Allama Iqbal Express 10DN — within 15 minutes of the scheduled time 27% of the time, typically 45 minutes late, over 27 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Ghotki to Drigh Road it typically adds 59 min, from 56 recorded runs. At Drigh Road it has typically arrived 179 minutes late, from 85 recorded runs.
Every train, compared
9 of 9 with 7+ daysOver this leg is the CHANGE in a train's delay between Ghotki and Drigh Road on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Ghotki — no booked arrival at Ghotki to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 8Tezgam 8DN | 00:25 +1d | 09:55 +1d | 9h 30m | +1h 09m | 16% | adds 1h · 60 |
| 48Rehman Baba Express 48DN | 06:26 +1d | 16:23 +1d | 9h 57m | +2h 22m | 10% | adds 51 min · 46 |
| 14Awam Express 14DN | 07:32 +1d | 18:41 +1d | 11h 09m | +1h 23m | 15% | adds 39 min · 53 |
| 12Hazara Express 12DN | 13:38 +1d | 00:00 +2d | 10h 22m | +1h 38m | 14% | makes up 1 min · 58 |
| 2Khyber Mail 2DN | 20:12 +1d | 05:48 +2d | 9h 36m | +1h 59m | 7% | adds 50 min · 29 |
| 38Fareed Express 38DN | 21:24 | 07:16 +1d | 9h 52m | +1h 04m | 16% | adds 36 min · 53 |
| 26Bahauddin Zikria Express 26DN | 22:23 | 08:02 +1d | 9h 39m | +1h 34m | 9% | adds 1h 02m · 44 |
| 46Pakistan Express 46DN | 22:56 | 08:18 +1d | 9h 22m | +2h 31m | 4% | adds 52 min · 62 |
| 10Allama Iqbal Express 10DN | 23:17 | 08:48 +1d | 9h 31m | +45 min | 27% | adds 59 min · 56 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Tezgam 8DN8تیزگام 8 ڈاؤن00:25 +1d→09:55 +1d9h 30m16% on time · +1h 09madds 1h over this leg · 60 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن06:26 +1d→16:23 +1d9h 57m10% on time · +2h 22madds 51 min over this leg · 46 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون07:32 +1d→18:41 +1d11h 09m15% on time · +1h 23madds 39 min over this leg · 53 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن13:38 +1d→00:00 +2d10h 22m14% on time · +1h 38mmakes up 1 min over this leg · 58 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون20:12 +1d→05:48 +2d9h 36m7% on time · +1h 59madds 50 min over this leg · 29 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون21:24→07:16 +1d9h 52m16% on time · +1h 04madds 36 min over this leg · 53 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون22:23→08:02 +1d9h 39m9% on time · +1h 34madds 1h 02m over this leg · 44 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون22:56→08:18 +1d9h 22m4% on time · +2h 31madds 52 min over this leg · 62 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون23:17→08:48 +1d9h 31m27% on time · +45 minadds 59 min over this leg · 56 runs
Travelling the other way? Drigh Road to Ghotki trains →
Common questions
How many trains run from Ghotki to Drigh Road?
9 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Ghotki to Drigh Road?
Pakistan Express 46DN, booked at 9h 22m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Ghotki to Drigh Road is most likely to be on time?
Allama Iqbal Express 10DN has the best recorded punctuality of the services we hold enough history for: 27% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 45 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 9 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Ghotki to Drigh Road?
Yes. 6 of the 9 scheduled services are booked to arrive on a later day than they depart: Hazara Express 12DN, Khyber Mail 2DN, Fareed Express 38DN, Bahauddin Zikria Express 26DN and others.
Do trains lose time between Ghotki and Drigh Road?
Typically yes. Bahauddin Zikria Express 26DN adds about 1h 02m to its delay over this leg, measured across 44 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Ghotki to Drigh Road timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.