Sukkur Express 146DN — within 15 minutes of the scheduled time 42% of the time, typically 18 minutes late, over 10 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Mehrabpur to Hyderabad Jn it typically makes up 8 min, from 34 recorded runs. At Hyderabad Jn it has typically arrived 11 minutes late, from 45 recorded runs.
Every train, compared
9 of 9 with 7+ daysOver this leg is the CHANGE in a train's delay between Mehrabpur and Hyderabad Jn on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Mehrabpur — no booked arrival at Mehrabpur to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 38Fareed Express 38DN | 00:03 +1d | 04:25 +1d | 4h 22m | not measured yet | +43 min | 14% | makes up 13 min · 30 |
| 26Bahauddin Zikria Express 26DN | 01:02 +1d | 05:10 +1d | 4h 08m | 217 km | +1h 08m | 9% | adds 1 min · 23 |
| 10Allama Iqbal Express 10DN | 01:52 +1d | 06:00 +1d | 4h 08m | 216 km | +54 min | 25% | makes up 4 min · 34 |
| 8Tezgam 8DN | 03:04 +1d | 07:10 +1d | 4h 06m | 216 km | +52 min | 18% | no change · 37 |
| 18Millat Express 18DN | 05:28 +1d | 09:30 +1d | 4h 02m | 215 km | +2h 36m | 10% | adds 9 min · 37 |
| 48Rehman Baba Express 48DN | 09:15 +1d | 13:45 +1d | 4h 30m | 216 km | +2h 18m | 13% | makes up 20 min · 34 |
| 14Awam Express 14DN | 10:51 +1d | 15:55 +1d | 5h 04m | 218 km | +2h 03m | 8% | makes up 35 min · 35 |
| 12Hazara Express 12DN | 16:37 +1d | 21:05 +1d | 4h 28m | 218 km | +1h 21m | 10% | makes up 18 min · 32 |
| 146Sukkur Express 146DN | 23:03 | 04:05 +1d | 5h 02m | not measured yet | +18 min | 42% | makes up 8 min · 34 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون00:03 +1d→04:25 +1d4h 22m14% on time · +43 minmakes up 13 min over this leg · 30 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون01:02 +1d→05:10 +1d4h 08m9% on time · +1h 08madds 1 min over this leg · 23 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون01:52 +1d→06:00 +1d4h 08m25% on time · +54 minmakes up 4 min over this leg · 34 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن03:04 +1d→07:10 +1d4h 06m18% on time · +52 minno change over this leg · 37 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون05:28 +1d→09:30 +1d4h 02m10% on time · +2h 36madds 9 min over this leg · 37 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن09:15 +1d→13:45 +1d4h 30m13% on time · +2h 18mmakes up 20 min over this leg · 34 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون10:51 +1d→15:55 +1d5h 04m8% on time · +2h 03mmakes up 35 min over this leg · 35 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن16:37 +1d→21:05 +1d4h 28m10% on time · +1h 21mmakes up 18 min over this leg · 32 runs
- Sukkur Express 146DN146سکھر ایکسپریس146ڈاؤن23:03→04:05 +1d5h 02m42% on time · +18 minmakes up 8 min over this leg · 34 runs
Travelling the other way? Hyderabad Jn to Mehrabpur trains →
Common questions
How many trains run from Mehrabpur to Hyderabad Jn?
9 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Mehrabpur to Hyderabad Jn?
Millat Express 18DN, booked at 4h 02m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Mehrabpur to Hyderabad Jn is most likely to be on time?
Sukkur Express 146DN has the best recorded punctuality of the services we hold enough history for: 42% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 18 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 9 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Mehrabpur to Hyderabad Jn?
Yes. 1 of the 9 scheduled services is booked to arrive on a later day than it departs: Sukkur Express 146DN.
Do trains lose time between Mehrabpur and Hyderabad Jn?
Typically the opposite. Awam Express 14DN makes up about 35 min over this leg across 35 recorded runs. That does not mean it runs early; it means it arrived less late than it departed, which usually says more about how the timetable books this stretch than about the train.
How far is it from Mehrabpur to Hyderabad Jn by train?
It is between 215 and 218 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 7 of the 9 services; the rest of the track on this route has not been traced yet.
Are these Mehrabpur to Hyderabad Jn timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.