Sukkur Express 146DN — within 15 minutes of the scheduled time 42% of the time, typically 18 minutes late, over 10 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rohri Jn. to Mehrabpur it typically adds 18 min, from 14 recorded runs. At Mehrabpur it has typically arrived 20 minutes late, from 45 recorded runs.
Every train, compared
9 of 9 with 7+ daysOver this leg is the CHANGE in a train's delay between Rohri Jn. and Mehrabpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rohri Jn. — no booked arrival at Rohri Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 6 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 26Bahauddin Zikria Express 26DN | 00:01 +1d | 01:00 +1d | 59 min | 84 km | +1h 08m | 9% | adds 21 min · 24 |
| 10Allama Iqbal Express 10DN | 00:50 +1d | 01:50 +1d | 1h | 84 km | +54 min | 25% | adds 22 min · 35 |
| 8Tezgam 8DN | 01:55 +1d | 03:02 +1d | 1h 07m | 83 km | +52 min | 18% | adds 26 min · 37 |
| 18Millat Express 18DN | 04:20 +1d | 05:26 +1d | 1h 06m | 84 km | +2h 36m | 10% | adds 16 min · 38 |
| 48Rehman Baba Express 48DN | 08:05 +1d | 09:13 +1d | 1h 08m | 84 km | +2h 18m | 13% | adds 29 min · 36 |
| 14Awam Express 14DN | 09:20 +1d | 10:48 +1d | 1h 28m | 83 km | +2h 03m | 8% | adds 36 min · 36 |
| 12Hazara Express 12DN | 15:20 +1d | 16:35 +1d | 1h 15m | 83 km | +1h 21m | 10% | adds 13 min · 36 |
| 146Sukkur Express 146DN | 21:30 | 23:01 | 1h 31m | not measured yet | +18 min | 42% | adds 18 min · 14 |
| 38Fareed Express 38DN | 23:00 | 00:01 +1d | 1h 01m | not measured yet | +43 min | 14% | adds 14 min · 29 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون00:01 +1d→01:00 +1d59 min9% on time · +1h 08madds 21 min over this leg · 24 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون00:50 +1d→01:50 +1d1h25% on time · +54 minadds 22 min over this leg · 35 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن01:55 +1d→03:02 +1d1h 07m18% on time · +52 minadds 26 min over this leg · 37 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون04:20 +1d→05:26 +1d1h 06m10% on time · +2h 36madds 16 min over this leg · 38 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن08:05 +1d→09:13 +1d1h 08m13% on time · +2h 18madds 29 min over this leg · 36 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون09:20 +1d→10:48 +1d1h 28m8% on time · +2h 03madds 36 min over this leg · 36 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن15:20 +1d→16:35 +1d1h 15m10% on time · +1h 21madds 13 min over this leg · 36 runs
- Sukkur Express 146DN146سکھر ایکسپریس146ڈاؤن21:30→23:011h 31m42% on time · +18 minadds 18 min over this leg · 14 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون23:00→00:01 +1d1h 01m14% on time · +43 minadds 14 min over this leg · 29 runs
Travelling the other way? Mehrabpur to Rohri Jn. trains →
Common questions
How many trains run from Rohri Jn. to Mehrabpur?
9 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rohri Jn. to Mehrabpur?
Bahauddin Zikria Express 26DN, booked at 59 min for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rohri Jn. to Mehrabpur is most likely to be on time?
Sukkur Express 146DN has the best recorded punctuality of the services we hold enough history for: 42% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 18 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 9 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rohri Jn. to Mehrabpur?
Yes. 1 of the 9 scheduled services is booked to arrive on a later day than it departs: Fareed Express 38DN.
Do trains lose time between Rohri Jn. and Mehrabpur?
Typically yes. Awam Express 14DN adds about 36 min to its delay over this leg, measured across 36 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Rohri Jn. to Mehrabpur by train?
It is between 83 and 84 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 7 of the 9 services; the rest of the track on this route has not been traced yet.
Are these Rohri Jn. to Mehrabpur timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.