Rahim Yar Khan to Khanewal Jn
Hazara Express 11UP — within 15 minutes of the scheduled time 15% of the time, typically 92 minutes late, over 26 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rahim Yar Khan to Khanewal Jn it typically adds 16 min, from 41 recorded runs. At Khanewal Jn it has typically arrived 88 minutes late, from 48 recorded runs.
Every train, compared
10 of 10 with 7+ daysOver this leg is the CHANGE in a train's delay between Rahim Yar Khan and Khanewal Jn on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rahim Yar Khan — no booked arrival at Rahim Yar Khan to measure from at all. Figures cover runs recorded between 30 July 2026 and 11 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 45Pakistan Express 45UP | 00:44 +1d | 06:20 +1d | 5h 36m | +4h 31m | 1% | makes up 2 min · 53 |
| 33Pak Business 33UP | 02:24 +1d | 06:05 +1d | 3h 41m | +3h 13m | 5% | adds 19 min · 49 |
| 9Allama Iqbal Express 9UP | 03:20 +1d | 07:25 +1d | 4h 05m | +2h 56m | 3% | adds 47 min · 50 |
| 17Millat Express 17UP | 03:40 +1d | 07:50 +1d | 4h 10m | +1h 35m | 8% | makes up 8 min · 50 |
| 7Tezgam 7UP | 04:36 +1d | 09:35 +1d | 4h 59m | +2h 41m | 4% | adds 18 min · 48 |
| 1Khyber Mail 1UP | 09:40 +1d | 15:35 +1d | 5h 55m | +2h 15m | 4% | adds 32 min · 39 |
| 13Awam Express 13UP | 20:03 | 01:55 +1d | 5h 52m | +2h 20m | 4% | makes up 11 min · 48 |
| 11Hazara Express 11UP | 20:45 | 02:45 +1d | 6h | +1h 32m | 15% | adds 16 min · 41 |
| 47Rehman Baba Express 47UP | 23:27 | 04:21 +1d | 4h 54m | +1h 48m | 9% | adds 23 min · 45 |
| 39Jaffar Express 39UP | 23:52 | 05:00 +1d | 5h 08m | +1h 57m | 2% | adds 6 min · 37 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Pakistan Express 45UP45پاکستان ایکسپریس 45 اپ00:44 +1d→06:20 +1d5h 36m1% on time · +4h 31mmakes up 2 min over this leg · 53 runs
- Pak Business 33UP33پاک بزنس 33 اپ02:24 +1d→06:05 +1d3h 41m5% on time · +3h 13madds 19 min over this leg · 49 runs
- Allama Iqbal Express 9UP9علامہ اقبال ایکسپریس 9 اپ03:20 +1d→07:25 +1d4h 05m3% on time · +2h 56madds 47 min over this leg · 50 runs
- Millat Express 17UP17ملت ایکسپریس 17 اپ03:40 +1d→07:50 +1d4h 10m8% on time · +1h 35mmakes up 8 min over this leg · 50 runs
- Tezgam 7UP7تيزگام 7 اپ04:36 +1d→09:35 +1d4h 59m4% on time · +2h 41madds 18 min over this leg · 48 runs
- Khyber Mail 1UP1خیبر میل 1 اپ09:40 +1d→15:35 +1d5h 55m4% on time · +2h 15madds 32 min over this leg · 39 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ20:03→01:55 +1d5h 52m4% on time · +2h 20mmakes up 11 min over this leg · 48 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ20:45→02:45 +1d6h15% on time · +1h 32madds 16 min over this leg · 41 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ23:27→04:21 +1d4h 54m9% on time · +1h 48madds 23 min over this leg · 45 runs
- Jaffar Express 39UP39جعفر ایکسپریس 39 اپ23:52→05:00 +1d5h 08m2% on time · +1h 57madds 6 min over this leg · 37 runs
Travelling the other way? Khanewal Jn to Rahim Yar Khan trains →
Common questions
How many trains run from Rahim Yar Khan to Khanewal Jn?
10 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rahim Yar Khan to Khanewal Jn?
Pak Business 33UP, booked at 3h 41m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rahim Yar Khan to Khanewal Jn is most likely to be on time?
Hazara Express 11UP has the best recorded punctuality of the services we hold enough history for: 15% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 1h 32m. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 10 of 10 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rahim Yar Khan to Khanewal Jn?
Yes. 4 of the 10 scheduled services are booked to arrive on a later day than they depart: Awam Express 13UP, Hazara Express 11UP, Rehman Baba Express 47UP, Jaffar Express 39UP.
Do trains lose time between Rahim Yar Khan and Khanewal Jn?
Typically yes. Allama Iqbal Express 9UP adds about 47 min to its delay over this leg, measured across 50 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Rahim Yar Khan to Khanewal Jn timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.