Rahim Yar Khan to Mehrabpur
Millat Express 18DN — within 15 minutes of the scheduled time 31% of the time, typically 60 minutes late, over 25 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rahim Yar Khan to Mehrabpur it typically adds 21 min, from 50 recorded runs. At Mehrabpur it has typically arrived 140 minutes late, from 89 recorded runs.
Every train, compared
8 of 8 with 7+ daysOver this leg is the CHANGE in a train's delay between Rahim Yar Khan and Mehrabpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rahim Yar Khan — no booked arrival at Rahim Yar Khan to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 48Rehman Baba Express 48DN | 04:51 +1d | 09:13 +1d | 4h 22m | +2h 21m | 10% | adds 49 min · 58 |
| 14Awam Express 14DN | 05:34 +1d | 10:49 +1d | 5h 15m | +1h 22m | 15% | adds 32 min · 49 |
| 12Hazara Express 12DN | 11:35 +1d | 16:35 +1d | 5h | +1h 32m | 15% | adds 1 min · 59 |
| 38Fareed Express 38DN | 19:29 | 00:01 +1d | 4h 32m | +1h 05m | 16% | adds 6 min · 51 |
| 26Bahauddin Zikria Express 26DN | 20:39 | 01:00 +1d | 4h 21m | +1h 33m | 10% | adds 25 min · 42 |
| 10Allama Iqbal Express 10DN | 21:34 | 01:50 +1d | 4h 16m | +44 min | 28% | adds 32 min · 58 |
| 18Millat Express 18DN | 22:26 | 02:30 +1d | 4h 04m | +1h | 31% | adds 21 min · 50 |
| 8Tezgam 8DN | 22:49 | 03:02 +1d | 4h 13m | +1h 08m | 17% | adds 43 min · 58 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن04:51 +1d→09:13 +1d4h 22m10% on time · +2h 21madds 49 min over this leg · 58 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون05:34 +1d→10:49 +1d5h 15m15% on time · +1h 22madds 32 min over this leg · 49 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن11:35 +1d→16:35 +1d5h15% on time · +1h 32madds 1 min over this leg · 59 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون19:29→00:01 +1d4h 32m16% on time · +1h 05madds 6 min over this leg · 51 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون20:39→01:00 +1d4h 21m10% on time · +1h 33madds 25 min over this leg · 42 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون21:34→01:50 +1d4h 16m28% on time · +44 minadds 32 min over this leg · 58 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون22:26→02:30 +1d4h 04m31% on time · +1hadds 21 min over this leg · 50 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن22:49→03:02 +1d4h 13m17% on time · +1h 08madds 43 min over this leg · 58 runs
Travelling the other way? Mehrabpur to Rahim Yar Khan trains →
Common questions
How many trains run from Rahim Yar Khan to Mehrabpur?
8 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rahim Yar Khan to Mehrabpur?
Millat Express 18DN, booked at 4h 04m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rahim Yar Khan to Mehrabpur is most likely to be on time?
Millat Express 18DN has the best recorded punctuality of the services we hold enough history for: 31% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 1h. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 8 of 8 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rahim Yar Khan to Mehrabpur?
Yes. 5 of the 8 scheduled services are booked to arrive on a later day than they depart: Fareed Express 38DN, Bahauddin Zikria Express 26DN, Allama Iqbal Express 10DN, Millat Express 18DN and others.
Do trains lose time between Rahim Yar Khan and Mehrabpur?
Typically yes. Rehman Baba Express 48DN adds about 49 min to its delay over this leg, measured across 58 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Rahim Yar Khan to Mehrabpur timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.