Shalimar Express 28DN — within 15 minutes of the scheduled time 39% of the time, typically 27 minutes late, over 25 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Sadiqabad to Hyderabad Jn it typically adds 14 min, from 11 recorded runs. At Hyderabad Jn it has typically arrived 61 minutes late, from 77 recorded runs.
Every train, compared
9 of 9 with 7+ daysOver this leg is the CHANGE in a train's delay between Sadiqabad and Hyderabad Jn on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Sadiqabad — no booked arrival at Sadiqabad to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 14Awam Express 14DN | 05:56 +1d | 15:55 +1d | 9h 59m | +1h 22m | 15% | makes up 7 min · 62 |
| 12Hazara Express 12DN | 11:57 +1d | 21:05 +1d | 9h 08m | +1h 32m | 15% | makes up 25 min · 60 |
| 28Shalimar Express 28DN | 16:54 | 23:45 | 6h 51m | +27 min | 39% | adds 14 min · 11 |
| 2Khyber Mail 2DN | 18:37 +1d | 03:00 +2d | 8h 23m | +1h 58m | 8% | adds 36 min · 33 |
| 38Fareed Express 38DN | 19:51 | 04:25 +1d | 8h 34m | +1h 05m | 16% | makes up 14 min · 52 |
| 26Bahauddin Zikria Express 26DN | 21:02 | 05:10 +1d | 8h 08m | +1h 33m | 10% | adds 18 min · 43 |
| 46Pakistan Express 46DN | 21:36 | 05:35 +1d | 7h 59m | +2h 26m | 4% | adds 28 min · 61 |
| 10Allama Iqbal Express 10DN | 21:56 | 06:00 +1d | 8h 04m | +44 min | 28% | adds 28 min · 59 |
| 18Millat Express 18DN | 22:47 | 06:40 +1d | 7h 53m | +1h | 31% | adds 25 min · 50 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون05:56 +1d→15:55 +1d9h 59m15% on time · +1h 22mmakes up 7 min over this leg · 62 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن11:57 +1d→21:05 +1d9h 08m15% on time · +1h 32mmakes up 25 min over this leg · 60 runs
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون16:54→23:456h 51m39% on time · +27 minadds 14 min over this leg · 11 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون18:37 +1d→03:00 +2d8h 23m8% on time · +1h 58madds 36 min over this leg · 33 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون19:51→04:25 +1d8h 34m16% on time · +1h 05mmakes up 14 min over this leg · 52 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون21:02→05:10 +1d8h 08m10% on time · +1h 33madds 18 min over this leg · 43 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون21:36→05:35 +1d7h 59m4% on time · +2h 26madds 28 min over this leg · 61 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون21:56→06:00 +1d8h 04m28% on time · +44 minadds 28 min over this leg · 59 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون22:47→06:40 +1d7h 53m31% on time · +1hadds 25 min over this leg · 50 runs
Travelling the other way? Hyderabad Jn to Sadiqabad trains →
Common questions
How many trains run from Sadiqabad to Hyderabad Jn?
9 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Sadiqabad to Hyderabad Jn?
Shalimar Express 28DN, booked at 6h 51m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Sadiqabad to Hyderabad Jn is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 39% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 27 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 9 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Sadiqabad to Hyderabad Jn?
Yes. 6 of the 9 scheduled services are booked to arrive on a later day than they depart: Khyber Mail 2DN, Fareed Express 38DN, Bahauddin Zikria Express 26DN, Pakistan Express 46DN and others.
Do trains lose time between Sadiqabad and Hyderabad Jn?
Typically yes. Khyber Mail 2DN adds about 36 min to its delay over this leg, measured across 33 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Sadiqabad to Hyderabad Jn timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.