latetrains.pkLate, on recordTrain delays · independent
Trains/Tezgam 8DN/17 November 2026

Tezgam 8DN — the run of 17 November 2026

The recorded journey of the run that departed Tuesday 17 November 2026.
RouteRawalpindi → Karachi Cantt
First recordedChaklala, 08:11+1 min — names where it was first seen, not necessarily its origin
At Karachi Cantt12:51+2h 22m

Reached Karachi Cantt at 12:51 on 18 November 2026, 142 minutes late — from our recorded crossing.

Every recorded crossing

this run only
Show the 29 earlier stops
  1. RawalpindiCrossedArrive—Depart08:00Delayon time
  2. ChaklalaCrossedArrive08:0908:11Depart08:1108:13Delay+1 min
  3. Gujar KhanCrossedArrive08:5209:17Depart08:5409:17Delay+24 min
  4. JhelumCrossedArrive10:0610:32Depart10:0810:31Delay+25 min
  5. Lala Musa Jn.CrossedArrive11:0011:05Depart11:0511:16Delay+1 min
  6. GujratCrossedArrive11:2211:32Depart11:2411:36Delay+9 min
  7. Wazirabad JnCrossedArrive11:4011:52Depart11:4211:59Delay+10 min
  8. GujranwalaCrossedArrive12:1012:28Depart12:1512:34Delay+13 min
  9. Lahore Jn.CrossedArrive13:1513:24Depart13:4514:04Delayon time
  10. Raiwind Jn.CrossedArrive14:2014:40Depart14:2514:46Delay+15 min
  11. PattokiCrossedArrive14:5615:16Depart14:5815:21Delay+18 min
  12. OkaraCrossedArrive15:4115:52Depart15:43Delay+9 min
  13. SahiwalCrossedArrive16:2716:25Depart16:2916:32Delayon time
  14. ChichawatniCrossedArrive17:0017:05Depart17:0217:09Delay+3 min
  15. Mian ChannuCrossedArrive17:2817:34Depart17:3017:37Delay+4 min
  16. Khanewal JnCrossedArrive18:1018:15Depart18:1518:24Delayon time
  17. Multan CanttCrossedArrive18:5018:59Depart19:1019:28Delay+10 min
  18. BahawalpurCrossedArrive20:2520:40Depart20:29Delay+11 min
  19. Khanpur Jn.CrossedArrive22:1022:52Depart22:1523:04Delay+37 min
  20. Rahim Yar KhanCrossedArrive22:4723:45Depart22:4923:49Delay+56 min
  21. GhotkiCrossedArrive00:23 +1d01:49Depart00:25 +1d01:53Delay+1h 24m
  22. Rohri Jn.CrossedArrive01:30 +1d03:42Depart01:55 +1d04:18Delay+1h 47m
  23. KhairpurCrossedArrive02:22 +1d04:40Depart02:24 +1d04:42Delay+2h 16m
  24. MehrabpurCrossedArrive03:02 +1d05:24Depart03:04 +1d05:31Delay+2h 20m
  25. Nawabshah Jn.CrossedArrive04:54 +1d07:15Depart04:56 +1d07:25Delay+2h 20m
  26. ShahdadpurCrossedArrive05:47 +1d07:57Depart05:49 +1d08:01Delay+2h 09m
  27. Tando AdamCrossedArrive06:22 +1d08:39Depart06:24 +1d08:39Delay+2h 17m
  28. Hyderabad JnCrossedArrive07:10 +1d09:39Depart07:15 +1d09:55Delay+2h 24m
  29. Landhi Jn.CrossedArrive09:15 +1d12:11Depart09:17 +1dDelay+2h 54m
  1. Drigh RoadCrossedArrive09:55 +1d12:31Depart09:57 +1d12:36Delay+2h 34m
  2. Karachi CanttCrossedArrive10:30 +1d12:51Depart— +1dDelay+2h 22m

Recorded times come from Pakistan Railways’ control room or from the train’s GPS.

The shape of the run

from the GPS trail

Where this run lost time, where it stood at a stop, and where its tracker went dark — the same journey as the table above, drawn from the raw position trail.

8,180 GPS positions recorded between 17 Nov 07:17 and 18 Nov 12:51 PKT · 30 of 31 scheduled stops have a recorded time.

How fast it was going

km along the route — route distance from traced track geometry; 0 of 30 stop-to-stop segments measured straight-line.

How late it was running — each step is a station

How long it stopped at each scheduled stop

What the marks mean
  • A blank means the train’s tracker stopped reporting — it does not mean the train stopped or anything happened to it. 20 gaps on this run, 265 min total.
  • 0 readings above 120 km/h, 0 not corroborated by the position trail. All values shown as recorded.
  • Grey bar: how long the timetable allows here. Coloured bar: how long it actually stopped, with the figure printed under it. A stand longer than the scale is drawn capped and marked ▲ — the printed figure is always the recorded one. A dash means how long it stood there is unknown — not zero: either no departure was recorded, or the two recorded clocks contradict each other.
  • An unwitnessed stop breaks the lateness line — it does not interpolate across it.
  • Route distance is measured from traced track geometry where we have it, straight line between the two stations otherwise.

The upper trace above is recorded GPS positions; the lower trace is recorded station crossings — the same crossings shown in the table near the top of this page. A gap in one trace is not a gap in the other.