Shalimar Express 28DN — within 15 minutes of the scheduled time 44% of the time, typically 22 minutes late, over 11 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Khanpur Jn. to Hyderabad Jn it typically adds 29 min, from 23 recorded runs. At Hyderabad Jn it has typically arrived 40 minutes late, from 35 recorded runs.
Every train, compared
10 of 10 with 7+ daysOver this leg is the CHANGE in a train's delay between Khanpur Jn. and Hyderabad Jn on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Khanpur Jn. — no booked arrival at Khanpur Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 18Millat Express 18DN | 00:32 +1d | 09:30 +1d | 8h 58m | 517 km | +2h 36m | 10% | adds 1h · 39 |
| 14Awam Express 14DN | 05:00 +1d | 15:55 +1d | 10h 55m | 518 km | +2h 03m | 8% | adds 25 min · 38 |
| 12Hazara Express 12DN | 10:55 +1d | 21:05 +1d | 10h 10m | 518 km | +1h 21m | 10% | makes up 13 min · 35 |
| 28Shalimar Express 28DN | 16:07 | 00:05 +1d | 7h 58m | not measured yet | +22 min | 44% | adds 29 min · 23 |
| 2Khyber Mail 2DN | 17:30 +1d | 02:00 +2d | 8h 30m | 518 km | +2h 09m | 6% | adds 1h 15m · 22 |
| 38Fareed Express 38DN | 18:55 | 04:25 +1d | 9h 30m | not measured yet | +43 min | 14% | adds 7 min · 30 |
| 26Bahauddin Zikria Express 26DN | 20:05 | 05:10 +1d | 9h 05m | 518 km | +1h 08m | 9% | adds 41 min · 21 |
| 46Pakistan Express 46DN | 20:40 | 05:35 +1d | 8h 55m | 516 km | +1h 05m | 6% | adds 1h 06m · 36 |
| 10Allama Iqbal Express 10DN | 21:00 | 06:00 +1d | 9h | 517 km | +54 min | 25% | adds 1h · 35 |
| 8Tezgam 8DN | 22:15 | 07:10 +1d | 8h 55m | 514 km | +52 min | 18% | adds 1h 13m · 37 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون00:32 +1d→09:30 +1d8h 58m10% on time · +2h 36madds 1h over this leg · 39 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون05:00 +1d→15:55 +1d10h 55m8% on time · +2h 03madds 25 min over this leg · 38 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن10:55 +1d→21:05 +1d10h 10m10% on time · +1h 21mmakes up 13 min over this leg · 35 runs
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون16:07→00:05 +1d7h 58m44% on time · +22 minadds 29 min over this leg · 23 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون17:30 +1d→02:00 +2d8h 30m6% on time · +2h 09madds 1h 15m over this leg · 22 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون18:55→04:25 +1d9h 30m14% on time · +43 minadds 7 min over this leg · 30 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون20:05→05:10 +1d9h 05m9% on time · +1h 08madds 41 min over this leg · 21 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون20:40→05:35 +1d8h 55m6% on time · +1h 05madds 1h 06m over this leg · 36 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون21:00→06:00 +1d9h25% on time · +54 minadds 1h over this leg · 35 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن22:15→07:10 +1d8h 55m18% on time · +52 minadds 1h 13m over this leg · 37 runs
Travelling the other way? Hyderabad Jn to Khanpur Jn. trains →
Common questions
How many trains run from Khanpur Jn. to Hyderabad Jn?
10 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Khanpur Jn. to Hyderabad Jn?
Shalimar Express 28DN, booked at 7h 58m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Khanpur Jn. to Hyderabad Jn is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 44% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 22 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 10 of 10 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Khanpur Jn. to Hyderabad Jn?
Yes. 7 of the 10 scheduled services are booked to arrive on a later day than they depart: Shalimar Express 28DN, Khyber Mail 2DN, Fareed Express 38DN, Bahauddin Zikria Express 26DN and others.
Do trains lose time between Khanpur Jn. and Hyderabad Jn?
Typically yes. Khyber Mail 2DN adds about 1h 15m to its delay over this leg, measured across 22 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Khanpur Jn. to Hyderabad Jn by train?
It is between 514 and 518 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 8 of the 10 services; the rest of the track on this route has not been traced yet.
Are these Khanpur Jn. to Hyderabad Jn timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.