Hazara Express 11UP — within 15 minutes of the scheduled time 24% of the time, typically 53 minutes late, over 8 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Nawabshah Jn. to Rahim Yar Khan it typically makes up 21 min, from 36 recorded runs. At Rahim Yar Khan it has typically arrived 43 minutes late, from 41 recorded runs.
Every train, compared
9 of 11 with 7+ daysOver this leg is the CHANGE in a train's delay between Nawabshah Jn. and Rahim Yar Khan on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Nawabshah Jn. — no booked arrival at Nawabshah Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 37Fareed Express 37UP | 00:55 +1d | 07:30 +1d | 6h 35m | 362 km | +1h 25m | 6% | adds 26 min · 28 |
| 1Khyber Mail 1UP | 02:45 +1d | 08:40 +1d | 5h 55m | 359 km | +1h 31m | 9% | adds 1h 13m · 33 |
| 27Shalimar Express 27UP | 10:58 | 16:10 | 5h 12m | 358 km | +57 min | 20% | adds 35 min · 24 |
| 11Hazara Express 11UP | 12:00 | 19:30 | 7h 30m | 361 km | +53 min | 24% | makes up 21 min · 36 |
| 13Awam Express 13UP | 12:50 | 20:31 | 7h 41m | 360 km | +1h 50m | 5% | adds 29 min · 37 |
| 47Rehman Baba Express 47UP | 16:39 | 23:23 | 6h 44m | 359 km | +1h 32m | 11% | adds 27 min · 33 |
| 9Allama Iqbal Express 9UP | 20:10 | 03:18 +1d | 7h 08m | 359 km | +3h 58m | 4% | makes up 12 min · 35 |
| 33Pak Business 33UP | 20:15 | 02:22 +1d | 6h 07m | 357 km | — | — | adds 4 min · 35 |
| 17Millat Express 17UP | 21:34 | 03:55 +1d | 6h 21m | 360 km | +3h 34m | 0% | adds 40 min · 38 |
| 7Tezgam 7UP | 22:00 | 04:34 +1d | 6h 34m | 357 km | +2h 13m | 4% | adds 5 min · 33 |
| 25Bahauddin Zikria Express 25UP | 23:46 | 05:24 +1d | 5h 38m | 360 km | — | — | adds 1h 13m · 22 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Fareed Express 37UP37فرید ایکسپریس 37 اپ00:55 +1d→07:30 +1d6h 35m6% on time · +1h 25madds 26 min over this leg · 28 runs
- Khyber Mail 1UP1خیبر میل 1 اپ02:45 +1d→08:40 +1d5h 55m9% on time · +1h 31madds 1h 13m over this leg · 33 runs
- Shalimar Express 27UP27شالیمار ایکسپریس 27 اپ10:58→16:105h 12m20% on time · +57 minadds 35 min over this leg · 24 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ12:00→19:307h 30m24% on time · +53 minmakes up 21 min over this leg · 36 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ12:50→20:317h 41m5% on time · +1h 50madds 29 min over this leg · 37 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ16:39→23:236h 44m11% on time · +1h 32madds 27 min over this leg · 33 runs
- Allama Iqbal Express 9UP9علامہ اقبال ایکسپریس 9 اپ20:10→03:18 +1d7h 08m4% on time · +3h 58mmakes up 12 min over this leg · 35 runs
- Pak Business 33UP33پاک بزنس 33 اپ20:15→02:22 +1d6h 07mno delay figure yetadds 4 min over this leg · 35 runs
- Millat Express 17UP17ملت ایکسپریس 17 اپ21:34→03:55 +1d6h 21m0% on time · +3h 34madds 40 min over this leg · 38 runs
- Tezgam 7UP7تيزگام 7 اپ22:00→04:34 +1d6h 34m4% on time · +2h 13madds 5 min over this leg · 33 runs
- Bahauddin Zikria Express 25UP25بہائو الدین زکریا ایکسپری25 اپ23:46→05:24 +1d5h 38mno delay figure yetadds 1h 13m over this leg · 22 runs
Travelling the other way? Rahim Yar Khan to Nawabshah Jn. trains →
Common questions
How many trains run from Nawabshah Jn. to Rahim Yar Khan?
11 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Nawabshah Jn. to Rahim Yar Khan?
Shalimar Express 27UP, booked at 5h 12m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Nawabshah Jn. to Rahim Yar Khan is most likely to be on time?
Hazara Express 11UP has the best recorded punctuality of the services we hold enough history for: 24% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 53 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 11 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Nawabshah Jn. to Rahim Yar Khan?
Yes. 5 of the 11 scheduled services are booked to arrive on a later day than they depart: Allama Iqbal Express 9UP, Pak Business 33UP, Millat Express 17UP, Tezgam 7UP and others.
Do trains lose time between Nawabshah Jn. and Rahim Yar Khan?
Typically yes. Khyber Mail 1UP adds about 1h 13m to its delay over this leg, measured across 33 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Nawabshah Jn. to Rahim Yar Khan by train?
It is between 357 and 362 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails.
Are these Nawabshah Jn. to Rahim Yar Khan timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.