Shalimar Express 28DN — within 15 minutes of the scheduled time 39% of the time, typically 27 minutes late, over 7 days of recorded runs across every stop of its full journey, not this segment alone.
Every train, compared
7 of 10 with 7+ daysOver this leg is the CHANGE in a train's delay between Ghotki and Drigh Road on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Ghotki — no booked arrival at Ghotki to measure from at all. Figures cover runs recorded between 30 July 2026 and 6 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 8Tezgam 8DN | 00:25 +1d | 09:55 +1d | 9h 30m | 520 km | — | — | adds 1h · 37 |
| 48Rehman Baba Express 48DN | 06:29 +1d | 16:23 +1d | 9h 54m | 520 km | +1h 56m | 14% | adds 52 min · 32 |
| 14Awam Express 14DN | 07:32 +1d | 18:54 +1d | 11h 22m | 522 km | +2h 14m | 8% | adds 52 min · 37 |
| 12Hazara Express 12DN | 13:38 +1d | 00:00 +2d | 10h 22m | 523 km | — | — | makes up 5 min · 34 |
| 28Shalimar Express 28DN | 18:02 | — +1d | — | not measured yet | +27 min | 39% | no data |
| 2Khyber Mail 2DN | 19:47 +1d | 04:45 +2d | 8h 58m | 521 km | +2h 12m | 8% | adds 1h 11m · 20 |
| 38Fareed Express 38DN | 21:24 | 07:16 +1d | 9h 52m | not measured yet | +44 min | 16% | adds 38 min · 30 |
| 26Bahauddin Zikria Express 26DN | 22:23 | 08:02 +1d | 9h 39m | 523 km | — | — | adds 1h 04m · 23 |
| 46Pakistan Express 46DN | 22:56 | 08:18 +1d | 9h 22m | 520 km | +1h 04m | 4% | adds 58 min · 38 |
| 10Allama Iqbal Express 10DN | 23:17 | 08:48 +1d | 9h 31m | 523 km | +1h 11m | 24% | adds 1h 07m · 34 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Tezgam 8DN8تیزگام 8 ڈاؤن00:25 +1d→09:55 +1d9h 30mno delay figure yetadds 1h over this leg · 37 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن06:29 +1d→16:23 +1d9h 54m14% on time · +1h 56madds 52 min over this leg · 32 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون07:32 +1d→18:54 +1d11h 22m8% on time · +2h 14madds 52 min over this leg · 37 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن13:38 +1d→00:00 +2d10h 22mno delay figure yetmakes up 5 min over this leg · 34 runs
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون18:02→— +1d—39% on time · +27 minno data over this leg
- Khyber Mail 2DN2خیبر میل 2 ڈائون19:47 +1d→04:45 +2d8h 58m8% on time · +2h 12madds 1h 11m over this leg · 20 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون21:24→07:16 +1d9h 52m16% on time · +44 minadds 38 min over this leg · 30 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون22:23→08:02 +1d9h 39mno delay figure yetadds 1h 04m over this leg · 23 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون22:56→08:18 +1d9h 22m4% on time · +1h 04madds 58 min over this leg · 38 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون23:17→08:48 +1d9h 31m24% on time · +1h 11madds 1h 07m over this leg · 34 runs
Travelling the other way? Drigh Road to Ghotki trains →
Common questions
How many trains run from Ghotki to Drigh Road?
10 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Ghotki to Drigh Road?
Khyber Mail 2DN, booked at 8h 58m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Ghotki to Drigh Road is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 39% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 27 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 7 of 10 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Ghotki to Drigh Road?
Yes. 7 of the 10 scheduled services are booked to arrive on a later day than they depart: Hazara Express 12DN, Shalimar Express 28DN, Khyber Mail 2DN, Fareed Express 38DN and others.
Do trains lose time between Ghotki and Drigh Road?
Typically yes. Khyber Mail 2DN adds about 1h 11m to its delay over this leg, measured across 20 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Ghotki to Drigh Road by train?
It is between 520 and 523 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 8 of the 10 services; the rest of the track on this route has not been traced yet.
Are these Ghotki to Drigh Road timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.