latetrains.pkLate, on recordTrain delays · independent
Stations/Khanewal Jn/Khanewal Jn → Bahawalpur

Khanewal Jn to Bahawalpur

15 scheduled services · fastest about 1h 13m · 107 km (measured on 1 of 15)
Khanewal se Bahawalpur ki train — timing aur delay record.
15Scheduled services
1h 13mFastest booked
2h 40mSlowest booked
3Overnight services
13 of 15With a delay record
KHANEWALBAHAWALPURKHANEWAL
خانیوال ۔ بہاولپور ۔ خانیوال
Most reliable choice

Green Line 6DN — within 15 minutes of the scheduled time 36% of the time, typically 56 minutes late, over 25 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Khanewal Jn to Bahawalpur it typically adds 24 min, from 62 recorded runs. At Bahawalpur it has typically arrived 75 minutes late, from 90 recorded runs.

Every train, compared

13 of 15 with 7+ days

Over this leg is the CHANGE in a train's delay between Khanewal Jn and Bahawalpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Khanewal Jn — no booked arrival at Khanewal Jn to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.

TrainDepartsArrivesDurationDistanceTypical delayOn-timeOver this leg
6Green Line 6DN00:25 +1d01:38 +1d1h 13m107 km+56 min36%adds 24 min · 62
48Rehman Baba Express 48DN00:27 +1d02:40 +1d2h 13mnot measured yet+2h 24m10%adds 15 min · 60
44Shah Hussain Express 44DN02:10 +1d03:34 +1d1h 24mnot measured yet——no data
12Hazara Express 12DN06:00 +1d08:40 +1d2h 40mnot measured yet+1h 35m14%adds 19 min · 41
2Khyber Mail 2DN12:55 +1d15:10 +1d2h 15mnot measured yet+2h7%adds 11 min · 46
46Pakistan Express 46DN16:3518:502h 15mnot measured yet+2h 27m4%adds 31 min · 58
10Allama Iqbal Express 10DN17:2519:151h 50mnot measured yet+43 min28%adds 12 min · 61
8Tezgam 8DN18:1520:252h 10mnot measured yet+1h 09m16%adds 17 min · 62
18Millat Express 18DN18:5020:151h 25mnot measured yet+1h 04m30%adds 19 min · 50
34Pak Business 34DN19:2520:501h 25mnot measured yet+2h 28m9%adds 24 min · 57
40Jaffar Express 40DN20:1022:252h 15mnot measured yet+50 min20%adds 15 min · 44
42Karakoram Express 42DN21:3022:521h 22mnot measured yet+1h 36m19%adds 37 min · 41
16Karachi Express 16DN22:0000:16 +1d2h 16mnot measured yet+2h 40m8%adds 12 min · 59
36Sir Sayyed Express 36DN23:2500:48 +1d1h 23mnot measured yet——no data
14Awam Express 14DN23:5002:21 +1d2h 31mnot measured yet+1h 20m15%adds 17 min · 53
What the marks mean
  • Departs · Arrives — scheduled local times, published Pakistan Railways timetable
  • +1d — a stop on a later day of the train's own run, not a date
  • Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
  • — — fewer than 7 days of recorded runs for that train
  • Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
  • A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
  • — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.

Every service in detail

Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.

Travelling the other way? Bahawalpur to Khanewal Jn trains →

Common questions

How many trains run from Khanewal Jn to Bahawalpur?

15 scheduled services on the current published timetable. That is what is booked to run, not what ran today.

Which is the fastest train from Khanewal Jn to Bahawalpur?

Green Line 6DN, booked at 1h 13m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.

Which train from Khanewal Jn to Bahawalpur is most likely to be on time?

Green Line 6DN has the best recorded punctuality of the services we hold enough history for: 36% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 56 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 13 of 15 services on this route currently have enough recorded history to rank at all.

Is there an overnight train from Khanewal Jn to Bahawalpur?

Yes. 3 of the 15 scheduled services are booked to arrive on a later day than they depart: Karachi Express 16DN, Sir Sayyed Express 36DN, Awam Express 14DN.

Do trains lose time between Khanewal Jn and Bahawalpur?

Typically yes. Karakoram Express 42DN adds about 37 min to its delay over this leg, measured across 41 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.

How far is it from Khanewal Jn to Bahawalpur by train?

It is about 107 km along the track. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 1 of the 15 services; the rest of the track on this route has not been traced yet.

Are these Khanewal Jn to Bahawalpur timings the real arrival times?

No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.

Stations on this line

6 stops
Khanewal JnMultan CanttShujabadGilawalaLodhran JnBahawalpur
direct services only
Khanewal Jn → Karachi Cantt 13 trainsKhanewal Jn → Lahore Jn. 5 trainsKhanewal Jn → Peshawar Cantt 4 trainsKhanewal Jn → Rawalpindi 3 trainsKhanewal Jn → Multan Cantt 2 trainsBahawalpur → Karachi Cantt 14 trains

Khanewal Jn timetable · Bahawalpur timetable