Rehmani NagarRailway Station
Trains arriving at Rehmani Nagar are typically 89 minutes late — the median delay across 13 recorded arrivals between 30 September 2026 and 20 October 2026.
First departure Bolan Mail 4DN 00:06 · last Khushhal Khan Khatak Express 20Dn 21:02
What this counts
- At Rehmani Nagar itself, not the route-wide figure
- Passenger services only — no light-engine or shunting movements
- Per train: the “Usually late here” column below
- A negative figure means trains typically ran early here, not late
Running now: see today's delays →
Up departures
3 services| Train | Arrival | Departure | Usually late here |
|---|---|---|---|
| 3Bolan Mail 3UPKarachi City To Jacobabad Jn | 00:33 +1d | 00:35 +1d | no figure— |
| 19Khushhal Khan Khatak Express 19UpKarachi City To Peshawar Cantt | 04:14 +1d | 04:16 +1d | no figure— |
| 213Mohinjo Daro Passenger 213UPKotri Jn To Rohri Jn | 11:50 | 11:52 | usually late+1h 21m6 runs |
Down departures
3 services| Train | Arrival | Departure | Usually late here |
|---|---|---|---|
| 4Bolan Mail 4DNJacobabad Jn To Karachi City | 00:04 +1d | 00:06 +1d | no figure— |
| 214Mohinjo Daro Passenger 214DNRohri Jn To Kotri Jn | 12:31 | 12:32 | usually late+2h 49m7 runs |
| 20Khushhal Khan Khatak Express 20DnPeshawar Cantt To Karachi City | 21:00 +1d | 21:02 +1d | no figure— |
— means fewer than 3 runs recorded here so far, or (at a train's starting station) a platform-berth figure we don't publish.
+1d and +2d mark a stop on a later day of the train's own run, not a later date. At Rehmani Nagar, +1d means the stop falls a day after the train set out from its own origin — not tomorrow's date at this station.
What the marks mean
- Arrival · Departure — scheduled local times, published Pakistan Railways timetable
- +1d, +2d — the stop falls on the 2nd (or 3rd) day of the train's own run, counting from the day it starts. It is not a date.
- Usually late here — the median delay at Rehmani Nagar itself over its recorded arrivals: half of its recorded arrivals were later than this. Recorded history, not today's status, and not the delay at the train's destination. A negative figure means the train typically ran early.
- Up · Down — direction as published by Pakistan Railways
Nearby stations
by distance- Bali Shahبالی شاھ10 km
- Piaro Goth (Halt)پیارو گوٹھ11 km
- Radhanرادھن18 km
- Phuljiپھلجی21 km
- Siharسیہار27 km
- Daduدادو36 km
The minutes shown are the typical (median) delay recorded at that station, not travel time to it.
Common questions
How many trains stop at Rehmani Nagar?
6 passenger services call at Rehmani Nagar, Dadu on the current published timetable. 3 run up and 3 run down. That is what is booked to stop, not what stopped today: the recorded arrivals beside each train are the second half of that answer.
What time is the first train from Rehmani Nagar?
The first booked departure is 00:06 (Bolan Mail 4DN) and the last is 21:02 (Khushhal Khan Khatak Express 20Dn). Both are timetable times, and both exclude services that terminate here, which cannot be boarded onward.
Are trains usually late at Rehmani Nagar?
A typical arrival here is 89 minutes late, measured across 13 recorded arrivals (30 September 2026 to 20 October 2026). That is the median for the station as a whole, across every train that calls: an individual service can be much better or much worse, which is what the per-train figures in the timetable below show.