Karachi Cantt to Bahawalpur
Green Line 5UP — within 15 minutes of the scheduled time 26% of the time, typically 39 minutes late, over 10 days of recorded runs across every stop of its full journey, not this segment alone. At Bahawalpur it has typically arrived 85 minutes late, from 47 recorded runs.
Every train, compared
14 of 17 with 7+ daysOver this leg is the CHANGE in a train's delay between Karachi Cantt and Bahawalpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Karachi Cantt — no booked arrival at Karachi Cantt to measure from at all. Figures cover runs recorded between 31 July 2026 and 7 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 27Shalimar Express 27UP | 06:45 | 18:39 | 11h 54m | 831 km | +1h 02m | 18% | no data |
| 11Hazara Express 11UP | 07:00 | 22:22 | 15h 22m | 830 km | +53 min | 22% | adds 1h 02m · 28 |
| 13Awam Express 13UP | 07:30 | 23:54 | 16h 24m | 830 km | +1h 43m | 6% | no data |
| 47Rehman Baba Express 47UP | 12:00 | 01:55 +1d | 13h 55m | 827 km | +1h 46m | 10% | no data |
| 45Pakistan Express 45UP | 14:00 | 03:50 +1d | 13h 50m | 825 km | +2h 15m | 3% | no data |
| 41Karakoram Express 41UP | 15:00 | 03:20 +1d | 12h 20m | 822 km | — | — | no data |
| 9Allama Iqbal Express 9UP | 15:30 | 05:36 +1d | 14h 06m | 826 km | +2h 45m | 5% | no data |
| 33Pak Business 33UP | 16:00 | 04:43 +1d | 12h 43m | 820 km | +1h 54m | 10% | no data |
| 17Millat Express 17UP | 17:00 | 06:50 +1d | 13h 50m | 824 km | +3h 27m | 0% | no data |
| 7Tezgam 7UP | 17:30 | 07:16 +1d | 13h 46m | 820 km | +1h 57m | 5% | no data |
| 15Karachi Express 15UP | 18:00 | 06:30 +1d | 12h 30m | 823 km | +2h | 10% | no data |
| 25Bahauddin Zikria Express 25UP | 18:50 | 08:41 +1d | 13h 51m | 829 km | +2h | 6% | adds 3h 28m · 20 |
| 37Fareed Express 37UP | 19:50 | 11:55 +1d | 16h 05m | 831 km | +1h 22m | 7% | adds 47 min · 24 |
| 43Shah Hussain Express 43UP | 21:00 | 09:03 +1d | 12h 03m | 822 km | — | — | no data |
| 35Sir Sayyed Express 35UP | 21:00 | 09:30 +1d | 12h 30m | 824 km | — | — | no data |
| 5Green Line 5UP | 22:00 | 10:20 +1d | 12h 20m | 822 km | +39 min | 26% | no data |
| 1Khyber Mail 1UP | 22:15 | 11:55 +1d | 13h 40m | 829 km | +1h 45m | 9% | no data |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Shalimar Express 27UP27شالیمار ایکسپریس 27 اپ06:45→18:3911h 54m18% on time · +1h 02mno data over this leg
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ07:00→22:2215h 22m22% on time · +53 minadds 1h 02m over this leg · 28 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ07:30→23:5416h 24m6% on time · +1h 43mno data over this leg
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ12:00→01:55 +1d13h 55m10% on time · +1h 46mno data over this leg
- Pakistan Express 45UP45پاکستان ایکسپریس 45 اپ14:00→03:50 +1d13h 50m3% on time · +2h 15mno data over this leg
- Karakoram Express 41UP41قراقرم ایکسپریس 41 اپ15:00→03:20 +1d12h 20mno delay figure yetno data over this leg
- Allama Iqbal Express 9UP9علامہ اقبال ایکسپریس 9 اپ15:30→05:36 +1d14h 06m5% on time · +2h 45mno data over this leg
- Pak Business 33UP33پاک بزنس 33 اپ16:00→04:43 +1d12h 43m10% on time · +1h 54mno data over this leg
- Millat Express 17UP17ملت ایکسپریس 17 اپ17:00→06:50 +1d13h 50m0% on time · +3h 27mno data over this leg
- Tezgam 7UP7تيزگام 7 اپ17:30→07:16 +1d13h 46m5% on time · +1h 57mno data over this leg
- Karachi Express 15UP15کراچی ایکسپریس 15 اپ18:00→06:30 +1d12h 30m10% on time · +2hno data over this leg
- Bahauddin Zikria Express 25UP25بہائو الدین زکریا ایکسپری25 اپ18:50→08:41 +1d13h 51m6% on time · +2hadds 3h 28m over this leg · 20 runs
- Fareed Express 37UP37فرید ایکسپریس 37 اپ19:50→11:55 +1d16h 05m7% on time · +1h 22madds 47 min over this leg · 24 runs
- Shah Hussain Express 43UP43شاہ حسین ایکسپریس 43اپ21:00→09:03 +1d12h 03mno delay figure yetno data over this leg
- Sir Sayyed Express 35UP35سر سید ایکپریس 35اپ21:00→09:30 +1d12h 30mno delay figure yetno data over this leg
- Green Line 5UP5گرين لائن5 اپ22:00→10:20 +1d12h 20m26% on time · +39 minno data over this leg
- Khyber Mail 1UP1خیبر میل 1 اپ22:15→11:55 +1d13h 40m9% on time · +1h 45mno data over this leg
Travelling the other way? Bahawalpur to Karachi Cantt trains →
Common questions
How many trains run from Karachi Cantt to Bahawalpur?
17 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Karachi Cantt to Bahawalpur?
Shalimar Express 27UP, booked at 11h 54m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Karachi Cantt to Bahawalpur is most likely to be on time?
Green Line 5UP has the best recorded punctuality of the services we hold enough history for: 26% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 39 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 14 of 17 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Karachi Cantt to Bahawalpur?
Yes. 14 of the 17 scheduled services are booked to arrive on a later day than they depart: Rehman Baba Express 47UP, Pakistan Express 45UP, Karakoram Express 41UP, Allama Iqbal Express 9UP and others.
Do trains lose time between Karachi Cantt and Bahawalpur?
Typically yes. Bahauddin Zikria Express 25UP adds about 3h 28m to its delay over this leg, measured across 20 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Karachi Cantt to Bahawalpur by train?
It is between 820 and 831 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails.
Are these Karachi Cantt to Bahawalpur timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.