Sukkur Express 146DN — within 15 minutes of the scheduled time 49% of the time, typically 16 minutes late, over 25 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rohri Jn. to Mehrabpur it typically adds 21 min, from 28 recorded runs. At Mehrabpur it has typically arrived 19 minutes late, from 84 recorded runs.
Every train, compared
9 of 9 with 7+ daysOver this leg is the CHANGE in a train's delay between Rohri Jn. and Mehrabpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rohri Jn. — no booked arrival at Rohri Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 26Bahauddin Zikria Express 26DN | 00:01 | 01:00 +1d | 24h 59m | +1h 29m | 10% | adds 17 min · 46 |
| 10Allama Iqbal Express 10DN | 00:50 +1d | 01:50 +1d | 1h | +43 min | 28% | adds 25 min · 60 |
| 18Millat Express 18DN | 01:30 +1d | 02:30 +1d | 1h | +1h 04m | 30% | adds 22 min · 51 |
| 8Tezgam 8DN | 01:55 +1d | 03:02 +1d | 1h 07m | +1h 09m | 16% | adds 30 min · 61 |
| 48Rehman Baba Express 48DN | 08:05 +1d | 09:13 +1d | 1h 08m | +2h 24m | 10% | adds 36 min · 62 |
| 14Awam Express 14DN | 09:20 +1d | 10:49 +1d | 1h 29m | +1h 20m | 15% | adds 37 min · 51 |
| 12Hazara Express 12DN | 15:20 +1d | 16:35 +1d | 1h 15m | +1h 35m | 14% | adds 21 min · 64 |
| 146Sukkur Express 146DN | 21:30 | 23:01 | 1h 31m | +16 min | 49% | adds 21 min · 28 |
| 38Fareed Express 38DN | 23:00 | 00:01 +1d | 1h 01m | +1h 06m | 16% | adds 22 min · 53 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون00:01→01:00 +1d24h 59m10% on time · +1h 29madds 17 min over this leg · 46 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون00:50 +1d→01:50 +1d1h28% on time · +43 minadds 25 min over this leg · 60 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون01:30 +1d→02:30 +1d1h30% on time · +1h 04madds 22 min over this leg · 51 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن01:55 +1d→03:02 +1d1h 07m16% on time · +1h 09madds 30 min over this leg · 61 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن08:05 +1d→09:13 +1d1h 08m10% on time · +2h 24madds 36 min over this leg · 62 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون09:20 +1d→10:49 +1d1h 29m15% on time · +1h 20madds 37 min over this leg · 51 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن15:20 +1d→16:35 +1d1h 15m14% on time · +1h 35madds 21 min over this leg · 64 runs
- Sukkur Express 146DN146سکھر ایکسپریس146ڈاؤن21:30→23:011h 31m49% on time · +16 minadds 21 min over this leg · 28 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون23:00→00:01 +1d1h 01m16% on time · +1h 06madds 22 min over this leg · 53 runs
Travelling the other way? Mehrabpur to Rohri Jn. trains →
Common questions
How many trains run from Rohri Jn. to Mehrabpur?
9 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rohri Jn. to Mehrabpur?
Allama Iqbal Express 10DN, booked at 1h for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rohri Jn. to Mehrabpur is most likely to be on time?
Sukkur Express 146DN has the best recorded punctuality of the services we hold enough history for: 49% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 16 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 9 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rohri Jn. to Mehrabpur?
Yes. 2 of the 9 scheduled services are booked to arrive on a later day than they depart: Bahauddin Zikria Express 26DN, Fareed Express 38DN.
Do trains lose time between Rohri Jn. and Mehrabpur?
Typically yes. Awam Express 14DN adds about 37 min to its delay over this leg, measured across 51 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Rohri Jn. to Mehrabpur timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.