latetrains.pkLate, on recordTrain delays · independent
Trains/Kotri–Rohri/Mohinjo Daro Passenger 213UP

213 Mohinjo Daro Passenger 213UP موہنجودڑو پسنجر 213اپ

Kitni late hoti hai? Typical delay, on-time record aur station timings.
KOTRIROHRIKOTRI
Up direction · returnsکوٹری جنکشن ۔ روہڑی جنکشن ۔ کوٹری جنکشن
PassengerLast seen 21 November 2026105 days tracked

How late is it, usually?

no figure yet
Since 11 August 2026

One day recorded so far.

A typical (median) delay figure appears at 7 full days of recorded runs — days the train reported, not calendar days.

Recorded days
1 / 7
Positions logged
38,621
Stops timed
24

1 of 7 recorded days toward a first typical-delay figure

Where the time goes

most of it lost after Kotri Jn

Leaves Kotri Jn 23 min early · reaches Rohri Jn. +2h 02m — +2h 25m lost along the way.

  1. Kotri Jn07:00کوٹری جنکشن23 min early
  2. Sindh University07:14سندھ یونیورسٹی+12 min
  3. Cadet College Petaro07:33کیڈٹ کالج پیٹارو+19 min
  4. Amri08:59امری+30 min
  5. Lakhi Shah Saddar09:23لکھی شاہ صدر+34 min
  6. Sehwan Sharif09:55سہون شریف+30 min
  7. Bhan Sayadabad10:28بھان سعیدآباد+44 min
  8. Dadu11:00دادو+39 min
  9. Phulji11:16پھلجی+1h 08m
  10. Piaro Goth (Halt)11:31پیارو گوٹھ+1h 14m
  11. Rehmani Nagar11:52رحمانی نگر+1h 21m
  12. Bali Shah12:12بالی شاھ+1h 24m
  13. Radhan12:30رادھن+1h 43m
  14. Sihar12:41سیہار+1h 49m
  15. Badah12:54بادہ+1h 57m
  16. Mohinjo Daro13:04موہنجوداڑو+2h 04m
  17. Bakrani Road13:37بکرانی روڈ+1h 56m
  18. Larkana Jn.14:10لاڑکانہ جنکشن+1h 56m
  19. Shahnawaz Bhutto14:41شاہنوازبھٹو+2h 18m
  20. Madeji Road15:08مدیجی روڈ+2h 09m
  21. Ruk15:39رک ریلوے اسٹیشن+2h 07m
  22. Habib Kot Jn.16:35حبیب کوٹ جنکشن+1h 57m
  23. Sukkur17:35سکھر+1h 58m
  24. Rohri Jn.17:50روہڑی جنکشن+2h 02m
What the marks mean
  • Solid bar — the typical delay at that stop (median of recorded arrivals)
  • Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
  • No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
  • — (no solid bar either) — fewer than 3 recorded runs at that stop
  • A negative figure means the train typically ran early at that stop, not late
  • Most time is lost between Kotri Jn and Sindh University (+35 min)
  • Every stop on the current timetable is listed, in order, measured or not.

Timetable

scheduled → actual, 20 October 2026 run

The second time in a cell is what actually happened on the 20 October 2026 run.

#StationArrivalDeparture
1Kotri Jn—07:00
2Sindh University07:12 → 07:25·PR07:14 → 07:31
3Cadet College Petaro07:3107:33
4Amri08:57 → 09:44·PR08:59
5Lakhi Shah Saddar09:21 → 09:59·PR09:23
6Sehwan Sharif09:50 → 10:24·PR09:55 → 10:39
7Bhan Sayadabad10:25 → 11:09·PR10:28 → 11:13
8Dadu10:50 → 11:31·PR11:00 → 11:37
9Phulji11:1411:16
10Piaro Goth (Halt)11:29 → 12:45·PR11:31 → 12:45
11Rehmani Nagar11:50 → 13:16·PR11:52 → 13:16
12Bali Shah12:02 → 14:17·PR12:12
13Radhan12:28 → 14:17·PR12:30 → 14:19
14Sihar12:40 → 14:47·PR12:41 → 14:48
15Badah12:5212:54
16Mohinjo Daro13:02 → 15:19·PR13:04
17Bakrani Road13:35 → 15:36·PR13:37 → 15:39
18Larkana Jn.14:00 → 16:10·PR14:10 → 16:17
19Shahnawaz Bhutto14:39 → 16:54·PR14:41 → 16:56
20Madeji Road15:06 → 17:15·PR15:08
21Ruk15:37 → 17:47·PR15:39
22Habib Kot Jn.16:05 → 18:02·PR16:35 → 18:03
23Sukkur17:25 → 19:31·PR17:35 → 19:31
24Rohri Jn.17:50 → 20:00—
What the marks mean
  • → 21:28 — actual time on the 20 October 2026 run
  • ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
  • +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
  • Blank — not recorded

Station by station, last 5 days

112 arrivals recorded

One mark per day, newest first.

Days shownTue20 OctSat17 OctWed14 OctMon12 OctFri9 Oct

A run’s GPS trail is decoded after the journey completes — recent days may link later.

  • 2Sindh Universityscheduled 07:12+12m5 days
    DayArrivedDelayRecorded by
    Tue 20 Oct07:25+12mPakistan Railways
    Sat 17 Oct07:20+8mPakistan Railways
    Wed 14 Oct07:29+15mPakistan Railways
    Mon 12 Oct07:26+13mPakistan Railways
    Fri 9 Oct07:19+8mPakistan Railways

    Seen on 5 of 5 days, ranging +8m to +15m. Every train at Sindh University →

  • 3Cadet College Petaroscheduled 07:31+16m5 days
    DayArrivedDelayRecorded by
    Tue 20 Octarrived, time not recorded+25mPakistan Railways
    Sat 17 Oct07:49+16mPakistan Railways
    Wed 14 Oct07:55+23mPakistan Railways
    Mon 12 Oct07:49+16mPakistan Railways
    Fri 9 Oct07:45+13mPakistan Railways

    Seen on 5 of 5 days, ranging +13m to +25m. Every train at Cadet College Petaro →

  • 4Amrischeduled 08:57+28m5 days
    DayArrivedDelayRecorded by
    Tue 20 Oct09:44+35mPakistan Railways
    Sat 17 Oct09:24+25mPakistan Railways
    Wed 14 Oct09:39+40mPakistan Railways
    Mon 12 Oct09:26+28mPakistan Railways
    Fri 9 Oct09:24+25mPakistan Railways

    Seen on 5 of 5 days, ranging +25m to +40m. Every train at Amri →

  • 5Lakhi Shah Saddarscheduled 09:21+33m5 days
    DayArrivedDelayRecorded by
    Tue 20 Oct09:59+35mPakistan Railways
    Sat 17 Oct09:46+27mPakistan Railways
    Wed 14 Oct10:07+43mPakistan Railways
    Mon 12 Oct09:55+30mPakistan Railways
    Fri 9 Oct09:54+33mPakistan Railways

    Seen on 5 of 5 days, ranging +27m to +43m. Every train at Lakhi Shah Saddar →

  • 6Sehwan Sharifscheduled 09:50+30m5 days
    DayArrivedDelayRecorded by
    Tue 20 Oct10:24+29mPakistan Railways
    Sat 17 Oct10:16+21mPakistan Railways
    Wed 14 Oct10:41+46mPakistan Railways
    Mon 12 Oct10:20+30mPakistan Railways
    Fri 9 Oct10:28+34mPakistan Railways

    Seen on 5 of 5 days, ranging +21m to +46m. Every train at Sehwan Sharif →

  • 7Bhan Sayadabadscheduled 10:25+42m5 days
    DayArrivedDelayRecorded by
    Tue 20 Oct11:09+42mPakistan Railways
    Sat 17 Oct10:51+24mPakistan Railways
    Wed 14 Oct11:23+56mPakistan Railways
    Mon 12 Oct11:07+40mPakistan Railways
    Fri 9 Oct11:14+47mPakistan Railways

    Seen on 5 of 5 days, ranging +24m to +56m. Every train at Bhan Sayadabad →

  • 8Daduscheduled 10:50+32m5 days
    DayArrivedDelayRecorded by
    Tue 20 Oct11:31+32mPakistan Railways
    Sat 17 Oct11:15+16mPakistan Railways
    Wed 14 Oct11:48+49mPakistan Railways
    Mon 12 Oct11:31+32mPakistan Railways
    Fri 9 Oct11:38+39mPakistan Railways

    Seen on 5 of 5 days, ranging +16m to +49m. Every train at Dadu →

  • 9Phuljischeduled 11:14+1h085 days
    DayArrivedDelayRecorded by
    Tue 20 Octarrived, time not recorded+1h08Pakistan Railways
    Sat 17 Oct11:53+37mPakistan Railways
    Wed 14 Oct12:28+1h12Pakistan Railways
    Mon 12 Oct12:19+1h03Pakistan Railways
    Fri 9 Oct12:28+1h12Pakistan Railways

    Seen on 5 of 5 days, ranging +37m to +1h12. Every train at Phulji →

  • 10Piaro Goth (Halt)scheduled 11:29+1h145 days
    DayArrivedDelayRecorded by
    Tue 20 Oct12:45+1h14Pakistan Railways
    Sat 17 Oct12:13+43mPakistan Railways
    Wed 14 Oct12:49+1h19Pakistan Railways
    Mon 12 Oct12:40+1h09Pakistan Railways
    Fri 9 Oct12:53+1h23Pakistan Railways

    Seen on 5 of 5 days, ranging +43m to +1h23. Every train at Piaro Goth (Halt) →

  • 11Rehmani Nagarscheduled 11:50+1h214 days
    DayArrivedDelayRecorded by
    Tue 20 Oct13:16+1h24Pakistan Railways
    Sat 17 Oct12:34+42mPakistan Railways
    Wed 14 Oct13:09+1h18Pakistan Railways
    Mon 12 Octnot recorded—
    Fri 9 Oct13:18+1h29Pakistan Railways

    Seen on 4 of 5 days, ranging +42m to +1h29. Every train at Rehmani Nagar →

  • 12Bali Shahscheduled 12:02+1h245 days
    DayArrivedDelayRecorded by
    Tue 20 Oct14:17+1h44Pakistan Railways
    Sat 17 Oct13:02+51mPakistan Railways
    Wed 14 Oct13:32+1h21Pakistan Railways
    Mon 12 Octarrived, time not recorded+1h24Pakistan Railways
    Fri 9 Oct13:59+1h48Pakistan Railways

    Seen on 5 of 5 days, ranging +51m to +1h48. Every train at Bali Shah →

  • 13Radhanscheduled 12:28+1h435 days
    DayArrivedDelayRecorded by
    Tue 20 Oct14:17+1h48Pakistan Railways
    Sat 17 Oct13:20+52mPakistan Railways
    Wed 14 Oct13:56+1h26Pakistan Railways
    Mon 12 Octarrived, time not recorded+1h43Pakistan Railways
    Fri 9 Oct14:42+2h13Pakistan Railways

    Seen on 5 of 5 days, ranging +52m to +2h13. Every train at Radhan →

  • 14Siharscheduled 12:40+1h495 days
    DayArrivedDelayRecorded by
    Tue 20 Oct14:47+2h07Pakistan Railways
    Sat 17 Oct14:29+1h49Pakistan Railways
    Wed 14 Oct14:19+1h40Pakistan Railways
    Mon 12 Oct14:27+1h47Pakistan Railways
    Fri 9 Octarrived, time not recorded+2h50Pakistan Railways

    Seen on 5 of 5 days, ranging +1h40 to +2h50. Every train at Sihar →

  • 15Badahscheduled 12:52+1h575 days
    DayArrivedDelayRecorded by
    Tue 20 Octarrived, time not recorded+2h12Pakistan Railways
    Sat 17 Oct14:48+1h54Pakistan Railways
    Wed 14 Oct14:39+1h46Pakistan Railways
    Mon 12 Oct14:50+1h57Pakistan Railways
    Fri 9 Oct15:43+2h49Pakistan Railways

    Seen on 5 of 5 days, ranging +1h46 to +2h49. Every train at Badah →

  • 16Mohinjo Daroscheduled 13:02+2h045 days
    DayArrivedDelayRecorded by
    Tue 20 Oct15:19+2h15Pakistan Railways
    Sat 17 Oct15:03+2h01Pakistan Railways
    Wed 14 Oct14:50+1h49Train GPS
    Mon 12 Oct15:07+2h04Pakistan Railways
    Fri 9 Oct16:00+2h56Pakistan Railways

    Seen on 5 of 5 days, ranging +1h49 to +2h56. Every train at Mohinjo Daro →

  • 17Bakrani Roadscheduled 13:35+1h535 days
    DayArrivedDelayRecorded by
    Tue 20 Oct15:36+2hPakistan Railways
    Sat 17 Oct15:51+1h49Pakistan Railways
    Wed 14 Oct15:47+1h41Pakistan Railways
    Mon 12 Oct15:29+1h53Pakistan Railways
    Fri 9 Oct16:19+2h45Pakistan Railways

    Seen on 5 of 5 days, ranging +1h41 to +2h45. Every train at Bakrani Road →

  • 18Larkana Jn.scheduled 14:00+1h505 days
    DayArrivedDelayRecorded by
    Tue 20 Oct16:10+2h01Pakistan Railways
    Sat 17 Oct15:51+1h41Pakistan Railways
    Wed 14 Oct15:38+1h28Pakistan Railways
    Mon 12 Oct15:58+1h50Pakistan Railways
    Fri 9 Oct16:54+2h45Pakistan Railways

    Seen on 5 of 5 days, ranging +1h28 to +2h45. Every train at Larkana Jn. →

  • 19Shahnawaz Bhuttoscheduled 14:39+2h145 days
    DayArrivedDelayRecorded by
    Tue 20 Oct16:54+2h14Pakistan Railways
    Sat 17 Oct16:33+1h53Pakistan Railways
    Wed 14 Oct16:25+1h44Pakistan Railways
    Mon 12 Oct17:04+2h23Pakistan Railways
    Fri 9 Oct17:50+3h10Pakistan Railways

    Seen on 5 of 5 days, ranging +1h44 to +3h10. Every train at Shahnawaz Bhutto →

  • 20Madeji Roadscheduled 15:06+2h095 days
    DayArrivedDelayRecorded by
    Tue 20 Oct17:15+2h09Pakistan Railways
    Sat 17 Oct16:56+1h48Pakistan Railways
    Wed 14 Oct16:47+1h41Pakistan Railways
    Mon 12 Oct17:26+2h20Pakistan Railways
    Fri 9 Oct18:17+3h10Pakistan Railways

    Seen on 5 of 5 days, ranging +1h41 to +3h10. Every train at Madeji Road →

  • 21Rukscheduled 15:37+2h075 days
    DayArrivedDelayRecorded by
    Tue 20 Oct17:47+2h07Pakistan Railways
    Sat 17 Oct17:30+1h50Pakistan Railways
    Wed 14 Oct17:20+1h39Pakistan Railways
    Mon 12 Oct18:05+2h25Pakistan Railways
    Fri 9 Oct18:58+3h17Pakistan Railways

    Seen on 5 of 5 days, ranging +1h39 to +3h17. Every train at Ruk →

  • 22Habib Kot Jn.scheduled 16:05+1h575 days
    DayArrivedDelayRecorded by
    Tue 20 Oct18:02+1h57Pakistan Railways
    Sat 17 Oct18:05+1h28Pakistan Railways
    Wed 14 Oct18:01+1h23Pakistan Railways
    Mon 12 Oct18:20+2h15Pakistan Railways
    Fri 9 Oct19:17+3h13Pakistan Railways

    Seen on 5 of 5 days, ranging +1h23 to +3h13. Every train at Habib Kot Jn. →

  • 23Sukkurscheduled 17:25+1h585 days
    DayArrivedDelayRecorded by
    Tue 20 Oct19:31+1h58Pakistan Railways
    Sat 17 Oct18:50+1h16Pakistan Railways
    Wed 14 Oct18:53+1h18Pakistan Railways
    Mon 12 Oct19:43+2h08Pakistan Railways
    Fri 9 Oct20:58+3h25Pakistan Railways

    Seen on 5 of 5 days, ranging +1h16 to +3h25. Every train at Sukkur →

  • 24Rohri Jn.scheduled 17:50+2h103 days
    DayArrivedDelayRecorded by
    Tue 20 Oct20:00+2h10Train GPS
    Sat 17 Octnot recorded—
    Wed 14 Oct19:30+1h40Train GPS
    Mon 12 Oct20:29+2h39Train GPS
    Fri 9 Octnot recorded—

    Seen on 3 of 5 days, ranging +1h40 to +2h39. Every train at Rohri Jn. →

What the marks mean
  • Tap a station — each day’s arrival, delay and recorder
  • Green — within 15 minutes of the scheduled time
  • Amber — 16 to 45 minutes late
  • Red — over 45 minutes late
  • Hollow — not recorded that day
  • Grey — arrived, no delay figure
  • Dash (—) — no delay figure for this stop yet
  • Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
  • The starting station is not listed — a train does not arrive where it begins.

Common questions

Is Mohinjo Daro Passenger 213UP usually late?

We are not saying yet. We do not hold enough recorded arrivals for Mohinjo Daro Passenger 213UP to publish a punctuality figure that would mean anything. The figures appear on this page as the archive fills, and a blank is more honest than a number drawn from two journeys.

What time does Mohinjo Daro Passenger 213UP leave Kotri Jn?

07:00, on the current published timetable. It is booked into Rohri Jn. at 17:50, the day it leaves. Those are booked times. The delay figures on this page are what we recorded against them.

How long does Mohinjo Daro Passenger 213UP take from Kotri Jn to Rohri Jn.?

10h 50m on the timetable. We do not yet hold enough recorded arrivals at Rohri Jn. to say what it takes in practice.

How many stops does Mohinjo Daro Passenger 213UP make?

24 on the current published timetable, from Kotri Jn to Rohri Jn.. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.

All Kotri–Rohri trains →