Hyderabad Jn to Lahore Jn.
Green Line 5UP — within 15 minutes of the scheduled time 27% of the time, typically 41 minutes late, over 11 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Hyderabad Jn to Lahore Jn. it typically adds 1h 18m, from 36 recorded runs. At Lahore Jn. it has typically arrived 102 minutes late, from 47 recorded runs.
Every train, compared
9 of 11 with 7+ daysOver this leg is the CHANGE in a train's delay between Hyderabad Jn and Lahore Jn. on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Hyderabad Jn — no booked arrival at Hyderabad Jn to measure from at all. Figures cover runs recorded between 30 July 2026 and 5 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 5Green Line 5UP | 00:40 +1d | 15:35 +1d | 14h 55m | 1,044 km | +41 min | 27% | adds 1h 18m · 36 |
| 1Khyber Mail 1UP | 01:10 +1d | 19:30 +1d | 18h 20m | 1,103 km | +1h 39m | 9% | adds 3h 02m · 35 |
| 27Shalimar Express 27UP | 09:25 | 01:55 +1d | 16h 30m | not measured yet | +59 min | 21% | adds 28 min · 23 |
| 13Awam Express 13UP | 10:40 | 07:25 +1d | 20h 45m | 1,104 km | +1h 42m | 6% | adds 1h 04m · 36 |
| 41Karakoram Express 41UP | 17:40 | 10:20 +1d | 16h 40m | not measured yet | — | — | makes up 11 min · 24 |
| 9Allama Iqbal Express 9UP | 18:20 | 12:30 +1d | 18h 10m | 1,044 km | +2h 52m | 5% | adds 1h 55m · 33 |
| 33Pak Business 33UP | 18:40 | 10:20 +1d | 15h 40m | 1,043 km | +2h 01m | 10% | adds 1h 17m · 32 |
| 7Tezgam 7UP | 20:10 | 14:00 +1d | 17h 50m | 1,085 km | +1h 59m | 5% | adds 1h 49m · 35 |
| 15Karachi Express 15UP | 20:40 | 13:00 +1d | 16h 20m | 1,091 km | +1h 45m | 10% | adds 1h 44m · 23 |
| 37Fareed Express 37UP | 23:00 | 22:05 +1d | 23h 05m | 1,090 km | +1h 19m | 8% | adds 1h 12m · 26 |
| 43Shah Hussain Express 43UP | 23:35 | 15:35 +1d | 16h | not measured yet | — | — | no data |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Green Line 5UP5گرين لائن5 اپ00:40 +1d→15:35 +1d14h 55m27% on time · +41 minadds 1h 18m over this leg · 36 runs
- Khyber Mail 1UP1خیبر میل 1 اپ01:10 +1d→19:30 +1d18h 20m9% on time · +1h 39madds 3h 02m over this leg · 35 runs
- Shalimar Express 27UP27شالیمار ایکسپریس 27 اپ09:25→01:55 +1d16h 30m21% on time · +59 minadds 28 min over this leg · 23 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ10:40→07:25 +1d20h 45m6% on time · +1h 42madds 1h 04m over this leg · 36 runs
- Karakoram Express 41UP41قراقرم ایکسپریس 41 اپ17:40→10:20 +1d16h 40mno delay figure yetmakes up 11 min over this leg · 24 runs
- Allama Iqbal Express 9UP9علامہ اقبال ایکسپریس 9 اپ18:20→12:30 +1d18h 10m5% on time · +2h 52madds 1h 55m over this leg · 33 runs
- Pak Business 33UP33پاک بزنس 33 اپ18:40→10:20 +1d15h 40m10% on time · +2h 01madds 1h 17m over this leg · 32 runs
- Tezgam 7UP7تيزگام 7 اپ20:10→14:00 +1d17h 50m5% on time · +1h 59madds 1h 49m over this leg · 35 runs
- Karachi Express 15UP15کراچی ایکسپریس 15 اپ20:40→13:00 +1d16h 20m10% on time · +1h 45madds 1h 44m over this leg · 23 runs
- Fareed Express 37UP37فرید ایکسپریس 37 اپ23:00→22:05 +1d23h 05m8% on time · +1h 19madds 1h 12m over this leg · 26 runs
- Shah Hussain Express 43UP43شاہ حسین ایکسپریس 43اپ23:35→15:35 +1d16hno delay figure yetno data over this leg
Travelling the other way? Lahore Jn. to Hyderabad Jn trains →
Common questions
How many trains run from Hyderabad Jn to Lahore Jn.?
11 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Hyderabad Jn to Lahore Jn.?
Green Line 5UP, booked at 14h 55m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Hyderabad Jn to Lahore Jn. is most likely to be on time?
Green Line 5UP has the best recorded punctuality of the services we hold enough history for: 27% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 41 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 11 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Hyderabad Jn to Lahore Jn.?
Yes. 9 of the 11 scheduled services are booked to arrive on a later day than they depart: Shalimar Express 27UP, Awam Express 13UP, Karakoram Express 41UP, Allama Iqbal Express 9UP and others.
Do trains lose time between Hyderabad Jn and Lahore Jn.?
Typically yes. Khyber Mail 1UP adds about 3h 02m to its delay over this leg, measured across 35 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Hyderabad Jn to Lahore Jn. by train?
It is between 1,043 and 1,104 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 8 of the 11 services; the rest of the track on this route has not been traced yet.
Are these Hyderabad Jn to Lahore Jn. timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.