129 Thall Express 129UP تھل ایکسپریس 129اپ
Running 38 min late — heading for Jand Jn, due 18:58 (operator's estimate), 95 km/h. Last crossed Jhammat.
How late is it, usually?
median per recorded stop arrivalEvery figure here is a median, not an average: why we publish a median, not an average. What counts as on time, and why some figures here are blank, is set out in what on time means here, and every threshold behind it.
8 days of recorded arrivals.
Over 33 recorded arrivals (1 Aug – 8 Oct 2026), Thall Express 129UP has typically reached Rawalpindi around 23:18 the day it leaves — on the worst one run in ten, past 23:49 the day it leaves, at Rawalpindi itself. Today's run: track it live →
The “At Rawalpindi” tile above is the arrival at the end of the run; “Typical delay, any stop” averages every stop including the earlier ones, so it usually reads smaller. Where the time goes, below, shows every stop we have recorded.
How long does it take?
scheduled vs recordedScheduled 15h 15m — Multan Cantt to Rawalpindi. Typically 16h 48m, 1h 33m longer.
What these figures cover
- Scheduled — the current timetable, Multan Cantt 06:30 to Rawalpindi 21:45
- Typical journey — from the scheduled departure to the recorded arrival at Rawalpindi; the median of 33 runs
- Bad day — 17h 19m at the 90th percentile: nine runs in ten come in under it
- Keyline — the scheduled time. The solid bar is the typical journey, the faint bar behind it the bad day.
- Recorded arrivals: 1 August to 8 October 2026.
- End to end. For a shorter leg, the stop times are in the timetable below.
Which day is worst?
mean minutes late per recorded arrival, 8-week windowThis is a mean over an 8-week window, not the median (typical) figure above — the two are not directly comparable.
Where the time goes
most of it lost after Multan CanttLeaves Multan Cantt 15 min early · reaches Rawalpindi +1h 33m — +1h 48m lost along the way.
- Multan Cantt06:30ملتان کینٹ15 min early
- Sher Shah Jn06:47شیرشاہ جنکشن+13 min
- Muzaffargarh07:07مظفر گڑھ+20 min
- Mehmood Kot07:36محمود کوٹ+25 min
- Gurmani07:49گرمانی+26 min
- Sanawan08:02سنا وان+25 min
- Kot Addu08:24کوٹ ادو+23 min
- Dera Dinpanah08:36ڈیرہ دین پناہ+28 min
- Ahsan Pur Ahp08:48احسن پور+28 min
- Kot Sultan09:05کوٹ سلطان+26 min
- Layyah09:32لیّہ+24 min
- Doratta09:47دورتہ+26 min
- Karor Lal Esan10:04کرور لعل عیسن+29 min
- Behal10:25بیہل+38 min
- Bhakkar10:44بھکر+54 min
- Darya Khan11:20دریا خان+50 min
- Shah Alam12:03شاہ عالم+36 min
- Kalur Kot12:47کلور کوٹ+32 min
- Piplan13:19پپلاں+36 min
- Alluwali13:44علو والی+33 min
- Kundian Jn14:35کندیاں+23 min
- Mian Wali14:58میانوالی+39 min
- Pai Khel15:20پائ خیل+52 min
- Daud Khel Jn15:35داؤد خیل+1h 03m
- Mukhad Road16:31مکھڈ روڈ+1h 03m
- Injra16:51انجرا+1h 09m
- Khatakbad17:05خٹک آباد+57 min
- Chhab17:21چھب+1h 05m
- Jhammat17:37جھمٹ+1h 05m
- Jand Jn18:22جنڈ جنکشن+50 min
- Domel18:57ڈومیل+57 min
- Basal Jn19:09بسال جنکشن+1h 15m
- Attock City Jn20:05اٹک سٹی جنکشن+42 min
- Faqirabad20:21فقیرآباد+1h
- Hasan Abdal20:39حسن ابدال+1h 06m
- Wah20:45واہ کینٹ+1h 09m
- Taxila Cantt21:02ٹیکسلا کینٹ+1h 16m
- Golra Sharif21:29گولڑہ شریف+1h 23m
- Rawalpindi21:45راولپِنڈى+1h 33m
Where it stands longest past the timetableshortest to longest recorded
- Kundian Jnscheduled 20 min1 min–1h 01m
- Jand Jnscheduled 2 min3–22 min
- Kot Adduscheduled 3 min5–11 min
- Bhakkarscheduled 2 min2–7 min
- Daud Khel Jnscheduled 1 min1–13 min
What the marks mean
- Solid bar — the typical delay at that stop (median of recorded arrivals)
- Faint bar behind — the bad day (90th percentile): worse than nine tenths of recorded arrivals here
- No faint bar — fewer than 7 recorded arrivals at that stop, too thin for a 90th percentile. The solid bar can still show: it needs only 3.
- — (no solid bar either) — fewer than 3 recorded runs at that stop
- A negative figure means the train typically ran early at that stop, not late
- Band — the shortest and the longest stand recorded at that stop. The train has left as early as the first figure.
- Keyline — the scheduled stop, arrival to departure on the timetable below.
- Why a train stands is not recorded — a crossing, a loco change and a red signal all look the same on the clock.
- The five stops that stand longest past the timetable, not every stop — most routes have more. A stop qualifies with 7 or more runs timed in and out, and is skipped where the timetable books no stop, books one over an hour, or where any recorded stand ran past three hours.
- Most time is lost between Multan Cantt and Sher Shah Jn (+28 min)
- Every stop on the current timetable is listed, in order, measured or not.
Timetable
scheduled → actual, 9 October 2026 runThe second time in a cell is what actually happened on the 9 October 2026 run.
| # | Station | Arrival | Departure |
|---|---|---|---|
| 1 | Multan Cantt | — | 06:30 |
| 2 | Sher Shah Jn | 06:46 | 06:47 |
| 3 | Muzaffargarh | 07:03 | 07:07 |
| ⋯ 17 stops | |||
| 4 | Mehmood Kot | 07:35 | 07:36 |
| 5 | Gurmani | 07:48 | 07:49 |
| 6 | Sanawan | 08:01 | 08:02 |
| 7 | Kot Addu | 08:21 | 08:24 |
| 8 | Dera Dinpanah | 08:35 | 08:36 |
| 9 | Ahsan Pur Ahp | 08:47 | 08:48 |
| 10 | Kot Sultan | 09:04 | 09:05 |
| 11 | Layyah | 09:27 | 09:32 |
| 12 | Doratta | 09:46 | 09:47 |
| 13 | Karor Lal Esan | 10:02 | 10:04 |
| 14 | Behal | 10:24 | 10:25 |
| 15 | Bhakkar | 10:42 | 10:44 |
| 16 | Darya Khan | 11:18 | 11:20 |
| 17 | Shah Alam | 12:02 | 12:03 |
| 18 | Kalur Kot | 12:45 | 12:47 |
| 19 | Piplan | 13:17 | 13:19 |
| 20 | Alluwali | 13:43 | 13:44 |
| 21 | Kundian Jn | 14:15 | 14:35 |
| 22 | Mian Wali | 14:53 → 15:57·PR | 14:58 → 15:59 |
| 23 | Pai Khel | 15:19 → 16:25·PR | 15:20 → 16:25 |
| 24 | Daud Khel Jn | 15:34 → 16:45·PR | 15:35 |
| 25 | Mukhad Road | 16:30 → 17:18 | 16:31 |
| ⋯ 1 stops | |||
| 26 | Injra | 16:50 | 16:51 |
| 27 | Khatakbad | 17:04 | 17:05 |
| 28 | Chhab | 17:20 → 17:53 | 17:21 |
| 29 | Jhammat | 17:36 | 17:37 |
| ⋯ 8 stops | |||
| 30 | Jand Jn | 18:20 | 18:22 |
| 31 | Domel | 18:56 | 18:57 |
| 32 | Basal Jn | 19:08 | 19:09 |
| 33 | Attock City Jn | 20:00 | 20:05 |
| 34 | Faqirabad | 20:20 | 20:21 |
| 35 | Hasan Abdal | 20:37 | 20:39 |
| 36 | Wah | 20:44 | 20:45 |
| 37 | Taxila Cantt | 21:00 | 21:02 |
| 38 | Golra Sharif | 21:27 | 21:29 |
| 39 | Rawalpindi | 21:45 | 21:45 |
What the marks mean
- → 21:28 — actual time on the 9 October 2026 run
- ·PR — Pakistan Railways' own record; unmarked is from the train's GPS
- +1d — the stop falls on a later day of the train's own run, counting from the day it starts. It is not a date.
- Blank — not recorded
A full recorded run: 18 August 2026 →
Station by station, last 5 days
104 arrivals recordedOne mark per day, newest first.
A run’s GPS trail is decoded after the journey completes — recent days may link later.
2Sher Shah Jnscheduled 06:46+11m2 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 07:04 +18m Pakistan Railways Wed 7 Oct 06:50 +3m Pakistan Railways Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 2 of 5 days, ranging +3m to +18m. Every train at Sher Shah Jn →
3Muzaffargarhscheduled 07:03+19m2 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 07:34 +27m Pakistan Railways Wed 7 Oct 07:14 +11m Train GPS Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 2 of 5 days, ranging +11m to +27m. Every train at Muzaffargarh →
4Mehmood Kotscheduled 07:35+37m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 08:12 +37m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Mehmood Kot →
5Gurmanischeduled 07:48+38m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 08:26 +38m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Gurmani →
6Sanawanscheduled 08:01+37m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 08:39 +37m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Sanawan →
7Kot Adduscheduled 08:21+44m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct arrived, time not recorded +44m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Kot Addu →
8Dera Dinpanahscheduled 08:35+43m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 09:19 +43m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Dera Dinpanah →
9Ahsan Pur Ahpscheduled 08:47+43m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 09:31 +43m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Ahsan Pur Ahp →
10Kot Sultanscheduled 09:04+42m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 09:47 +42m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Kot Sultan →
11Layyahscheduled 09:27+41m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 10:13 +41m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Layyah →
12Dorattascheduled 09:46+51m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 10:33 +51m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Doratta →
13Karor Lal Esanscheduled 10:02+49m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 10:52 +49m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Karor Lal Esan →
14Behalscheduled 10:24+56m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 11:20 +56m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Behal →
15Bhakkarscheduled 10:42+1h091 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 11:52 +1h09 Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Bhakkar →
16Darya Khanscheduled 11:18+1h041 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 12:27 +1h04 Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Darya Khan →
17Shah Alamscheduled 12:02+51m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 12:53 +51m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Shah Alam →
18Kalur Kotscheduled 12:45+47m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 13:33 +47m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Kalur Kot →
19Piplanscheduled 13:17+52m1 day
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 14:10 +52m Pakistan Railways Wed 7 Oct not recorded — Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 1 of 5 days. Every train at Piplan →
20Alluwalischeduled 13:43+39m2 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 14:30 +47m Pakistan Railways Wed 7 Oct arrived, time not recorded +30m Pakistan Railways Tue 6 Oct not recorded — Sun 4 Oct not recorded — Seen on 2 of 5 days, ranging +30m to +47m. Every train at Alluwali →
21Kundian Jnscheduled 14:15+23m5 days
Day Arrived Delay Recorded by Fri 9 Oct arrived, time not recorded +23m Pakistan Railways Thu 8 Oct 14:59 +24m Pakistan Railways Wed 7 Oct 14:46 +11m Pakistan Railways Tue 6 Oct arrived, time not recorded +23m Pakistan Railways Sun 4 Oct arrived, time not recorded +31m Pakistan Railways Seen on 5 of 5 days, ranging +11m to +31m. Every train at Kundian Jn →
22Mian Walischeduled 14:53+48m5 days
Day Arrived Delay Recorded by Fri 9 Oct 15:57 +59m Pakistan Railways Thu 8 Oct 15:45 +48m Pakistan Railways Wed 7 Oct 15:35 +37m Pakistan Railways Tue 6 Oct 16:49 +1h51 Pakistan Railways Sun 4 Oct 15:28 +30m Pakistan Railways Seen on 5 of 5 days, ranging +30m to +1h51. Every train at Mian Wali →
23Pai Khelscheduled 15:19+1h015 days
Day Arrived Delay Recorded by Fri 9 Oct 16:25 +1h07 Pakistan Railways Thu 8 Oct 16:19 +1h01 Pakistan Railways Wed 7 Oct 16:13 +54m Pakistan Railways Tue 6 Oct 17:24 +2h05 Pakistan Railways Sun 4 Oct 16:06 +46m Pakistan Railways Seen on 5 of 5 days, ranging +46m to +2h05. Every train at Pai Khel →
24Daud Khel Jnscheduled 15:34+1h135 days
Day Arrived Delay Recorded by Fri 9 Oct 16:45 +1h14 Pakistan Railways Thu 8 Oct 16:48 +1h13 Pakistan Railways Wed 7 Oct 16:38 +1h03 Pakistan Railways Tue 6 Oct 17:51 +2h17 Pakistan Railways Sun 4 Oct 16:35 +1h03 Pakistan Railways Seen on 5 of 5 days, ranging +1h03 to +2h17. Every train at Daud Khel Jn →
25Mukhad Roadscheduled 16:30+1h074 days
Day Arrived Delay Recorded by Fri 9 Oct 17:18 +49m Train GPS Thu 8 Oct 17:39 +1h10 Train GPS Wed 7 Oct not recorded — Tue 6 Oct 18:39 +2h09 Train GPS Sun 4 Oct 17:35 +1h04 Pakistan Railways Seen on 4 of 5 days, ranging +49m to +2h09. Every train at Mukhad Road →
26Injrascheduled 16:50+1h173 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 18:12 +1h23 Pakistan Railways Wed 7 Oct 17:56 +1h07 Pakistan Railways Tue 6 Oct not recorded — Sun 4 Oct 18:08 +1h17 Pakistan Railways Seen on 3 of 5 days, ranging +1h07 to +1h23. Every train at Injra →
27Khatakbadscheduled 17:04+1h065 days
Day Arrived Delay Recorded by Fri 9 Oct arrived, time not recorded +40m Pakistan Railways Thu 8 Oct 18:22 +1h12 Pakistan Railways Wed 7 Oct 18:04 +55m Pakistan Railways Tue 6 Oct arrived, time not recorded +2h16 Pakistan Railways Sun 4 Oct 18:17 +1h06 Pakistan Railways Seen on 5 of 5 days, ranging +40m to +2h16. Every train at Khatakbad →
28Chhabscheduled 17:20+1h085 days
Day Arrived Delay Recorded by Fri 9 Oct 17:53 +33m Train GPS Thu 8 Oct arrived, time not recorded +1h20 Pakistan Railways Wed 7 Oct 18:16 +55m Pakistan Railways Tue 6 Oct 19:38 +2h17 Pakistan Railways Sun 4 Oct 18:28 +1h08 Pakistan Railways Seen on 5 of 5 days, ranging +33m to +2h17. Every train at Chhab →
29Jhammatscheduled 17:36+1h165 days
Day Arrived Delay Recorded by Fri 9 Oct arrived, time not recorded +38m Pakistan Railways Thu 8 Oct 18:59 +1h30 Pakistan Railways Wed 7 Oct arrived, time not recorded +44m Pakistan Railways Tue 6 Oct 19:52 +2h15 Pakistan Railways Sun 4 Oct arrived, time not recorded +1h16 Pakistan Railways Seen on 5 of 5 days, ranging +38m to +2h15. Every train at Jhammat →
30Jand Jnscheduled 18:20+1h344 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 19:51 +1h30 Pakistan Railways Wed 7 Oct 19:03 +42m Pakistan Railways Tue 6 Oct 20:24 +2h03 Pakistan Railways Sun 4 Oct 20:00 +1h38 Pakistan Railways Seen on 4 of 5 days, ranging +42m to +2h03. Every train at Jand Jn →
31Domelscheduled 18:56+1h284 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 20:17 +1h22 Pakistan Railways Wed 7 Oct 19:39 +35m Pakistan Railways Tue 6 Oct 20:55 +1h58 Pakistan Railways Sun 4 Oct 20:31 +1h34 Pakistan Railways Seen on 4 of 5 days, ranging +35m to +1h58. Every train at Domel →
32Basal Jnscheduled 19:08+1h264 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct arrived, time not recorded +1h15 Pakistan Railways Wed 7 Oct arrived, time not recorded +30m Pakistan Railways Tue 6 Oct 21:14 +1h58 Pakistan Railways Sun 4 Oct arrived, time not recorded +1h36 Pakistan Railways Seen on 4 of 5 days, ranging +30m to +1h58. Every train at Basal Jn →
33Attock City Jnscheduled 20:00+1h154 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 21:22 +1h07 Pakistan Railways Wed 7 Oct 20:19 +19m Pakistan Railways Tue 6 Oct 21:51 +1h46 Pakistan Railways Sun 4 Oct arrived, time not recorded +1h23 Pakistan Railways Seen on 4 of 5 days, ranging +19m to +1h46. Every train at Attock City Jn →
34Faqirabadscheduled 20:20+1h284 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 21:49 +1h23 Pakistan Railways Wed 7 Oct 20:59 +38m Pakistan Railways Tue 6 Oct 22:26 +2h05 Pakistan Railways Sun 4 Oct 21:54 +1h33 Pakistan Railways Seen on 4 of 5 days, ranging +38m to +2h05. Every train at Faqirabad →
35Hasan Abdalscheduled 20:37+1h384 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 22:17 +1h39 Pakistan Railways Wed 7 Oct 21:17 +39m Pakistan Railways Tue 6 Oct 22:47 +2h09 Pakistan Railways Sun 4 Oct 22:15 +1h36 Pakistan Railways Seen on 4 of 5 days, ranging +39m to +2h09. Every train at Hasan Abdal →
36Wahscheduled 20:44+1h414 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 22:30 +1h42 Pakistan Railways Wed 7 Oct 21:26 +42m Pakistan Railways Tue 6 Oct 22:56 +2h11 Pakistan Railways Sun 4 Oct 22:24 +1h40 Pakistan Railways Seen on 4 of 5 days, ranging +42m to +2h11. Every train at Wah →
37Taxila Canttscheduled 21:00+1h414 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 22:47 +1h44 Pakistan Railways Wed 7 Oct 21:41 +40m Pakistan Railways Tue 6 Oct 23:12 +2h11 Pakistan Railways Sun 4 Oct 22:39 +1h38 Pakistan Railways Seen on 4 of 5 days, ranging +40m to +2h11. Every train at Taxila Cantt →
38Golra Sharifscheduled 21:27+1h434 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 23:10 +1h42 Pakistan Railways Wed 7 Oct 22:11 +42m Pakistan Railways Tue 6 Oct 23:44 +2h16 Pakistan Railways Sun 4 Oct 23:12 +1h43 Pakistan Railways Seen on 4 of 5 days, ranging +42m to +2h16. Every train at Golra Sharif →
39Rawalpindischeduled 21:45+2h044 days
Day Arrived Delay Recorded by Fri 9 Oct not recorded — Thu 8 Oct 23:49 +2h04 Train GPS Wed 7 Oct 22:35 +51m Train GPS Tue 6 Oct 00:19 +2h34 Train GPS Sun 4 Oct 23:49 +2h04 Train GPS Seen on 4 of 5 days, ranging +51m to +2h34. Every train at Rawalpindi →
What the marks mean
- Tap a station — each day’s arrival, delay and recorder
- Green — within 15 minutes of the scheduled time
- Amber — 16 to 45 minutes late
- Red — over 45 minutes late
- Hollow — not recorded that day
- Grey — arrived, no delay figure
- Dash (—) — no delay figure for this stop yet
- Pakistan Railways — its own arrival record; Train GPS — measured from the train’s position
- The starting station is not listed — a train does not arrive where it begins.
Common questions
Is Thall Express 129UP usually late?
Typically 93 minutes late arriving at Rawalpindi, measured across 33 recorded arrivals (1 Aug – 8 Oct 2026). That is the median, so half its runs were better than that and half were worse. It is what we recorded happening, not what the timetable books.
How late is Thall Express 129UP on a bad day?
On the worst one run in ten, 124 minutes late into Rawalpindi, against a typical 93 minutes late. Both come from the same 33 recorded arrivals. A bad day is not the worst day we have ever seen; it is the level one run in ten reaches or passes.
What time does Thall Express 129UP leave Multan Cantt?
06:30, on the current published timetable. It is booked into Rawalpindi at 21:45, the day it leaves. Those are booked times. The delay figures on this page are what we recorded against them.
How long does Thall Express 129UP take from Multan Cantt to Rawalpindi?
15h 15m on the timetable. In practice a typical run has taken 16h 48m, measured from recorded arrivals at Rawalpindi.
How many stops does Thall Express 129UP make?
39 on the current published timetable, from Multan Cantt to Rawalpindi. The full stop list, with the times booked at each one, is in the timetable on this page. Not every stop is recorded on every run: we publish arrivals we actually observed rather than filling the gaps.
Where is Thall Express 129UP right now?
The live tracker for this train shows its last reported position and how late it was running at its most recent recorded stop. Position comes from the operator's own feed. When a train is not reporting we say so rather than estimating where it might be.
Other trains on this route
All Multan–Rawalpindi trains →Service history (first year, operating eras) is drawn from Wikipedia's List of Pakistan Railways trains, retrieved 15 August 2026, matched on train number.