Rahim Yar Khan to Landhi Jn.
Shalimar Express 28DN — within 15 minutes of the scheduled time 39% of the time, typically 27 minutes late, over 7 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rahim Yar Khan to Landhi Jn. it typically adds 43 min, from 22 recorded runs. At Landhi Jn. it has typically arrived 78 minutes late, from 30 recorded runs.
Every train, compared
8 of 12 with 7+ daysOver this leg is the CHANGE in a train's delay between Rahim Yar Khan and Landhi Jn. on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rahim Yar Khan — no booked arrival at Rahim Yar Khan to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 34Pak Business 34DN | 00:19 +1d | 10:23 +1d | 10h 04m | 626 km | — | — | adds 1h 21m · 36 |
| 18Millat Express 18DN | 01:06 +1d | 11:30 +1d | 10h 24m | 627 km | +2h 35m | 8% | adds 1h 29m · 38 |
| 48Rehman Baba Express 48DN | 04:51 +1d | 15:41 +1d | 10h 50m | 627 km | +1h 56m | 14% | adds 1h 38m · 36 |
| 14Awam Express 14DN | 05:34 +1d | 18:16 +1d | 12h 42m | 629 km | +2h 14m | 8% | adds 1h 24m · 36 |
| 12Hazara Express 12DN | 11:35 +1d | 23:22 +1d | 11h 47m | 630 km | — | — | adds 10 min · 34 |
| 28Shalimar Express 28DN | 16:42 | 02:00 +1d | 9h 18m | not measured yet | +27 min | 39% | adds 43 min · 22 |
| 2Khyber Mail 2DN | 18:04 +1d | 04:08 +2d | 10h 04m | 628 km | +2h 12m | 8% | adds 1h 47m · 20 |
| 38Fareed Express 38DN | 19:29 | 06:38 +1d | 11h 09m | not measured yet | +44 min | 16% | adds 46 min · 28 |
| 26Bahauddin Zikria Express 26DN | 20:39 | 07:22 +1d | 10h 43m | 629 km | — | — | adds 1h 26m · 21 |
| 46Pakistan Express 46DN | 21:14 | 07:42 +1d | 10h 28m | 627 km | +1h 04m | 4% | adds 1h 39m · 37 |
| 10Allama Iqbal Express 10DN | 21:34 | 08:10 +1d | 10h 36m | 629 km | +1h 11m | 24% | adds 1h 35m · 35 |
| 8Tezgam 8DN | 22:49 | 09:15 +1d | 10h 26m | 624 km | — | — | adds 1h 44m · 36 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Pak Business 34DN34پاک بزنس 34 ڈائون00:19 +1d→10:23 +1d10h 04mno delay figure yetadds 1h 21m over this leg · 36 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون01:06 +1d→11:30 +1d10h 24m8% on time · +2h 35madds 1h 29m over this leg · 38 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن04:51 +1d→15:41 +1d10h 50m14% on time · +1h 56madds 1h 38m over this leg · 36 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون05:34 +1d→18:16 +1d12h 42m8% on time · +2h 14madds 1h 24m over this leg · 36 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن11:35 +1d→23:22 +1d11h 47mno delay figure yetadds 10 min over this leg · 34 runs
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون16:42→02:00 +1d9h 18m39% on time · +27 minadds 43 min over this leg · 22 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون18:04 +1d→04:08 +2d10h 04m8% on time · +2h 12madds 1h 47m over this leg · 20 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون19:29→06:38 +1d11h 09m16% on time · +44 minadds 46 min over this leg · 28 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون20:39→07:22 +1d10h 43mno delay figure yetadds 1h 26m over this leg · 21 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون21:14→07:42 +1d10h 28m4% on time · +1h 04madds 1h 39m over this leg · 37 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون21:34→08:10 +1d10h 36m24% on time · +1h 11madds 1h 35m over this leg · 35 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن22:49→09:15 +1d10h 26mno delay figure yetadds 1h 44m over this leg · 36 runs
Travelling the other way? Landhi Jn. to Rahim Yar Khan trains →
Common questions
How many trains run from Rahim Yar Khan to Landhi Jn.?
12 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rahim Yar Khan to Landhi Jn.?
Shalimar Express 28DN, booked at 9h 18m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rahim Yar Khan to Landhi Jn. is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 39% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 27 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 8 of 12 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rahim Yar Khan to Landhi Jn.?
Yes. 7 of the 12 scheduled services are booked to arrive on a later day than they depart: Shalimar Express 28DN, Khyber Mail 2DN, Fareed Express 38DN, Bahauddin Zikria Express 26DN and others.
Do trains lose time between Rahim Yar Khan and Landhi Jn.?
Typically yes. Khyber Mail 2DN adds about 1h 47m to its delay over this leg, measured across 20 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Rahim Yar Khan to Landhi Jn. by train?
It is between 624 and 630 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 10 of the 12 services; the rest of the track on this route has not been traced yet.
Are these Rahim Yar Khan to Landhi Jn. timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.