Green Line 5UP — within 15 minutes of the scheduled time 26% of the time, typically 39 minutes late, over 10 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rohri Jn. to Rawalpindi it typically adds 2h 02m, from 32 recorded runs. At Rawalpindi it has typically arrived 187 minutes late, from 35 recorded runs.
Every train, compared
8 of 9 with 7+ daysOver this leg is the CHANGE in a train's delay between Rohri Jn. and Rawalpindi on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rohri Jn. — no booked arrival at Rohri Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 4 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 7Tezgam 7UP | 02:00 +1d | 20:00 +1d | 18h | 1,078 km | +1h 57m | 5% | adds 2h 42m · 31 |
| 35Sir Sayyed Express 35UP | 04:35 +1d | 21:30 +1d | 16h 55m | not measured yet | — | — | no data |
| 5Green Line 5UP | 05:25 +1d | 20:35 +1d | 15h 10m | 1,032 km | +39 min | 26% | adds 2h 02m · 32 |
| 1Khyber Mail 1UP | 05:55 +1d | 01:20 +2d | 19h 25m | 1,093 km | +1h 45m | 9% | adds 3h 42m · 22 |
| 11Hazara Express 11UP | 16:00 | 13:35 +1d | 21h 35m | 1,041 km | +53 min | 22% | adds 2h 04m · 28 |
| 13Awam Express 13UP | 17:20 | 13:20 +1d | 20h | 1,094 km | +1h 43m | 6% | adds 1h 39m · 36 |
| 47Rehman Baba Express 47UP | 20:40 | 14:25 +1d | 17h 45m | 1,433 km | +1h 46m | 10% | adds 2h 23m · 34 |
| 39Jaffar Express 39UP | 20:50 | 16:00 +1d | 19h 10m | not measured yet | +1h 51m | 0% | adds 2h 25m · 18 |
| 45Pakistan Express 45UP | 22:00 | 17:35 +1d | 19h 35m | 1,024 km | +2h 15m | 3% | adds 1h 26m · 18 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Tezgam 7UP7تيزگام 7 اپ02:00 +1d→20:00 +1d18h5% on time · +1h 57madds 2h 42m over this leg · 31 runs
- Sir Sayyed Express 35UP35سر سید ایکپریس 35اپ04:35 +1d→21:30 +1d16h 55mno delay figure yetno data over this leg
- Green Line 5UP5گرين لائن5 اپ05:25 +1d→20:35 +1d15h 10m26% on time · +39 minadds 2h 02m over this leg · 32 runs
- Khyber Mail 1UP1خیبر میل 1 اپ05:55 +1d→01:20 +2d19h 25m9% on time · +1h 45madds 3h 42m over this leg · 22 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ16:00→13:35 +1d21h 35m22% on time · +53 minadds 2h 04m over this leg · 28 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ17:20→13:20 +1d20h6% on time · +1h 43madds 1h 39m over this leg · 36 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ20:40→14:25 +1d17h 45m10% on time · +1h 46madds 2h 23m over this leg · 34 runs
- Jaffar Express 39UP39جعفر ایکسپریس 39 اپ20:50→16:00 +1d19h 10m0% on time · +1h 51madds 2h 25m over this leg · 18 runs
- Pakistan Express 45UP45پاکستان ایکسپریس 45 اپ22:00→17:35 +1d19h 35m3% on time · +2h 15madds 1h 26m over this leg · 18 runs
Travelling the other way? Rawalpindi to Rohri Jn. trains →
Common questions
How many trains run from Rohri Jn. to Rawalpindi?
9 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rohri Jn. to Rawalpindi?
Green Line 5UP, booked at 15h 10m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rohri Jn. to Rawalpindi is most likely to be on time?
Green Line 5UP has the best recorded punctuality of the services we hold enough history for: 26% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 39 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 8 of 9 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rohri Jn. to Rawalpindi?
Yes. 6 of the 9 scheduled services are booked to arrive on a later day than they depart: Khyber Mail 1UP, Hazara Express 11UP, Awam Express 13UP, Rehman Baba Express 47UP and others.
Do trains lose time between Rohri Jn. and Rawalpindi?
Typically yes. Khyber Mail 1UP adds about 3h 42m to its delay over this leg, measured across 22 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Rohri Jn. to Rawalpindi by train?
It is between 1,024 and 1,433 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 7 of the 9 services; the rest of the track on this route has not been traced yet.
Are these Rohri Jn. to Rawalpindi timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.