Rahim Yar Khan to Drigh Road
Millat Express 18DN — within 15 minutes of the scheduled time 28% of the time, typically 70 minutes late, over 26 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rahim Yar Khan to Drigh Road it typically adds 1h 10m, from 50 recorded runs. At Drigh Road it has typically arrived 178 minutes late, from 83 recorded runs.
Every train, compared
11 of 11 with 7+ daysOver this leg is the CHANGE in a train's delay between Rahim Yar Khan and Drigh Road on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rahim Yar Khan — no booked arrival at Rahim Yar Khan to measure from at all. Figures cover runs recorded between 30 July 2026 and 14 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 34Pak Business 34DN | 00:19 +1d | 11:01 +1d | 10h 42m | +2h 28m | 9% | adds 55 min · 50 |
| 48Rehman Baba Express 48DN | 04:51 +1d | 16:23 +1d | 11h 32m | +2h 37m | 10% | adds 1h 14m · 55 |
| 14Awam Express 14DN | 05:34 +1d | 18:41 +1d | 13h 07m | +1h 38m | 10% | adds 55 min · 51 |
| 12Hazara Express 12DN | 11:35 +1d | 00:00 +2d | 12h 25m | +1h 34m | 12% | makes up 3 min · 52 |
| 2Khyber Mail 2DN | 18:14 +1d | 05:48 +2d | 11h 34m | +2h 11m | 6% | adds 1h 10m · 30 |
| 38Fareed Express 38DN | 19:29 | 07:16 +1d | 11h 47m | +1h 03m | 15% | adds 31 min · 48 |
| 26Bahauddin Zikria Express 26DN | 20:39 | 08:02 +1d | 11h 23m | +2h 15m | 9% | adds 1h 09m · 37 |
| 46Pakistan Express 46DN | 21:14 | 08:18 +1d | 11h 04m | +2h 39m | 4% | adds 1h 16m · 53 |
| 10Allama Iqbal Express 10DN | 21:34 | 08:48 +1d | 11h 14m | +58 min | 22% | adds 1h 07m · 53 |
| 18Millat Express 18DN | 22:26 | 09:28 +1d | 11h 02m | +1h 10m | 28% | adds 1h 10m · 50 |
| 8Tezgam 8DN | 22:49 | 09:55 +1d | 11h 06m | +1h 12m | 11% | adds 1h 22m · 55 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Pak Business 34DN34پاک بزنس 34 ڈائون00:19 +1d→11:01 +1d10h 42m9% on time · +2h 28madds 55 min over this leg · 50 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن04:51 +1d→16:23 +1d11h 32m10% on time · +2h 37madds 1h 14m over this leg · 55 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون05:34 +1d→18:41 +1d13h 07m10% on time · +1h 38madds 55 min over this leg · 51 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن11:35 +1d→00:00 +2d12h 25m12% on time · +1h 34mmakes up 3 min over this leg · 52 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون18:14 +1d→05:48 +2d11h 34m6% on time · +2h 11madds 1h 10m over this leg · 30 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون19:29→07:16 +1d11h 47m15% on time · +1h 03madds 31 min over this leg · 48 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون20:39→08:02 +1d11h 23m9% on time · +2h 15madds 1h 09m over this leg · 37 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون21:14→08:18 +1d11h 04m4% on time · +2h 39madds 1h 16m over this leg · 53 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون21:34→08:48 +1d11h 14m22% on time · +58 minadds 1h 07m over this leg · 53 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون22:26→09:28 +1d11h 02m28% on time · +1h 10madds 1h 10m over this leg · 50 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن22:49→09:55 +1d11h 06m11% on time · +1h 12madds 1h 22m over this leg · 55 runs
Travelling the other way? Drigh Road to Rahim Yar Khan trains →
Common questions
How many trains run from Rahim Yar Khan to Drigh Road?
11 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rahim Yar Khan to Drigh Road?
Pak Business 34DN, booked at 10h 42m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rahim Yar Khan to Drigh Road is most likely to be on time?
Millat Express 18DN has the best recorded punctuality of the services we hold enough history for: 28% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 1h 10m. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 11 of 11 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rahim Yar Khan to Drigh Road?
Yes. 8 of the 11 scheduled services are booked to arrive on a later day than they depart: Hazara Express 12DN, Khyber Mail 2DN, Fareed Express 38DN, Bahauddin Zikria Express 26DN and others.
Do trains lose time between Rahim Yar Khan and Drigh Road?
Typically yes. Tezgam 8DN adds about 1h 22m to its delay over this leg, measured across 55 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Rahim Yar Khan to Drigh Road timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.