latetrains.pkLate, on recordTrain delays · independent
Trains/Port Qasim–Changa Manga/Q CTR (ENG NUM 8210) 921 UP

921 Q CTR (ENG NUM 8210) سی جی ایم کنٹینر اپ

Kitni late hoti hai? Typical delay, on-time record aur station timings.
PORT QASIMCHANGA MANGAPORT QASIM
Up direction · returnsپورٹ محمد بن قاسم ۔ چھانگا مانگا ۔ پورٹ محمد بن قاسم
Last seen 18 November 2026117 days tracked

How late is it, usually?

no figure yet
Since 29 July 2026

3 days recorded so far.

A typical (median) delay figure appears at 7 full days of recorded runs — days the train reported, not calendar days.

Recorded days
3 / 7
Positions logged
89,951
Stops timed
7

3 of 7 recorded days toward a first typical-delay figure

Where the time goes

already late at Port Qasim

Leaves Port Qasim +17h 47m · reaches Khanewal Jn +26h 44m — +8h 57m lost along the way.

  1. Port Qasim01:00پورٹ محمد بن قاسم+17h 47m
  2. Kotri Jn04:20کوٹری جنکشن+27h 48m
  3. Rohri Jn.12:45روہڑی جنکشن+20h 08m
  4. Khanpur Jn.17:10خانپور جنکشن+2h 34m
  5. Samasata Jn23:50سمہ سٹہ جنکشن+23h 27m
  6. Khanewal Jn04:10خانیوال+26h 44m
  7. Changa Manga09:00چھانگا مانگا—
What the marks mean
  • Solid bar — the typical delay at that stop (median of recorded arrivals)
  • Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
  • No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
  • — (no solid bar either) — fewer than 3 recorded runs at that stop
  • A negative figure means the train typically ran early at that stop, not late
  • Most time is lost between Khanpur Jn. and Samasata Jn (+20h 53m)
  • Every stop on the current timetable is listed, in order, measured or not.

Timetable

scheduled → actual, 12 November 2026 run

The second time in a cell is what actually happened on the 12 November 2026 run.

#StationArrivalDeparture
1Port Qasim— → 04:59·PR01:00
2Kotri Jn04:0004:20
3Rohri Jn.11:15 → 12:08·PR12:45 → 13:40
4Khanpur Jn.17:00 → 19:34·PR17:10 → 19:47
5Samasata Jn22:2023:50 → 01:14
6Khanewal Jn03:40 → 08:0104:10 → 09:20
7Changa Manga09:00—
What the marks mean
  • → 21:28 — actual time on the 12 November 2026 run
  • ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
  • +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
  • Blank — not recorded

Station by station, last 5 days

18 arrivals recorded

One mark per day, newest first.

Days shownThu12 NovFri6 NovWed28 OctSun18 OctFri9 Oct

A run’s GPS trail is decoded after the journey completes — recent days may link later.

  • 2Kotri Jnscheduled 04:00+36h324 days
    DayArrivedDelayRecorded by
    Thu 12 Novarrived, time not recorded+75h42Pakistan Railways
    Fri 6 Novarrived, time not recorded+49h22Pakistan Railways
    Wed 28 Octnot recorded—
    Sun 18 Oct04:00+23h41Pakistan Railways
    Fri 9 Oct15:41+11h23Pakistan Railways

    Seen on 4 of 5 days, ranging +11h23 to +75h42. Every train at Kotri Jn →

  • 3Rohri Jn.scheduled 11:15+20h083 days
    DayArrivedDelayRecorded by
    Thu 12 Nov12:08+53mPakistan Railways
    Fri 6 Novarrived, time not recorded+36h50Pakistan Railways
    Wed 28 Octnot recorded—
    Sun 18 Octnot recorded—
    Fri 9 Oct08:53+20h08Pakistan Railways

    Seen on 3 of 5 days, ranging +53m to +36h50. Every train at Rohri Jn. →

  • 4Khanpur Jn.scheduled 17:00+2h343 days
    DayArrivedDelayRecorded by
    Thu 12 Nov19:34+2h34Pakistan Railways
    Fri 6 Nov15:1422m earlyPakistan Railways
    Wed 28 Octnot recorded—
    Sun 18 Octnot recorded—
    Fri 9 Oct17:13+24h04Pakistan Railways

    Seen on 3 of 5 days, ranging 22m early to +24h04. Every train at Khanpur Jn. →

  • 5Samasata Jnscheduled 22:20+23h273 days
    DayArrivedDelayRecorded by
    Thu 12 Novarrived, time not recorded+29h48Pakistan Railways
    Fri 6 Novarrived, time not recorded+16mPakistan Railways
    Wed 28 Octnot recorded—
    Sun 18 Octnot recorded—
    Fri 9 Oct23:17+23h27Pakistan Railways

    Seen on 3 of 5 days, ranging +16m to +29h48. Every train at Samasata Jn →

  • 6Khanewal Jnscheduled 03:40+26h444 days
    DayArrivedDelayRecorded by
    Thu 12 Nov08:01+28h21Pakistan Railways (journey record)
    Fri 6 Nov05:16+25h07Pakistan Railways
    Wed 28 Octarrived, time not recorded+5h11Pakistan Railways
    Sun 18 Octnot recorded—
    Fri 9 Octarrived, time not recorded+62h36Pakistan Railways

    Seen on 4 of 5 days, ranging +5h11 to +62h36. Every train at Khanewal Jn →

  • 7Changa Mangascheduled 09:00—no figure
    DayArrivedDelayRecorded by
    Thu 12 Novnot recorded—
    Fri 6 Novnot recorded—
    Wed 28 Oct15:51—Pakistan Railways (journey record)
    Sun 18 Octnot recorded—
    Fri 9 Octnot recorded—

    Seen on 1 of 5 days. Every train at Changa Manga →

What the marks mean
  • Tap a station — each day’s arrival, delay and recorder
  • Green — within 15 minutes of the scheduled time
  • Amber — 16 to 45 minutes late
  • Red — over 45 minutes late
  • Hollow — not recorded that day
  • Grey — arrived, no delay figure
  • Dash (—) — no delay figure for this stop yet
  • Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
  • The starting station is not listed — a train does not arrive where it begins.

Common questions

What time does Q CTR (ENG NUM 8210) 921 UP leave Port Qasim?

01:00, on the current published timetable. It is booked into Changa Manga at 09:00, the day it leaves. Those are booked times. The delay figures on this page are what we recorded against them.

How long does Q CTR (ENG NUM 8210) 921 UP take from Port Qasim to Changa Manga?

8h on the timetable. We do not yet hold enough recorded arrivals at Changa Manga to say what it takes in practice.

How many stops does Q CTR (ENG NUM 8210) 921 UP make?

7 on the current published timetable, from Port Qasim to Changa Manga. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.