Hazara Express 11UP — within 15 minutes of the scheduled time 24% of the time, typically 53 minutes late, over 8 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Nawabshah Jn. to Bahawalpur it typically adds 8 min, from 35 recorded runs. At Bahawalpur it has typically arrived 72 minutes late, from 42 recorded runs.
Every train, compared
9 of 12 with 7+ daysOver this leg is the CHANGE in a train's delay between Nawabshah Jn. and Bahawalpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Nawabshah Jn. — no booked arrival at Nawabshah Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 37Fareed Express 37UP | 00:55 +1d | 11:55 +1d | 11h | 542 km | +1h 25m | 6% | adds 2 min · 26 |
| 1Khyber Mail 1UP | 02:45 +1d | 11:55 +1d | 9h 10m | 540 km | +1h 31m | 9% | adds 1h 39m · 33 |
| 27Shalimar Express 27UP | 10:58 | 18:39 | 7h 41m | 542 km | +57 min | 20% | adds 48 min · 24 |
| 11Hazara Express 11UP | 12:00 | 22:22 | 10h 22m | 540 km | +53 min | 24% | adds 8 min · 35 |
| 13Awam Express 13UP | 12:50 | 23:54 | 11h 04m | 542 km | +1h 50m | 5% | adds 37 min · 38 |
| 47Rehman Baba Express 47UP | 16:39 | 01:55 +1d | 9h 16m | 539 km | +1h 32m | 11% | adds 51 min · 34 |
| 9Allama Iqbal Express 9UP | 20:10 | 05:36 +1d | 9h 26m | 537 km | +3h 58m | 4% | adds 34 min · 35 |
| 33Pak Business 33UP | 20:15 | 04:43 +1d | 8h 28m | 534 km | — | — | adds 22 min · 35 |
| 17Millat Express 17UP | 21:34 | 06:50 +1d | 9h 16m | 538 km | +3h 34m | 0% | adds 30 min · 38 |
| 7Tezgam 7UP | 22:00 | 07:16 +1d | 9h 16m | 535 km | +2h 13m | 4% | adds 8 min · 34 |
| 15Karachi Express 15UP | 22:18 | 06:30 +1d | 8h 12m | 537 km | — | — | adds 39 min · 35 |
| 25Bahauddin Zikria Express 25UP | 23:46 | 08:41 +1d | 8h 55m | 540 km | — | — | adds 1h 20m · 22 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Fareed Express 37UP37فرید ایکسپریس 37 اپ00:55 +1d→11:55 +1d11h6% on time · +1h 25madds 2 min over this leg · 26 runs
- Khyber Mail 1UP1خیبر میل 1 اپ02:45 +1d→11:55 +1d9h 10m9% on time · +1h 31madds 1h 39m over this leg · 33 runs
- Shalimar Express 27UP27شالیمار ایکسپریس 27 اپ10:58→18:397h 41m20% on time · +57 minadds 48 min over this leg · 24 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ12:00→22:2210h 22m24% on time · +53 minadds 8 min over this leg · 35 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ12:50→23:5411h 04m5% on time · +1h 50madds 37 min over this leg · 38 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ16:39→01:55 +1d9h 16m11% on time · +1h 32madds 51 min over this leg · 34 runs
- Allama Iqbal Express 9UP9علامہ اقبال ایکسپریس 9 اپ20:10→05:36 +1d9h 26m4% on time · +3h 58madds 34 min over this leg · 35 runs
- Pak Business 33UP33پاک بزنس 33 اپ20:15→04:43 +1d8h 28mno delay figure yetadds 22 min over this leg · 35 runs
- Millat Express 17UP17ملت ایکسپریس 17 اپ21:34→06:50 +1d9h 16m0% on time · +3h 34madds 30 min over this leg · 38 runs
- Tezgam 7UP7تيزگام 7 اپ22:00→07:16 +1d9h 16m4% on time · +2h 13madds 8 min over this leg · 34 runs
- Karachi Express 15UP15کراچی ایکسپریس 15 اپ22:18→06:30 +1d8h 12mno delay figure yetadds 39 min over this leg · 35 runs
- Bahauddin Zikria Express 25UP25بہائو الدین زکریا ایکسپری25 اپ23:46→08:41 +1d8h 55mno delay figure yetadds 1h 20m over this leg · 22 runs
Travelling the other way? Bahawalpur to Nawabshah Jn. trains →
Common questions
How many trains run from Nawabshah Jn. to Bahawalpur?
12 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Nawabshah Jn. to Bahawalpur?
Shalimar Express 27UP, booked at 7h 41m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Nawabshah Jn. to Bahawalpur is most likely to be on time?
Hazara Express 11UP has the best recorded punctuality of the services we hold enough history for: 24% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 53 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 12 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Nawabshah Jn. to Bahawalpur?
Yes. 7 of the 12 scheduled services are booked to arrive on a later day than they depart: Rehman Baba Express 47UP, Allama Iqbal Express 9UP, Pak Business 33UP, Millat Express 17UP and others.
Do trains lose time between Nawabshah Jn. and Bahawalpur?
Typically yes. Khyber Mail 1UP adds about 1h 39m to its delay over this leg, measured across 33 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Nawabshah Jn. to Bahawalpur by train?
It is between 534 and 542 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails.
Are these Nawabshah Jn. to Bahawalpur timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.