. Bahauddin Zikria Express 25UP adds about 1h 30m to its delay over this leg, measured across 22 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Nawabshah Jn. to Samasata Jn by train?
It is between 523 and 526 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails.
Are these Nawabshah Jn. to Samasata Jn timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.