latetrains.pkLate, on recordTrain delays · independent
Trains/Jia Bagga–Marshalling Yard Pipri (Myp)/502 DN (ENG NUM 9013)

502 DN (ENG NUM 9013) جیا بگا کول ڈاؤن

Kitni late hoti hai? Typical delay, on-time record aur station timings.
JIA BAGGAMARSHALLING YARD PIPRI (MYP)JIA BAGGA
Down direction · returnsجیہ بگا ریلوےاسٹیشن ۔ مارشلنگ یارڈ ( پپری) ۔ جیہ بگا ریلوےاسٹیشن
Last seen 21 November 20264 days tracked

How late is it, usually?

no figure yet
Since 20 November 2026

One day recorded so far.

A typical (median) delay figure appears at 7 full days of recorded runs — days the train reported, not calendar days.

Recorded days
1 / 7
Positions logged
6,542
Stops timed
5

1 of 7 recorded days toward a first typical-delay figure

Timetable

scheduled → actual, 20 November 2026 run

The second time in a cell is what actually happened on the 20 November 2026 run.

#StationArrivalDeparture
1Jia Bagga Railway Station—14:45
2Sahiwal19:5018:00
3Khanewal Jn21:1521:45
4Samasata Jn01:0002:35
5Khanpur Jn.05:4005:50
6Rohri Jn.11:00 → 13:20·PR12:30 → 14:45
7Tando Adam19:15 → 20:20·PR19:20
8Kotri Jn00:00 +1d00:20 +1d
9Marshalling Yard Pipri (Myp)06:00 → 05:51—
What the marks mean
  • → 21:28 — actual time on the 20 November 2026 run
  • ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
  • +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
  • Blank — not recorded

Station by station, last 1 days

5 arrivals recorded

One mark per day, newest first.

Days shownFri20 Nov

A run’s GPS trail is decoded after the journey completes — recent days may link later.

  • 5Khanpur Jn.scheduled 05:40+2h071 day
    DayArrivedDelayRecorded by
    Fri 20 Novarrived, time not recorded+2h07Pakistan Railways

    Seen on 1 of 1 days. Every train at Khanpur Jn. →

  • 6Rohri Jn.scheduled 11:00+49m1 day
    DayArrivedDelayRecorded by
    Fri 20 Nov13:20+49mPakistan Railways

    Seen on 1 of 1 days. Every train at Rohri Jn. →

  • 7Tando Adamscheduled 19:15+1h051 day
    DayArrivedDelayRecorded by
    Fri 20 Nov20:20+1h05Pakistan Railways

    Seen on 1 of 1 days. Every train at Tando Adam →

  • 8Kotri Jnscheduled 00:001m early1 day
    DayArrivedDelayRecorded by
    Fri 20 Novarrived, time not recorded1m earlyPakistan Railways

    Seen on 1 of 1 days. Every train at Kotri Jn →

  • 9Marshalling Yard Pipri (Myp)scheduled 06:00+23h511 day
    DayArrivedDelayRecorded by
    Fri 20 Nov05:51+23h51Train GPS

    Seen on 1 of 1 days. Every train at Marshalling Yard Pipri (Myp) →

What the marks mean
  • Tap a station — each day’s arrival, delay and recorder
  • Green — within 15 minutes of the scheduled time
  • Amber — 16 to 45 minutes late
  • Red — over 45 minutes late
  • Hollow — not recorded that day
  • Grey — arrived, no delay figure
  • Dash (—) — no delay figure for this stop yet
  • Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
  • The starting station is not listed — a train does not arrive where it begins.
  • 3 further stops on this route with nothing recorded yet — not listed.

Common questions

What time does 502 DN (ENG NUM 9013) leave Jia Bagga Railway Station?

14:45, on the current published timetable. It is booked into Marshalling Yard Pipri (Myp) at 06:00, the day it leaves. Those are booked times. The delay figures on this page are what we recorded against them.

How many stops does 502 DN (ENG NUM 9013) make?

9 on the current published timetable, from Jia Bagga Railway Station to Marshalling Yard Pipri (Myp). The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.